If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-031-25600 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.393094,"lon":-79.369611,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clarion | |
Municipality: Washington Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148897 | |
Farm/Lease Name: MILYO UNIT 1H | |
License Status: Plugged and Abandoned | |
Spud Date: 2012-06-14 | |
Permit Date: 2012-06-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.393094 | |
Longitude: -79.369611 |
Date | Event |
---|---|
2012-06-08 | New Permit Application |
2012-06-14 | Performed Spud Operation |
2013-03-24 | Drilling Completion |
2013-08-28 | Perforation |
2015-11-09 | DEVIATED |
2018-05-05 | Begin Plugging |
2018-05-05 | Finished Plugging |
2018-08-30 | Fully Plugged |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-28 | 2013-09-10 | 5,211 | 4,449,980 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | EC 6116a | Nalco | Biocide | 1, 1-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00767 | 0 |
Polyethylene Glycol | 25322-68-3 | 60 | 0.01534 | 0 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00128 | 0 | ||||
GBL | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00006000 | 0 | |
15% Hcl Acid | Reagent/PPG | Used to open perfs | Hydrochloric Acid | 7647-01-0 | 15 | 0.11739 | 0 | |
CMHPG | Ashland | Water Viscosifier | Carboxymethyl Hydroxporoyl Guar Blend | 68130-15-4 | 100 | 0.00373 | 0 | |
ASP 900 | Nalco | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | |||
Proppant | Chevron Applachia, LLC | Proppant | Crystalline Silica | 14808-60-7 | 100 | 8.41 | 0 | |
Clean Volume | Chevron Applachia, LLC | Carrier/Base Fluid | H20 | 7732-18-5 | 100 | 91.59 | 0 | |
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00747 | 0 | |
Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00711 | 0 | |
Unislik ST 50 | CESI | Friction Reducer | Hydrotreated Light Distillite | 64742-47-8 | 30 | 0.02956 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 36.95 Tons | LANDFILL | 101397 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 17,614.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 876.25 Tons | LANDFILL | 101397 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 955.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 6,740.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 69.39 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 432.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 12.73 Tons | LANDFILL | SWF 1025 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,000.00 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2076343 | Primary Facility | 2012-06-14 | Drilling/Alteration | No Violations Noted | |
2077789 | Primary Facility | 2012-06-20 | Drilling/Alteration | No Violations Noted | |
2081110 | Primary Facility | 2012-06-29 | Drilling/Alteration | No Violations Noted | |
2094728 | Primary Facility | 2012-08-17 | Drilling/Alteration | No Violations Noted | |
2099036 | Primary Facility | 2012-09-11 | Routine/Complete Inspection | Violation(s) Noted | |
2120779 | Primary Facility | 2012-11-28 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2122329 | Primary Facility | 2012-12-05 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2122351 | Primary Facility | 2012-11-28 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2122377 | Primary Facility | 2012-11-20 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2124208 | Primary Facility | 2012-12-03 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2124211 | Primary Facility | 2012-12-13 | Compliance Evaluation | No Violations Noted | |
2128436 | Primary Facility | 2013-01-08 | Routine/Complete Inspection | No Violations Noted | |
2140721 | Primary Facility | 2013-02-14 | Routine/Complete Inspection | No Violations Noted | |
2150526 | Primary Facility | 2013-03-22 | Drilling/Alteration | No Violations Noted | |
2156979 | Primary Facility | 2013-04-09 | Routine/Complete Inspection | No Violations Noted | |
2208060 | Primary Facility | 2013-09-05 | Routine/Partial Inspection | No Violations Noted | |
2208065 | Primary Facility | 2013-09-18 | Routine/Partial Inspection | No Violations Noted | |
2286889 | Primary Facility | 2014-07-09 | Routine/Partial Inspection | No Violations Noted | |
2357007 | Primary Facility | 2015-03-23 | Routine/Complete Inspection | No Violations Noted | |
2366704 | Primary Facility | 2015-04-27 | Site Restoration | No Violations Noted | |
2383747 | Primary Facility | 2015-06-16 | Routine/Partial Inspection | No Violations Noted | |
2420174 | Primary Facility | 2015-10-29 | Administrative/File Review | No Violations Noted | |
2420176 | Primary Facility | 2015-10-29 | Administrative/File Review | No Violations Noted | |
2423262 | Primary Facility | 2015-11-09 | Administrative/File Review | No Violations Noted | Completion report needs open flow and shut in pressures. |
2557156 | Primary Facility | 2017-01-31 | Routine/Complete Inspection | No Violations Noted | |
2714052 | Primary Facility | 2018-04-04 | Administrative/File Review | No Violations Noted | Reviewed Plugging Alternate Method. |
2726788 | Primary Facility | 2018-05-07 | Administrative/File Review | No Violations Noted | Reviewed Notice of Intent to Plug. |
2745954 | Primary Facility | 2018-06-27 | Administrative/File Review | No Violations Noted | Reviewed plugging certificate. |
2756053 | Primary Facility | 2018-07-25 | Site Restoration | No Violations Noted | This site located west off route 208 in an agricultural field. The wells on this pad have been plugged and there is a construction crew on site working on restoration.
The restoration plan submitted for the restoration of this site on 5/25/18 was not approved. The restoration plan does not address treatment which includes long term operation and maintenance of the acid flow of water that was created during the construction of this well pad. The plan does not address the areas of concern on the embankment above the well as they are also flowing with impacted water. These issues need to be addressed immediately to avoid violations. Trucks are hauling topsoil from Titusville and stock piling it on site south off the access road just west of route 208. |
2761513 | Primary Facility | 2018-08-08 | Site Restoration | No Violations Noted | This site located west off route 208 in an agricultural field. The wells on this pad have been plugged and site restoration has been completed. Restored site stabilized with seed and mulch.
The restoration plan submitted for the restoration of this site on 5/25/18 was not approved. The restoration plan does not address treatment which includes long term operation and maintenance of the acid flow of water that was created during the construction of this well pad. The plan does not address the areas of concern on the embankment above the well as they are also flowing with impacted water. These issues need to be addressed immediately to avoid violations. |
2772785 | Primary Facility | 2018-09-10 | Administrative/File Review | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2099036 | 648883 | 09/11/2012 | 2012-09-11 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
648883 | 288503 | NOV - Notice of Violation | Comply/Closed | 2015-02-24 | |||
648883 | 320959 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2015-02-24 | 2015-02-24 | $21,400.00 | $21,400.00 |
For data sources see[8]