X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24331

Well Details

Well ID: 37-051-24331
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Dunbar Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149688
Farm/Lease Name: GEORGE F JOSEPH 11H
License Status:
Spud Date:
Permit Date: 2010-03-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.020536
Longitude: -79.678142

For data sources see[1][2][3]

Well History

Date Event
2010-03-15 New Permit Application
2010-06-20 Performed Spud Operation
2010-09-26 Drilling Completion
2010-11-20 Perforation
2010-11-20 Performed Stimulation
2011-02-17 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-11-20 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 17,878.00 10 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 784,436.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 422,732.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 309,025.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 234,323.00 360 0.00 0 0.00 0
2015 XTO ENERGY INC 200,592.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 124,450.00 347 0.00 0 0.00 0
2017 XTO ENERGY INC 128,812.61 352 0.00 0 0.00 0
2018 XTO ENERGY INC 138,854.00 347 0.00 0 0.00 0
2019 XTO ENERGY INC 125,749.00 354 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 530.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PBR
2011 PHILLIPS EXPLORATION INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 PHILLIPS EXPLORATION INC Produced Fluid 3,996.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 1,322.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 124.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 1,108.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 564.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012 XTO ENERGY INC Produced Fluid 124.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 49.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2013 XTO ENERGY INC Produced Fluid 359.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 511.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 359.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 384.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 99.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 99.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 10.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 368.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 133.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 199.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 213.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 165.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1894507 Primary Facility 2010-06-25 Drilling/Alteration No Violations Noted
1916591 Primary Facility 2010-09-27 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, SITE AND PIT ARE GOOD. PHOENIX RIG #5 SKIDDING 9/28/2010 AFTER CEMENTING 51/2" CASING TONIGHT,
1938184 Primary Facility 2010-09-05 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PHOENIX # 5 COMPLETED @ 10,973. E&S AND PITS ARE IN GOOD CONDITION.

For data sources see[8]

References