X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-031-25535

Well Details

Well ID: 37-031-25535
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Porter Township
Operator Name: NORTHEAST NATURAL ENERGY LLC
Well Pad ID: 149370
Farm/Lease Name: STEWART 3H
License Status:
Spud Date:
Permit Date: 2011-07-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.051056
Longitude: -79.440483

For data sources see[1][2][3]

Well History

Date Event
2011-07-21 New Permit Application
2011-08-06 Performed Spud Operation
2011-11-09 Drilling Completion
2012-01-31 New Permit Application
2012-07-09 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 NORTHEAST NATURAL ENERGY LLC 0.00 0 0.00 0 0.00 0
2012 NORTHEAST NATURAL ENERGY LLC 518,260.00 326 0.00 0 14.65 150
2013 NORTHEAST NATURAL ENERGY LLC 389,556.00 365 0.00 0 0.00 0
2014 NORTHEAST NATURAL ENERGY LLC 303,400.00 362 0.00 0 0.00 0
2015 NORTHEAST NATURAL ENERGY LLC 257,733.00 365 0.00 0 0.00 0
2016 NORTHEAST NATURAL ENERGY LLC 175,422.00 243 0.00 0 0.00 0
2017 NORTHEAST NATURAL ENERGY LLC 205,032.00 356 0.00 0 0.00 0
2018 NORTHEAST NATURAL ENERGY LLC 165,679.92 339 0.00 0 0.00 0
2019 NORTHEAST NATURAL ENERGY LLC 150,400.00 352 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 NORTHEAST NATURAL ENERGY LLC Drilling Fluid Waste 1,080.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 0250050885
2011 NORTHEAST NATURAL ENERGY LLC Drill Cuttings 350.00 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 0250050885
2011 NORTHEAST NATURAL ENERGY LLC Produced Fluid 483.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 NORTHEAST NATURAL ENERGY LLC Produced Fluid 17,697.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 NORTHEAST NATURAL ENERGY LLC Fracing Fluid Waste 10,782.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 NORTHEAST NATURAL ENERGY LLC Fracturing Fluid Waste 3.30 Tons STORAGE PENDING DISPOSAL OR REUSE
2012 NORTHEAST NATURAL ENERGY LLC Produced Fluid 5,345.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 1,700.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 1,091.00 Bbl INJECTION DISPOSAL WELL 34-099-2-1956
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 733.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 33.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 2,799.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 587.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 587.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 701.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 NORTHEAST NATURAL ENERGY LLC Produced Fluid 51.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2014 NORTHEAST NATURAL ENERGY LLC Produced Fluid 4,510.85 Bbl INJECTION DISPOSAL WELL 34-099-2-1956
2015 NORTHEAST NATURAL ENERGY LLC Produced Fluid 788.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 NORTHEAST NATURAL ENERGY LLC Produced Fluid 252.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 NORTHEAST NATURAL ENERGY LLC Produced Fluid 382.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2015 NORTHEAST NATURAL ENERGY LLC Produced Fluid 301.02 Bbl INJECTION DISPOSAL WELL 34-099-23158
2015 NORTHEAST NATURAL ENERGY LLC Produced Fluid 5,069.00 Bbl INJECTION DISPOSAL WELL 34-099-2-1956
2015 NORTHEAST NATURAL ENERGY LLC Produced Fluid 788.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 NORTHEAST NATURAL ENERGY LLC Produced Fluid 293.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 NORTHEAST NATURAL ENERGY LLC Produced Fluid 794.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 NORTHEAST NATURAL ENERGY LLC Produced Fluid 461.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2016 NORTHEAST NATURAL ENERGY LLC Produced Fluid 402.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 NORTHEAST NATURAL ENERGY LLC Produced Fluid 68.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 NORTHEAST NATURAL ENERGY LLC Produced Fluid 293.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 NORTHEAST NATURAL ENERGY LLC Produced Fluid 1,731.95 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 NORTHEAST NATURAL ENERGY LLC Produced Fluid 1,383.78 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 NORTHEAST NATURAL ENERGY LLC Produced Fluid 1,635.39 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 NORTHEAST NATURAL ENERGY LLC Produced Fluid 1,175.31 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 NORTHEAST NATURAL ENERGY LLC Produced Fluid 777.06 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 NORTHEAST NATURAL ENERGY LLC Produced Fluid 2,361.37 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2004476 Primary Facility 2011-09-06 Routine/Complete Inspection No Violations Noted
2005235 Primary Facility 2011-09-26 Routine/Complete Inspection No Violations Noted
2012801 Primary Facility 2011-10-11 Drilling/Alteration No Violations Noted
2012804 Primary Facility 2011-10-14 Drilling/Alteration No Violations Noted
2026598 Primary Facility 2011-12-13 Drilling/Alteration No Violations Noted
2026904 Primary Facility 2011-12-06 Routine/Complete Inspection No Violations Noted
2036109 Primary Facility 2012-01-19 Routine/Complete Inspection No Violations Noted
2037469 Primary Facility 2012-01-24 Drilling/Alteration No Violations Noted
2041116 Primary Facility 2012-02-02 Routine/Complete Inspection No Violations Noted
2068559 Primary Facility 2012-05-14 Routine/Complete Inspection No Violations Noted
2116950 Primary Facility 2012-11-15 Routine/Complete Inspection No Violations Noted
2154491 Primary Facility 2013-03-27 Routine/Complete Inspection No Violations Noted
2643782 Primary Facility 2017-09-29 Routine/Complete Inspection No Violations Noted This site located south off Stewart Road in an agricultural field. This well and well 031-25538 were drilled on ths site, have been completed and are producing. Production reports submitted monthly 2014-2017. Production reporting for 2017 shows production in February and April.

No violations observed.

2686207 Primary Facility 2018-01-25 Routine/Partial Inspection No Violations Noted Well is equipped with a plunger lift system. Moderate corrosion on the tubing head.
2763152 Primary Facility 2018-08-14 Routine/Partial Inspection No Violations Noted This site located west off Grover Road in an agricultural field, the wells are set-up for production with tanks and separators that are set west of the remaining well pad. Production reporting has been submitted from 2012 through June 2018.

No violations observed.

2770918 Primary Facility 2018-08-30 Routine/Partial Inspection No Violations Noted At the time of inspection, well appeared to be producing. There was 531 psi on the casing gauge and 223 psi on the tubing. Well integrity appeared to be in good condition, with no signs of any leaks or spills. The well was properly labeled and the Emergency Response sign was posted at the entrance to the site. Well was hooked up to an IPS Pacemaker Plunger. Cellar was covered with a steel grate. The pad had 2 line heater / separator units and contained within a lined, steel dike were a large and small steel tank as well as a small, plastic tank. Production is being reported to the Department.
2788623 Primary Facility 2018-10-15 Administrative/File Review No Violations Noted
2792600 Primary Facility 2018-10-22 Routine/Partial Inspection No Violations Noted This site located west off Grover Road in an agricultural field, the wells are set-up for production with tanks and separators set along the access road west of the remaining well pad. Production reporting has been submitted from 2012 through August 2018.

Some earth work in process near the production equipment, this area needs stabilized with seed and mulch upon completion.

No violations observed.

For data sources see[7]

References