X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24336

Well Details

Well ID: 37-051-24336
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Dunbar Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149686
Farm/Lease Name: JAMES G SIMON ETAL 10H
License Status:
Spud Date:
Permit Date: 2010-03-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.002439
Longitude: -79.682294

For data sources see[1][2][3]

Well History

Date Event
2010-03-22 New Permit Application
2010-09-08 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-03-12 2011-03-12 8,425 4,774,008

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Water 7732-18-5 100.00 89.98
ICP-1000 Superior Well Services Iron Control Anionic copolymer 50.00 0.01
1,2-Propylene glycol 57-55-6 50.00 0.01
AI-2 Superior Well Services Acid Corrosion Inhibitor 2-Butoxyethanol 111-76-2 30.00 0.00012000
Isopropanol 67-63-0 30.00 0.00012000
Propargyl alcohol 107-19-7 30.00 0.00012000
Other - unspecified 10.00 0.00004000
7.5 HCl Acid Superior Well Services Cleaning Water 7732-18-5 92.50 0.89
Hydrochloric acid 7647-01-0 7.50 0.07
KR-153SL Superior Well Services Biocide Ethylene glycol 107-21-1 1.00 0.00012000
Other - Unspecified 25.50 0.00315000
Diethylene glycol 111-46-6 3.50 0.00043000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00247000
Polyethylene glycol 25322-68-3 50.00 0.00618000
Super MAX Superior Well Services Surfactant Other Unspecified 23.00 0.02
2-Ethylhexanol 104-76-7 40.00 0.04
Isopropanol 67-63-0 30.00 0.03
2-Butoxyethanol 111-76-2 7.00 0.00726000
Super TSC Superior Well Services Scale Inhibitor
Anionic copolymer 10.00 0.00087000
1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1 10.00 0.00087000
Other Unspecified 20.00 0.00174000
Anionic polymer 10.00 0.00087000
1,2-Propylene glycol 57-55-6 50.00 0.00435000
Sand Proppant Quartz 14808-60-7 100.00 8.78
WFR-3B Superior Well Services Friction Reducer Ethoxylated C12-16 alcohols 68551-12-2 4.00 0.00437000
Stoddard solvent 8052-41-3 10.00 0.01
1,2-Propylene glycol 57-55-6 25.00 0.02
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
Other - Not Specified 31.00 0.03

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 0.00 0 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 540,229.00 282 0.00 0 0.00 0
2012 XTO ENERGY INC 404,891.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 280,977.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 185,953.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 168,350.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 143,697.00 351 0.00 0 0.00 0
2017 XTO ENERGY INC 129,533.85 351 0.00 0 0.00 0
2018 XTO ENERGY INC 115,889.00 347 0.00 0 0.00 0
2019 XTO ENERGY INC 137,167.00 354 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PHILLIPS EXPLORATION INC Produced Fluid 1,169.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PBR
2011 PHILLIPS EXPLORATION INC Produced Fluid 778.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 PHILLIPS EXPLORATION INC Produced Fluid 120.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 PHILLIPS EXPLORATION INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-133-20114
2011 PHILLIPS EXPLORATION INC Produced Fluid 5,044.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 2,977.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 308.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 92.00 Bbl INJECTION DISPOSAL WELL 0114
2012 XTO ENERGY INC Produced Fluid 92.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 XTO ENERGY INC Produced Fluid 1,253.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 68.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 XTO ENERGY INC Produced Fluid 965.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012 XTO ENERGY INC Produced Fluid 92.00 Bbl INJECTION DISPOSAL WELL 114
2012 XTO ENERGY INC Produced Fluid 70.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 418.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 542.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 418.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 46.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 XTO ENERGY INC Produced Fluid 306.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 136.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 136.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 368.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 133.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 465.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 171.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 49.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 170.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 312.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 231.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 132.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 170.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1916559 Primary Facility 2010-09-29 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, SITE AND PIT ARE GOOD..PHILLIPS RIG # 1 HAS RETURN TO SAME HOLE TO DRILL DEEPER TO DEPTH OF 6150'.
1916584 Primary Facility 2010-09-14 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,SPUDDING RIG RD --20, FINISH AT 4000' MOVED OFF LOCATION COMPLETELY. ONLY ONE RIG ON SITE NOW. SITE AND PITS LOOK GOOD.
1939677 Primary Facility 2010-12-20 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS PHOENIX # 5 FINISH DRILLING SHORTER THAN PLANNED (UNEXSPECTED FORMATION PROBLEMS) . E&S AND PITS ARE IN GOOD CONDITION.
1961014 Primary Facility 2011-03-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK GOOD. DRILLING OUT PLUGS AND FLARING.
1962256 Primary Facility 2011-03-31 Routine/Complete Inspection No Violations Noted
2100123 Primary Facility 2012-09-12 Routine/Complete Inspection No Violations Noted Site Id sign at entrance had incorrect company name, wells labeled correctly, 6 tanks on site in containment, E&S ok, sed trap 2 still in place.
2110983 Primary Facility 2012-10-24 Site Restoration No Violations Noted Restoration extension request by operator, site stable, pits removed, vegetative growth good, two of three sed ponds removed, last one being worked on today. Restoration extension approved to 7/30/13.
2558341 Primary Facility 2017-01-05 Routine/Complete Inspection No Violations Noted

On 01/05/17 at approximately 1400 hours I conducted a site restoration inspection in response to an NOT submittal by XTO Energy Inc. The Act 9 sign was in place, but had been vandalized with spray paint. It appeared that XTO had attempted to remove the spray paint and the sign was legible. All required documents were present at the site. The site was well vegetated and there were no signs of erosion. The site meets the requirements for permit termination. The NOT is approved.

2684640 Primary Facility 2018-01-22 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well head surrounded by security fence. One brine tank on site.

For data sources see[8]

References