X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-20121

Well Details

Well ID: 37-051-20121
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Stewart Township
Operator Name: XTO ENERGY INC
Well Pad ID:
Farm/Lease Name: EVELYN M ABBEY 1
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date: 1971-08-23
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 39.864469
Longitude: -79.567456

For data sources see[1][2][3]

Well History

Date Event
1971-08-23 New Permit Application
1971-10-05 Performed Spud Operation
1971-12-09 Perforation
1971-12-09 Performed Stimulation
1971-12-10 Drilling Completion
1972-01-01 NEWLY DRILLED
2016-03-17 Drilling Completion
2016-06-07 FULLY PLUGGED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
1971-12-09 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1980 75,900.00 0 0.00 0 0.00 0
1981 68,748.00 0 0.00 0 0.00 0
1982 66,904.00 0 0.00 0 0.00 0
1983 29,316.00 0 0.00 0 0.00 0
1984 51,846.00 0 0.00 0 0.00 0
1985 26,018.00 0 0.00 0 0.00 0
1986 3,214.00 0 0.00 0 0.00 0
1991 8882.00 222 0.00 0 0.00 0
1992 8486.00 165 0.00 0 0.00 0
1993 4378.00 109 0.00 0 0.00 0
1994 4408.00 142 0.00 0 0.00 0
1995 10164.00 291 0.00 0 0.00 0
1996 10164 365 0.00 0 0.00 0
1998 CABOT OIL & GAS CORP 1299 92 0.00 0 0.00 0
1999 CABOT OIL & GAS CORP 6655 365 0.00 0 0.00 0
2000 CABOT OIL & GAS CORP 3078 365 0.00 0 0.00 0
2001 CABOT OIL & GAS CORP 457 365 0.00 0 0.00 0
2002 CABOT OIL & GAS CORP 1199 151 0.00 0 0.00 0
2003 LINN OPR LLC 2123 30 0.00 0 0.00 0
2004 LINN OPR LLC 15289 365 0.00 0 0.00 0
2006 LINN OPR INC 0.00 0 0.00 0 0.00 0
2007 LINN OPR INC 0.00 0 0.00 0 0.00 0
2008 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2009 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2010 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1999 CABOT OIL & GAS CORP Brine 615.00 Bbl Brine or Industrial Waste Treatment Plt PA0026034
2001 CABOT OIL & GAS CORP Brine 1,190.00 Bbl Municipal Sewage Treatment Plant PA0026034
2012 XTO ENERGY INC Produced Fluid 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2016 XTO ENERGY INC Servicing Fluid 3.01 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Servicing Fluid 1,702.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1813881 Primary Facility 2009-07-15 Compliance Evaluation No Violations Noted Site ID sign has been fixed to read the correct API# Drum of intercool on site is up on a rack, but will be removed during inactive status. No fluid in tanks, however dike drain is open, and has no valve. Cellar drain in good working order, everything else looks OK
2452021 Primary Facility 2016-02-18 Routine/Complete Inspection No Violations Noted Routine Inspection, Operator in process flaring well down prior to plugging.
2469453 Primary Facility 2016-03-07 Plugging(Includes Plugged/Mined Through) No Violations Noted Follow - Up Inspection, Operator in process moving equipment on location.
2469461 Primary Facility 2016-03-09 Plugging(Includes Plugged/Mined Through) No Violations Noted Follow-Up Inspection, During Plugging the Abbey # 1 well Hydrogen Sulfide and Carbon-Dioxide.
2469534 Primary Facility 2016-03-11 Plugging(Includes Plugged/Mined Through) No Violations Noted Final Inspection ,well is plugged to surface and steel plate welded on casing. ID welded on plate.

For data sources see[8]

References