X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24391

Well Details

Well ID: 37-051-24391
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: German Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148144
Farm/Lease Name: CROUSHORE 11H
License Status:
Spud Date:
Permit Date: 2010-09-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.902842
Longitude: -79.908736

For data sources see[1][2][3]

Well History

Date Event
2010-09-27 New Permit Application
2010-11-05 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-06-22 2011-06-22 8,173 2,775,887

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unislik ST 50 CESI Chemical Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Clean Volume (gals) Carrier/Base Fluid 100.00 91.31
CMHPG Ashland Water Viscosifier Carboxymethylhydroxyporoyl guar blend 100.00 0.00158000
GBL Clearwater International Gel Breaker Ethylene glycol 107-21-1 60.00 0.00002000
Proppant (lbs) Proppant 100.00 8.69
Scale Inhibitor A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00677000
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.28
Iron Control A Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00680000
Biocide EC 6116A Nalco Biocide Polyethylene glycol 25322-68-3 60.00 0.01
Dibromoacetonitrile 3252-43-5 5.00 0.00114000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00685000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 189,860.00 75 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 427,790.00 366 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 271,680.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 206,041.00 334 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 156,322.00 319 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 138,766.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 131,117.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 107,074.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 96,585.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 3,945.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 8,820.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 875.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 5,216.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Produced Fluid 1,547.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 385.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 2,550.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 350.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 65.00 Bbl LANDFILL SWF 1032-WV0109
2011 CHEVRON APPALACHIA LLC Produced Fluid 235.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHEVRON APPALACHIA LLC Produced Fluid 315.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 25,629.90 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid 1,577.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid 415.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013 CHEVRON APPALACHIA LLC Produced Fluid 845.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 20.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 1,430.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,054.33 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 530.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 513.34 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 3,416.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 279.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 138.33 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 294.67 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 60.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 493.34 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 23.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 489.99 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1938099 Primary Facility 2010-11-05 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, (ROCKY MOUNTAIN DRILLING) DRILLED AND CEMENTING 40' OF 24"CONDUCTOR PIPE IN.
1938101 Primary Facility 2010-11-19 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS , WHIPSTOCK # 17 SKIDDED TO CROUSHORE # 11 -H ,READY TO SET SURFACE LATE TONIGHT.E&S AND PITS ARE IN GOOD CONDITIIN.
1938134 Primary Facility 2010-11-22 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17 ON CROUSHORE # 11 - H ,CEMENTING 11 3/4" COAL STRING . BUMB PLUG AND FLOATS HELD. CEMENET RETURNS TO SURFACE. PROCEEDING TO DRILL 8 5/8". E&S AND PITS LOOK GOOD.
1938139 Primary Facility 2010-11-29 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17 ON CROUSHORE # 11- H ,CEMENTED 8 5/8" INTERMEDIATE CASING ,BUMB PLUG AND FLOATS HELD. CEMENT RETURNS TO SURFACE.PROCEEDING TO DRILL 5 1/2". E&S AND PITS LOOK GOOD.
1939668 Primary Facility 2010-12-27 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, NOMAC -235 IS STARTING DRILLING. REACHED 3100 ' AT PRESENT TIME. E&S AND PITS LOOK IN GOOD CONDITION.
1943660 Primary Facility 2011-01-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, NOMAC - 235 FINISH DRILLING @ 6000 ' . MUDDED AND CAPPED WELL. PATTERSON - 227 MOVING ON STARTING 1/10/2011 (NEW - RIG ). E&S AND PITS ARE IN GOOD CONDITION.
1948361 Primary Facility 2011-02-07 Routine/Complete Inspection No Violations Noted
1955529 Primary Facility 2011-03-08 Routine/Complete Inspection No Violations Noted
1958197 Primary Facility 2011-02-23 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. ARRIVED TO WATCH CEMENTING CREW FINISHING CEMENTING PROD. STRING IN, WATCH RETURNS TO SURFACE AND CLEAN UP. NOW RIG WILL WAIT 8 HRS. BEFORE MOVING TO CROUSHORE 10 - H.
1958198 Primary Facility 2011-02-22 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS ARE IN GOOD CONDITION.KOP @ 7652', LANDING CURVE @ 8235'.
1961132 Primary Facility 2011-03-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION. ALL WELLS ON PAD COMPLETED.RIG MOVING OFF.
1961206 Primary Facility 2011-02-02 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK GOOD CONDITION. CONDUTOR CEMENTED IN @ 40' OF 24"CASING.
1964312 Primary Facility 2011-04-06 Routine/Complete Inspection No Violations Noted
1984804 Primary Facility 2011-06-27 Routine/Complete Inspection No Violations Noted
1989861 Primary Facility 2011-07-20 Routine/Complete Inspection No Violations Noted
2029226 Primary Facility 2011-12-21 Routine/Complete Inspection No Violations Noted Met onsite with Chevron representative Chad Eisenman. Drilling had been completed, well appeared tohave been equipped for production. Site grading work was in the process of being completed. Discussed final site restoration with Mr. Eisenmann while onsite. Site will be temporarily stabilized during the winter months and in the spring of 2012 final restoration will be completed.
2101457 Primary Facility 2012-09-18 Routine/Complete Inspection No Violations Noted Site ID sign in place, site fenced and gated, tanks in containment, wells labeled.
2488217 Primary Facility 2016-05-20 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, Routine Inspection all looks good.

For data sources see[8]

References