If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24328 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.010133,"lon":-79.672622,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Dunbar Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148509 | |
Farm/Lease Name: HELEN K BUKOVAC 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.010133 | |
Longitude: -79.672622 |
Date | Event |
---|---|
2010-03-12 | New Permit Application |
2010-05-26 | Performed Spud Operation |
2010-08-29 | Drilling Completion |
2010-10-21 | Perforation |
2010-10-21 | Performed Stimulation |
2011-02-17 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-10-21 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 143,357.00 | 52 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 772,032.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 427,808.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 322,987.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 222,476.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 229,671.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 179,489.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 170,972.82 | 352 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 148,205.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 154,410.00 | 352 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1,815.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 219.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 45.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 3,029.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 810.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 92.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 1,294.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 92.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 294.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 294.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 398.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 663.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 177.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 210.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 663.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 392.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 290.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 248.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 255.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 165.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 140.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 300.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 135.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1889802 | Primary Facility | 2010-06-03 | Drilling/Alteration | No Violations Noted | |
1893303 | Primary Facility | 2010-06-16 | Routine/Complete Inspection | No Violations Noted | |
1910105 | Primary Facility | 2010-08-20 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, SAXON RIG -124 LANDING CURVE, TD ESTIMATED AT 11350', PITS AND E&S ARE GOOD. |
2131364 | Primary Facility | 2013-01-15 | Routine/Complete Inspection | No Violations Noted | Notice of termination inspection. All areas reclaimed and had at least 70% growth. Well labeled, tanks in containment, ID sign up.Site stable. |
2239093 | Primary Facility | 2014-01-13 | Incident- Response to Accident or Event | Violation(s) Noted | On Monday, January 13, 2014, the Department received a report about a spill that had occurred the previous day on XTO’s Helen Bukovac #4H site; I investigated on January 14, 2014. |
2242810 | Primary Facility | 2014-01-23 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On 1/24/2014, the Department conducted a follow -up inspection at the XTO Energy Inc’s Helen Bukovac 4H OG WELL in Dunbar Twp., Fayette County. |
2278343 | Primary Facility | 2014-05-27 | Compliance Evaluation | No Violations Noted | On 5/27/2014, the Department conducted a compliance evaluation inspection at the XTO Energy Inc’s Helen Bukovac 4H OG WELL in Dunbar Twp., Fayette County. |
2684762 | Primary Facility | 2018-01-22 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by security fence. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2239093 | 687336 | 01/13/2014 | 2014-01-13 | 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
687336 | 306821 | NOV - Notice of Violation | Comply/Closed | 2014-06-06 |
For data sources see[8]