If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-20948 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.735971,"lon":-79.545973,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Wharton Township | |
Operator Name: PETRO DEV CORP | |
Well Pad ID: | |
Farm/Lease Name: A HERMAN 1 | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 1997-11-06 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 39.735971 | |
Longitude: -79.545973 |
Date | Event |
---|---|
1997-11-06 | New Permit Application |
1997-11-20 | Performed Spud Operation |
1997-11-26 | Drilling Completion |
1997-12-03 | Drilling Completion |
1998-03-11 | FULLY PLUGGED |
1998-03-11 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1997 | PETRO DEV CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1998 | PETRO DEV CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1999 | PETRO DEV CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | PETRO DEV CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
384316 | Primary Facility | 1998-02-18 | Bond Release | No Violations Noted | NOT YET RECLAIMED |
384349 | Primary Facility | 1998-02-05 | Plugging(Includes Plugged/Mined Through) | Violation(s) Noted | FAILURE TO NOTIFY |
385295 | Primary Facility | 1998-06-25 | Bond Release | No Violations Noted | BOND RELEASE RECOMMENDED |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
384349 | 111074 | 02/05/1998 | 1998-02-05 | 210BCD - Failure to provide 3 working days notice prior to plugging a coal area well or 24 hrs for dry holes | Administrative | FAILURE TO NOTIFY |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
111074 | 6683 | NOV - Notice of Violation | Unresolvable | 1998-02-23 |
For data sources see[6]