X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-035-21271

Well Details

Well ID: 37-035-21271
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Chapman Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148997
Farm/Lease Name: PA TRACT E 4H
License Status:
Spud Date: 2012-03-09
Permit Date: 2011-11-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.409639
Longitude: -77.621028

For data sources see[1][2][3]

Well History

Date Event
2011-11-14 New Permit Application
2011-12-05 Performed Spud Operation
2012-04-07 Drilling Completion
2012-08-17 DEVIATED
2013-04-12 Perforation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-22 2013-07-03 8,200 5,738,710 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (7.5%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 7.5 0.04856 26286.8
Other - (non-hazardous) NA 92.5 0.598907 324203
Friction Reducer, WFR-3B Nabors Friction Reducer Other -(non hazardous) NA 15 0.00982524 5318.65
Ethoxylated Alcohol Blend NA 15 0.00982524 5318.65
Hydrotreated light distillates (10-30%) 64742-47-8 50 0.0327508 17728.8
Propylene glycol 57-55-6 15 0.00982524 5318.65
Ethoxylated oleylamine 26635-93-8 5 0.00327508 1772.88
Sand (Proppant) Nabors Proppant Silica Substrate NA 100 10.7736 5,832,000.0
Biocide KR-153SL Nabors Biocide Polyethylene Glycol 25322-68-3 50 0.0165913 8981.31
2,2-Dibromo-3-nitrilo-propionamide 10222-01-2 20 0.00663653 3592.52
Other -(non hazardous) NA 30 0.0099548 5388.78
Scale Inhibitor, TSC Nabors Scale Inhibitor 2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt 93858-78-7 15 0.00155348 840.937
Other -(non hazardous) NA 15 0.00155348 840.937
Propylene glycol 57-55-6 40 0.00414261 2242.5
Anionic copolymer NA 15 0.00155348 840.937
Acid Corrosion Inhibitor, A12 Nabors Corrosion Inhibitor Proprietary Component NA 7 0.00007851 42.497
Propargyl Alcohol 107-19-7 30 0.000336451 182.13
Other -(non hazardous) NA 3 0.00003365 18.213
Short Chained glycol ether 112-34-5 30 0.000336451 182.13
Isopropyl Alcohol 67-63-0 30 0.000336451 182.13
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.4673 47,889,600.0
Clay Treat, LT Nabors Clay Treatment Other -(non hazardous) NA 100 0.00153881 832.998

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 291,368.00 153 0.00 0 0.00 0
2014 XTO ENERGY INC 432,451.96 364 0.00 0 0.00 0
2015 XTO ENERGY INC 330,736.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 238,946.00 366 0.00 0 0.00 0
2017 XTO ENERGY INC 205,603.00 347 0.00 0 0.00 0
2018 XTO ENERGY INC 183,469.69 363 0.00 0 0.00 0
2019 XTO ENERGY INC 137,149.29 311 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Drill Cuttings 1,478.82 Tons LANDFILL 100955
2013 XTO ENERGY INC Produced Fluid 481.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2013 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 108.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 XTO ENERGY INC Produced Fluid 5,861.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 XTO ENERGY INC Fracing Fluid Waste 1,534.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 XTO ENERGY INC Fracing Fluid Waste 8,215.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 XTO ENERGY INC Produced Fluid 1,156.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 XTO ENERGY INC Produced Fluid 86.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 339.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2014 XTO ENERGY INC Produced Fluid 7,797.27 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 XTO ENERGY INC Produced Fluid 2,049.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 XTO ENERGY INC Produced Fluid 122.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014 XTO ENERGY INC Produced Fluid 1,422.42 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 810.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 13.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 2,928.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 222.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015 XTO ENERGY INC Produced Fluid 2,968.93 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 1,233.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 545.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 XTO ENERGY INC Produced Fluid 113.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2016 XTO ENERGY INC Produced Fluid 665.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 309.36 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 XTO ENERGY INC Produced Fluid 990.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 115.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 1,269.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 XTO ENERGY INC Soil Contaminated by Oil 0.32 Tons LANDFILL 100955
2017 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 0.32 Tons LANDFILL 100955
2017 XTO ENERGY INC Produced Fluid 109.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 1,028.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 XTO ENERGY INC Produced Fluid 240.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 XTO ENERGY INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 542.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 323.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 XTO ENERGY INC Produced Fluid 803.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 XTO ENERGY INC Produced Fluid 553.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 XTO ENERGY INC Produced Fluid 123.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 XTO ENERGY INC Produced Fluid 487.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 227.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 253.50 Bbl INJECTION DISPOSAL WELL 34-133-20114
2019 XTO ENERGY INC Waste Water Treatment Sludge 5.73 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2014-04
2019 XTO ENERGY INC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 107.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 293.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2044093 Primary Facility 2012-01-26 Routine/Complete Inspection No Violations Noted
2068005 Primary Facility 2012-04-10 Routine/Complete Inspection No Violations Noted
2071571 Primary Facility 2012-05-29 Drilling/Alteration No Violations Noted
2092566 Primary Facility 2012-07-05 Routine/Complete Inspection No Violations Noted
2098650 Primary Facility 2012-08-07 Routine/Complete Inspection No Violations Noted
2106260 Primary Facility 2012-09-25 Routine/Complete Inspection No Violations Noted
2115297 Primary Facility 2012-11-07 Routine/Complete Inspection No Violations Noted
2160210 Primary Facility 2013-04-22 Follow-up Inspection No Violations Noted
2160337 Primary Facility 2013-04-04 Routine/Complete Inspection No Violations Noted
2168378 Primary Facility 2013-05-09 Routine/Complete Inspection No Violations Noted
2169212 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted
2169674 Primary Facility 2013-05-23 Routine/Complete Inspection No Violations Noted
2175924 Primary Facility 2013-06-17 Routine/Complete Inspection No Violations Noted
2184082 Primary Facility 2013-07-16 Routine/Complete Inspection No Violations Noted
2196103 Primary Facility 2013-08-14 Routine/Complete Inspection No Violations Noted
2202389 Primary Facility 2013-09-03 Routine/Complete Inspection No Violations Noted
2250636 Primary Facility 2014-03-05 Routine/Complete Inspection No Violations Noted
2344064 Primary Facility 2015-02-10 Routine/Complete Inspection No Violations Noted
2422240 Primary Facility 2015-10-15 Routine/Complete Inspection Violation(s) Noted
2514334 Primary Facility 2016-08-23 Site Restoration No Violations Noted
2556706 Primary Facility 2017-01-23 Routine/Complete Inspection No Violations Noted Routine inspection of unconventional well in production. No violations noted at time of inspection.
2721060 Primary Facility 2018-04-20 Routine/Complete Inspection No Violations Noted The weather is 45 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy INC., PA Tract Unit E Pad, 4H well on April 20, 2018. There are 6 wells on this pad.

Well # 4H is active and producing. Annular vents surface by intermediate (13-3/8¿ x 9-5/8") and intermediate by production (9-5/8¿ x 5-1/2¿) are open and vented. 100% LEL and 25% combustible gas was detected at the 13-3/8¿ x 9-5/8" annulus. Production xmas tree top (tubing) pressure reading is 225 PSI, casing pressure is 273 PSI. No violations are noted at time of inspection. 0% combustible gas was detected in the area immediately surrounding the well. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2829666 Primary Facility 2019-01-17 Routine/Complete Inspection No Violations Noted On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract 1H Pad E. Monthly tank maintenance log was available for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.

There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 line heaters with water separators and 6 steel vertical production fluids tanks onsite. Both line heaters and production fluid tanks were stationed in secondary containment.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2422240 738477 10/15/2015 2015-10-15 78.86 - CASING AND CEMENTING - DEFECTIVE CASING OR CEMENTING - Operator failed to report defect in a well that has defective, insufficient or improperly cemented casing to the Department within 24 hours of discovery. Operator failed to correct defec Environmental Health & Safety Gas discovered on 9 5/8 annulus vent. 100% Methane

For data sources see[8]

References