37-035-21272

Well Details

Well ID: 37-035-21272
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Chapman Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148997
Farm/Lease Name: PA TRACT E 5H
License Status:
Spud Date: 2011-12-08
Permit Date: 2011-11-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.409617
Longitude: -77.621008

For data sources see[1][2][3]

Well History

Date Event
2011-11-14 New Permit Application
2011-12-08 Performed Spud Operation
2012-03-09 Drilling Completion
2013-04-11 Perforation
2014-01-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-31 2013-07-03 8,200 3,403,510 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clay Treat, LT Nabors Clay Treatment Other -(non hazardous) NA 100 0.0197325 6392.35
Acid Corrosion Inhibitor, A12 Nabors Corrosion Inhibitor Propargyl Alcohol 107-19-7 30 0.000502246 162.702
Proprietary Component NA 7 0.000117191 37.964
Other -(non hazardous) NA 3 0.00005022 16.27
Isopropyl Alcohol 67-63-0 30 0.000502246 162.702
Short Chained glycol ether 112-34-5 30 0.000502246 162.702
Water XTO Carrier/Base Fluid Water 7732-18-5 100 87.675 28,402,300.0
Hydrochloric Acid (7.5%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0724891 23482.8
Other - (non-hazardous) NA 92.5 0.894032 289622
Sand (Proppant) Nabors Proppant Silica Substrate NA 100 11.2354 3,639,700.0
Scale Inhibitor, TSC Nabors Scale Inhibitor Other -(non hazardous) NA 15 0.00155394 503.399
Propylene glycol 57-55-6 40 0.00414384 1342.4
Anionic copolymer NA 15 0.00155394 503.399
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt 93858-78-7 15 0.00155394 503.399
Friction Reducer, WFR-3B Nabors Friction Reducer Propylene glycol 57-55-6 15 0.00868957 2814.99
Ethoxylated oleylamine 26635-93-8 5 0.00289652 938.328
Hydrotreated light distillates (10-30%) 64742-47-8 50 0.0289652 9383.28
Other -(non hazardous) NA 15 0.00868957 2814.99
Ethoxylated Alcohol Blend NA 15 0.00868957 2814.99
Biocide KR-153SL Nabors Biocide 2,2-Dibromo-3-nitrilo-propionamide 10222-01-2 20 0.00667832 2163.44
Other -(non hazardous) NA 30 0.0100175 3245.16
Polyethylene Glycol 25322-68-3 50 0.0166958 5408.6

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 154,469.00 123 0.00 0 0.00 0
2014 XTO ENERGY INC 263,578.08 364 0.00 0 0.00 0
2015 XTO ENERGY INC 257,185.00 364 0.00 0 0.00 0
2016 XTO ENERGY INC 185,174.00 366 0.00 0 0.00 0
2017 XTO ENERGY INC 108,209.00 286 0.00 0 0.00 0
2018 XTO ENERGY INC 130,036.74 363 0.00 0 0.00 0
2019 XTO ENERGY INC 7,834.66 49 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Drill Cuttings 1,205.06 Tons LANDFILL 100955
2013 XTO ENERGY INC Produced Fluid 148.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2013 XTO ENERGY INC Produced Fluid 82.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Fracing Fluid Waste 223.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2013 XTO ENERGY INC Fracing Fluid Waste 324.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2013 XTO ENERGY INC Produced Fluid 2,305.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 XTO ENERGY INC Fracing Fluid Waste 4,116.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 XTO ENERGY INC Fracing Fluid Waste 1,080.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 XTO ENERGY INC Fracing Fluid Waste 101.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 XTO ENERGY INC Produced Fluid 794.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 XTO ENERGY INC Produced Fluid 209.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2014 XTO ENERGY INC Produced Fluid 5,023.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 XTO ENERGY INC Produced Fluid 1,007.56 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 XTO ENERGY INC Produced Fluid 830.34 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 679.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 1,691.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 1,553.27 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 905.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 108.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 XTO ENERGY INC Produced Fluid 106.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2016 XTO ENERGY INC Produced Fluid 531.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 101.14 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 XTO ENERGY INC Produced Fluid 662.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 742.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 XTO ENERGY INC Soil Contaminated by Oil 0.32 Tons LANDFILL 100955
2017 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 0.32 Tons LANDFILL 100955
2017 XTO ENERGY INC Produced Fluid 650.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 XTO ENERGY INC Produced Fluid 119.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 XTO ENERGY INC Produced Fluid 108.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 329.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 XTO ENERGY INC Produced Fluid 668.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 XTO ENERGY INC Produced Fluid 222.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 XTO ENERGY INC Produced Fluid 107.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 25.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 22.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2019 XTO ENERGY INC Waste Water Treatment Sludge 5.73 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2014-04
2019 XTO ENERGY INC Produced Fluid 140.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-133-24096

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2044094 Primary Facility 2012-01-26 Routine/Complete Inspection No Violations Noted
2068006 Primary Facility 2012-04-10 Routine/Complete Inspection No Violations Noted
2071570 Primary Facility 2012-05-29 Drilling/Alteration No Violations Noted
2092569 Primary Facility 2012-07-05 Routine/Complete Inspection No Violations Noted
2098653 Primary Facility 2012-08-07 Routine/Complete Inspection No Violations Noted
2106262 Primary Facility 2012-09-25 Routine/Complete Inspection No Violations Noted
2115299 Primary Facility 2012-11-07 Routine/Complete Inspection No Violations Noted
2160212 Primary Facility 2013-04-22 Follow-up Inspection No Violations Noted
2160339 Primary Facility 2013-04-04 Routine/Complete Inspection No Violations Noted
2168383 Primary Facility 2013-05-09 Routine/Complete Inspection No Violations Noted
2169214 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted
2169675 Primary Facility 2013-05-23 Routine/Complete Inspection No Violations Noted
2175926 Primary Facility 2013-06-17 Routine/Complete Inspection No Violations Noted
2184088 Primary Facility 2013-07-16 Routine/Complete Inspection No Violations Noted
2196104 Primary Facility 2013-08-14 Routine/Complete Inspection No Violations Noted
2202391 Primary Facility 2013-09-03 Routine/Complete Inspection No Violations Noted
2250638 Primary Facility 2014-03-05 Routine/Complete Inspection No Violations Noted
2344066 Primary Facility 2015-02-10 Routine/Complete Inspection No Violations Noted
2422251 Primary Facility 2015-10-15 Routine/Complete Inspection Violation(s) Noted
2514335 Primary Facility 2016-08-23 Site Restoration No Violations Noted
2556711 Primary Facility 2017-01-23 Routine/Complete Inspection No Violations Noted Routine inspection of unconventional well in production. No violations noted at time of inspection.
2721064 Primary Facility 2018-04-20 Routine/Complete Inspection No Violations Noted The weather is 45 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy INC., PA Tract Unit E Pad, 5H well on April 20, 2018. There are 6 wells on this pad.

Well # 5H is active and producing. Annular vents surface by intermediate (13-3/8¿ x 9-5/8") and intermediate by production (9-5/8¿ x 5-1/2¿) are open and vented. 100% LEL and 6% combustible gas was detected at the 13-3/8¿ x 9-5/8" annulus. Production xmas tree top (tubing) pressure reading is 121 PSI, casing pressure is 189 PSI. No violations are noted at time of inspection. 0% combustible gas was detected in the area immediately surrounding the well. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2829671 Primary Facility 2019-01-17 Routine/Complete Inspection No Violations Noted On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract 1H Pad E. Monthly tank maintenance log was available for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.

There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 line heaters with water separators and 6 steel vertical production fluids tanks onsite. Both line heaters and production fluid tanks were stationed in secondary containment.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2422251 738482 10/15/2015 2015-10-15 78.86 - CASING AND CEMENTING - DEFECTIVE CASING OR CEMENTING - Operator failed to report defect in a well that has defective, insufficient or improperly cemented casing to the Department within 24 hours of discovery. Operator failed to correct defec Environmental Health & Safety Gas Discovered on 9 5/8 annulus vent. 100% methane.