X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-033-25769

Well Details

Well ID: 37-033-25769
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Huston Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: CHAGRIN BEL 15
License Status: ACTIVE
Spud Date:
Permit Date: 2005-03-04
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.208254
Longitude: -78.563974

For data sources see[1][2][3]

Well History

Date Event
2005-03-04 New Permit Application
2005-03-30 Performed Spud Operation
2005-04-02 Drilling Completion
2005-04-21 Perforation
2005-09-13 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 MID EAST OIL CO 9048.00 207 0.00 0 0.00 0
2007 NORTH EAST GAS & OIL CO 7283.00 355 0.00 0 0.00 0
2008 NORTH EAST GAS & OIL CO 5024.00 355 0.00 0 0.00 0
2009 NORTH EAST GAS & OIL CO 3760.00 346 0.00 0 0.00 0
2010 NORTH EAST GAS & OIL CO 3,013.00 351 0.00 0 0.00 0
2011 NORTH EAST GAS & OIL CO 2,781.00 353 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 718.00 153 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 1,476.00 365 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 1,047.00 365 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 1,087.20 365 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 1,548.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 1,243.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 922.21 365 0.00 0 0.00 0
2019 DANNIC ENERGY CORP 648.19 275 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 MID EAST OIL CO Brine 60.00 Bbl Landfill 101397
2012 DANNIC ENERGY CORP Produced Fluid 45.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2015 DANNIC ENERGY CORP Produced Fluid 3,360.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2018 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2019 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1454156 Primary Facility 2005-06-01 Complaint Inspection No Violations Noted
1473604 Primary Facility 2005-08-16 Routine/Complete Inspection No Violations Noted
1499800 Primary Facility 2005-12-09 Administrative/File Review Violation(s) Noted Shires water supply replacement
2826805 Primary Facility 2019-01-15 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Dannic Energy Corp conventional well (033-25769) on January 15, 2019. The area surrounding the production equipment has been restored. Restored site appears well vegetated and is partially snow covered. No signs of E&S issues. Poly brine tank stationed onsite. Chart recorder is dated 12/31/18. Flakey paint and corrosion were observed on the well head, separator, and axillary piping. The Department recommends monitoring the production equipment and replacing and/or repainting the equipment if necessary. Department staff used an Altair 5x gas meter during the inspection. No combustible gases or methane were detected.

No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1499800 478911 12/09/2005 2005-12-09 208A - Failure to restore a water supply affected by pollution or diminution Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
478911 202751 ADORD - Administrative Order Comply/Closed 2006-01-25

For data sources see[7]

References