If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21272 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.409617,"lon":-77.621008,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148997 | |
Farm/Lease Name: PA TRACT E 5H | |
License Status: | |
Spud Date: 2011-12-08 | |
Permit Date: 2011-11-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.409617 | |
Longitude: -77.621008 |
Date | Event |
---|---|
2011-11-14 | New Permit Application |
2011-12-08 | Performed Spud Operation |
2012-03-09 | Drilling Completion |
2013-04-11 | Perforation |
2014-01-29 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-05-31 | 2013-07-03 | 8,200 | 3,403,510 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Clay Treat, LT | Nabors | Clay Treatment | Other -(non hazardous) | NA | 100 | 0.0197325 | 6392.35 |
Acid Corrosion Inhibitor, A12 | Nabors | Corrosion Inhibitor | Propargyl Alcohol | 107-19-7 | 30 | 0.000502246 | 162.702 | |
Proprietary Component | NA | 7 | 0.000117191 | 37.964 | ||||
Other -(non hazardous) | NA | 3 | 0.00005022 | 16.27 | ||||
Isopropyl Alcohol | 67-63-0 | 30 | 0.000502246 | 162.702 | ||||
Short Chained glycol ether | 112-34-5 | 30 | 0.000502246 | 162.702 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.675 | 28,402,300.0 | |
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0724891 | 23482.8 | |
Other - (non-hazardous) | NA | 92.5 | 0.894032 | 289622 | ||||
Sand (Proppant) | Nabors | Proppant | Silica Substrate | NA | 100 | 11.2354 | 3,639,700.0 | |
Scale Inhibitor, TSC | Nabors | Scale Inhibitor | Other -(non hazardous) | NA | 15 | 0.00155394 | 503.399 | |
Propylene glycol | 57-55-6 | 40 | 0.00414384 | 1342.4 | ||||
Anionic copolymer | NA | 15 | 0.00155394 | 503.399 | ||||
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15 | 0.00155394 | 503.399 | ||||
Friction Reducer, WFR-3B | Nabors | Friction Reducer | Propylene glycol | 57-55-6 | 15 | 0.00868957 | 2814.99 | |
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.00289652 | 938.328 | ||||
Hydrotreated light distillates (10-30%) | 64742-47-8 | 50 | 0.0289652 | 9383.28 | ||||
Other -(non hazardous) | NA | 15 | 0.00868957 | 2814.99 | ||||
Ethoxylated Alcohol Blend | NA | 15 | 0.00868957 | 2814.99 | ||||
Biocide KR-153SL | Nabors | Biocide | 2,2-Dibromo-3-nitrilo-propionamide | 10222-01-2 | 20 | 0.00667832 | 2163.44 | |
Other -(non hazardous) | NA | 30 | 0.0100175 | 3245.16 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.0166958 | 5408.6 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 154,469.00 | 123 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 263,578.08 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 257,185.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 185,174.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 108,209.00 | 286 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 130,036.74 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 7,834.66 | 49 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 1,205.06 Tons | LANDFILL | 100955 |
2013 | XTO ENERGY INC | Produced Fluid | 148.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 82.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 223.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 324.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 2,305.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 4,116.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 1,080.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 101.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 794.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 209.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 5,023.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 1,007.56 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 830.34 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 679.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 1,691.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 1,553.27 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 905.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 108.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 106.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | XTO ENERGY INC | Produced Fluid | 531.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 101.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 662.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 742.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil | 0.32 Tons | LANDFILL | 100955 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.32 Tons | LANDFILL | 100955 |
2017 | XTO ENERGY INC | Produced Fluid | 650.82 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 119.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 329.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XTO ENERGY INC | Produced Fluid | 668.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 222.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 107.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 25.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 22.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 5.73 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2014-04 |
2019 | XTO ENERGY INC | Produced Fluid | 140.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2044094 | Primary Facility | 2012-01-26 | Routine/Complete Inspection | No Violations Noted | |
2068006 | Primary Facility | 2012-04-10 | Routine/Complete Inspection | No Violations Noted | |
2071570 | Primary Facility | 2012-05-29 | Drilling/Alteration | No Violations Noted | |
2092569 | Primary Facility | 2012-07-05 | Routine/Complete Inspection | No Violations Noted | |
2098653 | Primary Facility | 2012-08-07 | Routine/Complete Inspection | No Violations Noted | |
2106262 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | |
2115299 | Primary Facility | 2012-11-07 | Routine/Complete Inspection | No Violations Noted | |
2160212 | Primary Facility | 2013-04-22 | Follow-up Inspection | No Violations Noted | |
2160339 | Primary Facility | 2013-04-04 | Routine/Complete Inspection | No Violations Noted | |
2168383 | Primary Facility | 2013-05-09 | Routine/Complete Inspection | No Violations Noted | |
2169214 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | |
2169675 | Primary Facility | 2013-05-23 | Routine/Complete Inspection | No Violations Noted | |
2175926 | Primary Facility | 2013-06-17 | Routine/Complete Inspection | No Violations Noted | |
2184088 | Primary Facility | 2013-07-16 | Routine/Complete Inspection | No Violations Noted | |
2196104 | Primary Facility | 2013-08-14 | Routine/Complete Inspection | No Violations Noted | |
2202391 | Primary Facility | 2013-09-03 | Routine/Complete Inspection | No Violations Noted | |
2250638 | Primary Facility | 2014-03-05 | Routine/Complete Inspection | No Violations Noted | |
2344066 | Primary Facility | 2015-02-10 | Routine/Complete Inspection | No Violations Noted | |
2422251 | Primary Facility | 2015-10-15 | Routine/Complete Inspection | Violation(s) Noted | |
2514335 | Primary Facility | 2016-08-23 | Site Restoration | No Violations Noted | |
2556711 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconventional well in production. No violations noted at time of inspection. |
2721064 | Primary Facility | 2018-04-20 | Routine/Complete Inspection | No Violations Noted | The weather is 45 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy INC., PA Tract Unit E Pad, 5H well on April 20, 2018. There are 6 wells on this pad.
Well # 5H is active and producing. Annular vents surface by intermediate (13-3/8¿ x 9-5/8") and intermediate by production (9-5/8¿ x 5-1/2¿) are open and vented. 100% LEL and 6% combustible gas was detected at the 13-3/8¿ x 9-5/8" annulus. Production xmas tree top (tubing) pressure reading is 121 PSI, casing pressure is 189 PSI. No violations are noted at time of inspection. 0% combustible gas was detected in the area immediately surrounding the well. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2829671 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract 1H Pad E. Monthly tank maintenance log was available for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 line heaters with water separators and 6 steel vertical production fluids tanks onsite. Both line heaters and production fluid tanks were stationed in secondary containment. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2422251 | 738482 | 10/15/2015 | 2015-10-15 | 78.86 - CASING AND CEMENTING - DEFECTIVE CASING OR CEMENTING - Operator failed to report defect in a well that has defective, insufficient or improperly cemented casing to the Department within 24 hours of discovery. Operator failed to correct defec | Environmental Health & Safety | Gas Discovered on 9 5/8 annulus vent. 100% methane. |
For data sources see[8]