X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24418

Well Details

Well ID: 37-051-24418
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Menallen Township
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID: 149422
Farm/Lease Name: TESLOVICH UNIT 31H
License Status:
Spud Date:
Permit Date: 2011-01-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.956972
Longitude: -79.761242

For data sources see[1][2][3]

Well History

Date Event
2011-01-06 New Permit Application
2011-01-28 Performed Spud Operation
2011-03-26 Drilling Completion
2011-07-13 Drilling Completion
2011-10-04 Perforation
2011-10-04 Performed Stimulation
2016-04-12 DEVIATED
2016-04-12 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-10-04 2011-10-04 8,033 3,928,868

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LEB-10X Clearwater International Enzyme Breaker Ethylene glycol 107-21-1 60.00 0.00001000
Unihib G Geosafe Chemicals Corrosion Inhibitor Ethoxylated Alcohol 35.00 0.00057000
Resin Based Nonionic Inhibitor 35.00 0.00057000
Diethylene glycol monobutyl ether 112-34-5 50.00 0.00081000
Biocide EC 6116A Nalco Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00634000
Polyethylene glycol 25322-68-3 60.00 0.01
Dibromoacetonitrile 3252-43-5 5.00 0.00106000
Unislik ST 50 CESI Chemical Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
ScaleHib A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00646000
Friction Reducer B Nalco Friction Reducer No Hazardous Components 0.00 0.00
Water Clearwater International Carrier Fluid 91.46
WGA-3, CMHPG Ashland Gelling Agent Carboxymethyl-hydroxypropyl Guar Blend 100.00 0.00255000
7.5 Acid Concentrated HCl Acid Hydrochloric acid 7647-01-0 7.50 0.32
Iron Control A Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00575000
Sand Clearwater International Proppant Quartz 14808-60-7 99.90 8.02

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-10-04 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 ATLAS RESOURCES LLC 412,780.00 167 0.00 0 0.00 0
2013 ATLAS RESOURCES LLC 431,391.00 365 0.00 0 0.00 0
2014 ATLAS RESOURCES LLC 296,951.00 365 0.00 0 0.00 0
2015 ATLAS RESOURCES LLC 217,490.00 365 0.00 0 0.00 0
2016 ATLAS RESOURCES LLC 165,710.00 366 0.00 0 0.00 0
2017 ATLAS RESOURCES LLC 147,649.00 365 0.00 0 0.00 0
2018 DIVERSIFIED OIL & GAS LLC 129,112.00 365 0.00 0 0.00 0
2019 DIVERSIFIED OIL & GAS LLC 111,961.75 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ATLAS RESOURCES LLC Fracing Fluid Waste 3,056.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 ATLAS RESOURCES LLC Fracing Fluid Waste 8,073.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 ATLAS RESOURCES LLC Drilling Fluid Waste 1,248.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 ATLAS RESOURCES LLC Drilling Fluid Waste 11,724.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 ATLAS RESOURCES LLC Produced Fluid 514.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2012 ATLAS RESOURCES LLC Fracing Fluid Waste 20,142.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 ATLAS RESOURCES LLC Produced Fluid 2,880.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 ATLAS RESOURCES LLC Produced Fluid 83.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2012 ATLAS RESOURCES LLC Fracing Fluid Waste 2,695.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 ATLAS RESOURCES LLC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013 ATLAS RESOURCES LLC Produced Fluid 1,736.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ATLAS RESOURCES LLC Produced Fluid 570.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ATLAS RESOURCES LLC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015 ATLAS RESOURCES LLC Produced Fluid 121.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 ATLAS RESOURCES LLC Produced Fluid 515.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ATLAS RESOURCES LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 ATLAS RESOURCES LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 ATLAS RESOURCES LLC Produced Fluid 30.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 ATLAS RESOURCES LLC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 ATLAS RESOURCES LLC Produced Fluid 5.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2017 ATLAS RESOURCES LLC Produced Fluid 103.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2018 DIVERSIFIED OIL & GAS LLC Produced Fluid 99.00 Bbl INJECTION DISPOSAL WELL 2D0830792
2018 ATLAS RESOURCES LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 ATLAS RESOURCES LLC Produced Fluid 5.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2019 DIVERSIFIED OIL & GAS LLC Produced Fluid 112.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 DIVERSIFIED OIL & GAS LLC Produced Fluid 135.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1958104 Primary Facility 2011-02-18 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION.
1961150 Primary Facility 2011-03-28 Routine/Complete Inspection No Violations Noted
1961170 Primary Facility 2011-03-25 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION.CLEANING HOLE,DRILLING @ 6457', TD EXSPECTED IN MORNING @ 7350'.MUDDING-UP AND CAPPED UNTIL TRIPPLE RIG AVAILABLE.
1961177 Primary Facility 2011-03-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION.DRILLING IS FINISH @ 7350' THE REPAIRED PATCH COVERS A -AREA OF 20' X 15'. THE PIT LINER HAS BEEN REPAIRED AND LOOKS GOOD.
1961181 Primary Facility 2011-03-25 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S LOOKS IN GOOD CONDITION.CLEANING HOLE ,DRILLING @ 6488' WHEN A POCKET OF NATURAL GAS RELEASED MANDATING FLARING TO BE INCORPRATED FOR SAFETY.I WAS CALLED 5 MIN. AFTER THIS HAPPENING @ 10:40 PM. I CALLED SUPERVISOR (MIKE ARCH) AND ADVISE HIM OF THE CONDITION. I RESPONDED TO WELL SITE BY 11:40 PM. THE FIRE WAS OUT AND UNDER CONTROL .THE EXTREME HEAT CAUSED WRINKLING AND FEW HOLES AS BIG AS BASEBALLS.THE PIT LEVEL IS SIX FEET BELOW HOLES.GAVE PERMISSION TO CONTINUE TO DRILL AND COMPLETE ABOUT 500' OF WELL TO TD.THE LINER WILL BE REPAIRED AT FIRST THING IN MORNING.CROWN # 5 COMPANY MEN HANDLE A SITUATION QUICKLY AND RESPONSIBLE.AT NO TIME DURING THIS ISSUE WAS CITIZENS,COMPANY EMPLOYEES.OR ENVIRONMENT EVER COMPROSMISED.
1961198 Primary Facility 2011-03-03 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS GOOD CONDITION.CONDUTOR CEMENTED IN @ 40'OF 24" CASING.PRESENT DEPTH @ 2625'.EXSPECTED TD @ 2646',CLEANING HOLE AND CEMENTING LATE TONIGHT. CROWN # 5 MOVING ON 3/4/2011.
1961199 Primary Facility 2011-02-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS GOOD CONDITION.CONDUTOR CEMENTED IN @ 40' OF 24"CASING.
1961208 Primary Facility 2011-02-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION.YOST # 5 DRILLING @ 677' CEMENTING COAL STRING TONIGHT.
1961213 Primary Facility 2011-02-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION.TRUCKS DELIVERING STONE TO LOCATION. YOST # 5 DRILLING @ 386' CEMENTING SURFACE CASING TONIGHT.
1961237 Primary Facility 2011-01-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, 40' OF 24"CASING AS CONDUTOR CEMENTED IN. E&S AND PITS LOOK GOOD CONDITION. TRUCK DELIVERING STONE TO LOCATION.
1977458 Primary Facility 2011-05-31 Routine/Complete Inspection No Violations Noted
1984559 Primary Facility 2011-06-15 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.DRILLING @ 7353' TODAY.
1986080 Primary Facility 2011-07-06 Routine/Complete Inspection No Violations Noted
2005840 Primary Facility 2011-07-05 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,DRILLING TO 7326' ON FLUID,DECIDED TO PLUG BACK (6800'). NEW (KOP) @ 6987'. HAVING DIFFICULT LOCATING MARCELLUS FORMATION.
2005844 Primary Facility 2011-07-12 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON FLUID @ 11,163'.
2005846 Primary Facility 2011-08-19 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, CEMENTING PROD. CASING ON (7/15/2011) @ 12'498'.
2087566 Primary Facility 2012-07-26 Routine/Complete Inspection No Violations Noted Site ID sign up but leaning and permit numbers barely readable, site recently reclaimed but not seeded, E&S looked good, new equipment with no leaks visible.
2576623 Primary Facility 2017-03-29 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place. The E&S plan was not in place. It is recommended that the E&S plan be placed at the site. The production equipment appeared to be in good condition. The well site was well vegetated overall. An extensive erosion channel was observed at the outfall of the access road culvert (see photograph). Sediment was not observed outside of the LOD. It is highly recommended that repairs be made and it is requested that photographs of the repairs be sent to my attention.
2576627 Primary Facility 2017-03-29 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place. The E&S plan was not in place. It is recommended that the E&S plan be placed at the site. The production equipment appeared to be in good condition. The well site was well vegetated overall. An extensive erosion channel was observed at the outfall of the access road culvert (see photograph). Sediment was not observed outside of the LOD. It is highly recommended that repairs be made and it is requested that photographs of the repairs be sent to my attention.
2839131 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[9]

References