X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24407

Well Details

Well ID: 37-051-24407
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Dunbar Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148718
Farm/Lease Name: KURUTZ UNIT 11H
License Status:
Spud Date:
Permit Date: 2010-11-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.967378
Longitude: -79.679111

For data sources see[1][2][3]

Well History

Date Event
2010-11-23 New Permit Application
2011-02-15 Performed Spud Operation
2011-05-18 Drilling Completion
2011-11-16 Drilling Completion
2012-07-17 Perforation
2012-07-17 Performed Stimulation
2016-04-11 DEVIATED
2016-04-11 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-07-17 2012-07-17 7,707 3,083,514

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 GBW-30 BREAKER Halliburton Energy Services Gel Breaker Carbohydrates 95.00 0.00063000
Hemicellulase enzyme 9012-54-8 15.00 0.00010000
Biocide EC 6116A Nalco Biocide Polyethylene glycol 25322-68-3 60.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00689000
Dibromoacetonitrile 3252-43-5 5.00 0.00115000
EC6673W Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00669000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
Proppant (lbs) Proppant 8.20 9.01
WG-36 GELLING AGENT Halliburton Energy Services Water Viscosifier Guar gum 9000-30-0 100.00 0.00223000
ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.27
EC6486A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00719000
Clean Volume (gals) Carrier/Base Fluid 91.80 100.00

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-07-17 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 149,647.00 153 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 428,291.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 278,601.00 334 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 198,691.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 156,291.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 126,022.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 158,755.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 159,033.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,847.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 914.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid 1,128.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 11.38 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,948.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 8,913.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 7,733.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 16.15 Tons LANDFILL 073 114 654
2013 CHEVRON APPALACHIA LLC Produced Fluid 4,005.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 1,123.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 805.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 288.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 428.34 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,540.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 111.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 115.00 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 149.01 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 158.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 76.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 233.33 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1944022 Primary Facility 2011-01-20 Routine/Complete Inspection No Violations Noted
1960162 Primary Facility 2011-03-24 Routine/Complete Inspection No Violations Noted
1961107 Primary Facility 2011-03-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S LOOK GOOD CONDITION.CONDUTOR IS SET, WAITING ON RIG.
1967349 Primary Facility 2011-04-19 Routine/Complete Inspection No Violations Noted
1973584 Primary Facility 2011-05-17 Routine/Complete Inspection No Violations Noted
1977445 Primary Facility 2011-05-31 Routine/Complete Inspection No Violations Noted
1984046 Primary Facility 2011-05-17 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. (TD) @ 7709' MUDDING UP AND CAPPED. MOVING OVER TO KURUTZ # 10 - H.
1984051 Primary Facility 2011-05-14 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.RAN INTERMEDIATE CASING @ 2772' AND CEMENTING (5/12/2011).DRILLING @ 3108' TODAY.
1984054 Primary Facility 2011-05-02 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. BACK TO DRILLING 5/1/2011. TD COAL STRING @ 671'. CEMENTING COAL STRING. TOOK 965 SACKS OF CEMENT TO FILL THE VOID.
1984055 Primary Facility 2011-04-27 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLING @ 469' ,STUCK IN HOLE.
1984057 Primary Facility 2011-04-23 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. MOVING RIG OVER TODAY.
1984060 Primary Facility 2011-03-31 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SET 24" CONDUCTOR PIPE ( 2 /15/2011).
1984830 Primary Facility 2011-06-29 Complaint Inspection No Violations Noted
2005130 Primary Facility 2011-09-19 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S & PITS LOOK IN GOOD CONDITION.RIG MOVING ON SITE (PIONEER DRILLING).
2017365 Primary Facility 2011-11-03 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, MOVED TO (KURUTZ 11 - H ), STARTED RUNNING DRILL PIPE IN HOLE ( 11/2/2100 ).
2025516 Primary Facility 2011-11-09 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 10,244', RUNNING PROD. CASING AND CEMENTING TONIGHT.
2025889 Primary Facility 2011-11-14 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING TO (11,986'),RUNNING PROD. CASING AND CEMENTING (11/13/2011).
2047990 Primary Facility 2012-02-01 Incident- Response to Accident or Event No Violations Noted Hole in the liner with water coming in. Violation becasue pit not impermiable. The violation is recorded on Well #10, permit 051-24406, eFacts#: 2047985.
2048073 Primary Facility 2012-02-09 Follow-up Inspection No Violations Noted On February, 8, 2012, while subcontractor was removing / mixing the material in the cuttings pit, a Chevron employee got a reading of 22 ppm hydrogen sulfide (H2S) on his PPM. All work was halted and the site evacuated until the situation was resolved.
2048107 Primary Facility 2012-02-10 Follow-up Inspection No Violations Noted On February 10, 2012, WQSS Vince Yantko and I visited the Kurutz site to evaluate the situation. The site was still shut down and an environmental contractor was monitoring for hydrogen sulfide. This contractor reported that there were no new detects.
2048118 Primary Facility 2012-02-14 Follow-up Inspection No Violations Noted On February 14, 2012, I stopped at the Kurutz site to check progress. They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadn’t any hits.
2048124 Primary Facility 2012-02-17 Follow-up Inspection No Violations Noted On February 15, 2012, Chevron’s contractor again started removing material from the cuttings pit.
2048195 Primary Facility 2012-02-22 Follow-up Inspection No Violations Noted On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location. Bill’s investigation revealed that this pit does not comply with requirements under Chapter 78 – specifically 78.56 a 4 iii.
2089970 Primary Facility 2012-07-12 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, HALIBURTON WAS RIGGED -UP FOR FRAC JOB PRESSURE TESTING FOR 3 RD TIME WHEN CHICKSAM HAMMER UNION FAILED. DAMAGING IRON ON LOCATION. NO INJURIES ON LOCATION. ALL IRON WILL BE REMOVED AND TESTED (ASAP). NEW IRON IS BEING BROUGHT IN ON LOCATION. THE LINER IS BEING REPLACE AT AREA OF BLOW OUT.NO EVIRNOMENTAL IMPACK ,DUE TO USING OF FRESH WATER TO PRESSURE TEST.
2107506 Primary Facility 2012-09-26 Site Restoration No Violations Noted Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November. Extension approved.
2384449 Primary Facility 2015-06-26 Routine/Complete Inspection No Violations Noted On 06/26/15 at approximately 1500 hours I conducted a routine complete inspection of the Kurutz Unit. The Act 9 sign was in place and visible. All required documents were present in the mailbox. The site was well vegetated and no signs of accelerated erosion were noted. The well heads appeared to be in good condition. There were no violations noted at the time of inspection.
2684585 Primary Facility 2018-01-22 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site.
2825068 Primary Facility 2019-01-10 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[9]

References