If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21270 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.409592,"lon":-77.620989,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148997 | |
Farm/Lease Name: PA TRACT E 3H | |
License Status: | |
Spud Date: 2011-12-05 | |
Permit Date: 2011-11-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.409592 | |
Longitude: -77.620989 |
Date | Event |
---|---|
2011-11-14 | New Permit Application |
2011-12-05 | Performed Spud Operation |
2012-02-05 | Drilling Completion |
2012-10-19 | DEVIATED |
2013-04-10 | Perforation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-05-21 | 2013-07-02 | 8,200 | 4,614,580 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Nabors | Proppant | Silica Substrate | NA | 100 | 11.8836 | 5,238,700.0 |
Biocide KR-153SL | Nabors | Biocide | Polyethylene Glycol | 25322-68-3 | 50 | 0.0160432 | 7072.39 | |
Other -(non hazardous) | NA | 30 | 0.0096259 | 4243.43 | ||||
2,2-Dibromo-3-nitrilo-propionamide | 10222-01-2 | 20 | 0.00641727 | 2828.95 | ||||
Acid Corrosion Inhibitor, A12 | Nabors | Corrosion Inhibitor | Propargyl Alcohol | 107-19-7 | 30 | 0.000341535 | 150.56 | |
Isopropyl Alcohol | 67-63-0 | 30 | 0.000341535 | 150.56 | ||||
Short Chained glycol ether | 112-34-5 | 30 | 0.000341535 | 150.56 | ||||
Other -(non hazardous) | NA | 3 | 0.00003415 | 15.056 | ||||
Proprietary Component | NA | 7 | 0.00007969 | 35.131 | ||||
Scale Inhibitor, TSC | Nabors | Scale Inhibitor | Other -(non hazardous) | NA | 15 | 0.00153136 | 675.078 | |
Propylene glycol | 57-55-6 | 40 | 0.00408363 | 1800.21 | ||||
Anionic copolymer | NA | 15 | 0.00153136 | 675.078 | ||||
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15 | 0.00153136 | 675.078 | ||||
Friction Reducer, WFR-3B | Nabors | Friction Reducer | Other -(non hazardous) | NA | 15 | 0.0092579 | 4081.21 | |
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.00308597 | 1360.4 | ||||
Ethoxylated Alcohol Blend | NA | 15 | 0.0092579 | 4081.21 | ||||
Hydrotreated light distillates (10-30%) | 64742-47-8 | 50 | 0.0308597 | 13604 | ||||
Propylene glycol | 57-55-6 | 15 | 0.0092579 | 4081.21 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.354 | 38,508,700.0 | |
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 92.5 | 0.607956 | 268008 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0492937 | 21730.4 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 211,591.00 | 123 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 379,359.39 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 284,993.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 209,894.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 161,236.00 | 346 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 152,749.97 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 138,778.11 | 320 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 1,185.07 Tons | LANDFILL | 100955 |
2012 | XTO ENERGY INC | Drill Cuttings | 101.07 Tons | LANDFILL | 301626 |
2013 | XTO ENERGY INC | Produced Fluid | 160.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 490.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 103.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 313.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 4,023.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 5,469.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 628.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 307.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | XTO ENERGY INC | Produced Fluid | 123.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 123.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 7,007.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 1,476.41 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 1,135.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 655.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2015 | XTO ENERGY INC | Produced Fluid | 1,679.31 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 1,981.73 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 933.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 224.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Produced Fluid | 443.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 224.74 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 670.70 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 988.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil | 0.32 Tons | LANDFILL | 100955 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.32 Tons | LANDFILL | 100955 |
2017 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 528.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 118.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 252.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XTO ENERGY INC | Produced Fluid | 223.78 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 114.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 584.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 209.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 5.73 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2014-04 |
2019 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 148.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2019 | XTO ENERGY INC | Produced Fluid | 461.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 203.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2044091 | Primary Facility | 2012-01-26 | Routine/Complete Inspection | No Violations Noted | |
2068002 | Primary Facility | 2012-04-10 | Routine/Complete Inspection | No Violations Noted | |
2071572 | Primary Facility | 2012-05-29 | Drilling/Alteration | No Violations Noted | |
2092563 | Primary Facility | 2012-07-05 | Routine/Complete Inspection | No Violations Noted | |
2098643 | Primary Facility | 2012-08-07 | Routine/Complete Inspection | No Violations Noted | |
2106258 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | |
2115291 | Primary Facility | 2012-11-07 | Routine/Complete Inspection | No Violations Noted | |
2160208 | Primary Facility | 2013-04-22 | Follow-up Inspection | No Violations Noted | |
2160336 | Primary Facility | 2013-04-04 | Routine/Complete Inspection | No Violations Noted | |
2168372 | Primary Facility | 2013-05-09 | Routine/Complete Inspection | No Violations Noted | |
2169205 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | |
2169673 | Primary Facility | 2013-05-23 | Routine/Complete Inspection | No Violations Noted | |
2175923 | Primary Facility | 2013-06-17 | Routine/Complete Inspection | No Violations Noted | |
2184079 | Primary Facility | 2013-07-16 | Routine/Complete Inspection | No Violations Noted | |
2196101 | Primary Facility | 2013-08-14 | Routine/Complete Inspection | No Violations Noted | |
2202384 | Primary Facility | 2013-09-03 | Routine/Complete Inspection | No Violations Noted | |
2250633 | Primary Facility | 2014-03-05 | Routine/Complete Inspection | No Violations Noted | |
2344067 | Primary Facility | 2015-02-10 | Routine/Complete Inspection | No Violations Noted | |
2422237 | Primary Facility | 2015-10-15 | Routine/Complete Inspection | Violation(s) Noted | |
2514333 | Primary Facility | 2016-08-23 | Site Restoration | No Violations Noted | |
2556718 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconventional well in production. No violations noted at time of inspection. |
2721068 | Primary Facility | 2018-04-20 | Routine/Complete Inspection | No Violations Noted | The weather is 45 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy INC., PA Tract Unit E Pad, 3H well on April 20, 2018. There are 6 wells on this pad.
Well # 3H is active and producing. Annular vents surface by intermediate (13-3/8¿ x 9-5/8") and intermediate by production (9-5/8¿ x 5-1/2¿) are open and vented. 100% LEL and 15% combustible gas was detected at the 13-3/8¿ x 9-5/8" annulus. Production xmas tree top (tubing) pressure reading is 120 PSI, casing pressure is 187 PSI. No violations are noted at time of inspection. 0% combustible gas was detected in the area immediately surrounding the well. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2829659 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract 1H Pad E. Monthly tank maintenance log was available for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 line heaters with water separators and 6 steel vertical production fluids tanks onsite. Both line heaters and production fluid tanks were stationed in secondary containment. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2422237 | 738476 | 10/15/2015 | 2015-10-15 | 78.86 - CASING AND CEMENTING - DEFECTIVE CASING OR CEMENTING - Operator failed to report defect in a well that has defective, insufficient or improperly cemented casing to the Department within 24 hours of discovery. Operator failed to correct defec | Environmental Health & Safety | Gas Discovered on 9 5/8 annulus vent. 100% methane. |
For data sources see[8]