X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24462

Well Details

Well ID: 37-051-24462
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Luzerne Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148370
Farm/Lease Name: FRANKHOUSER UNIT 5H
License Status:
Spud Date:
Permit Date: 2011-09-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.944142
Longitude: -79.901536

For data sources see[1][2][3]

Well History

Date Event
2011-09-12 New Permit Application
2011-09-29 Performed Spud Operation
2012-07-15 Drilling Completion
2013-01-04 Perforation
2013-01-04 Performed Stimulation
2016-04-22 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-04 2013-01-04 7,912 3,677,108

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30.0 0.03341
GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60.0 0.00006000
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30.0 0.00677
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30.0 None
CMHPG (lbs) Ashland Water Viscosifier Carboxymethylhydroxyporoyl guar blend Mixture 100.0 0.00374
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30.0 0.00688
Proppant (lbs) Proppant 7.92 8.66932
7.5 Hcl Acid Reagent/PP G Used to open perfs Hydrochloric Acid 7647-01-0 7.5 0.54346
EC 6116a Nalco Biocide Dibromoacetonitrile 3252-43-5 5.0 0.00114
Polyethylene Glycol 25322-68-3 60.0 0.01369
1,1-Dibromo-3-nitrilopropionamide 10222-01-2 30.0 0.00685
Clean Volume (gals) Carrier/Base Fluid 92.08 100.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-01-04 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 356,990.00 245 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 355,307.00 365 0.00 0 22.50 184
2015 CHEVRON APPALACHIA LLC 255,099.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 189,433.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 163,880.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 142,838.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 118,941.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,480.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 331.50 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 437.50 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 479.99 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 598.75 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,963.25 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 8,038.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 48.61 Tons LANDFILL 073 114 654
2013 CHEVRON APPALACHIA LLC Produced Fluid 3,402.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,802.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 25,891.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 2,635.25 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 22.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,060.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 277.51 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 518.76 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 2,338.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 55.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 144.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 109.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 32.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 228.00 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 53.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 254.00 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 27.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 274.25 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 32.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 29.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 87.50 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 562.50 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2009767 Primary Facility 2011-10-05 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, CONDUCTOR CEMENTED IN @ 40' (9/30/2011).
2017398 Primary Facility 2011-10-31 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, YOST # 5 MOVING ON (FRANKHOUSER # 5 - H ),5/30/2011.
2017401 Primary Facility 2011-11-01 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, YOST # 5 DRILLING ON AIR @ 447', RUNNING 16" WATER PROTECTION CASING AND CEMENTING TONIGHT.
2017403 Primary Facility 2011-11-03 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, YOST # 5 DRILLING ON AIR @ 557'. RUNNING COAL PROTECTION CASING AND CEMENTING TODAY. MINE @ 507' -510, SET CEMENT BASKET @ 487' .
2025616 Primary Facility 2011-11-16 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 2671', RUNNING INTERMEDIATE CASING AND CEMENTING TODAY.
2056055 Primary Facility 2012-03-14 Incident- Response to Accident or Event In Compliance with Policy Companion inspection to eFacts #2056000, no additional violations found.
2056068 Primary Facility 2012-03-23 Follow-up Inspection In Compliance with Policy On March 23, 2012, WQS William Keefer and I checked the Frankhouser site. It didn’t look like Chevron had done anything yet with the cuttings pit, but they were in the process of moving the rig.On March 23, 2012, WQS William Keefer and I checked the Frankhouser site. It didn’t look like Chevron had done anything yet with the cuttings pit, but they were in the process of moving the rig.
2089989 Primary Facility 2012-06-17 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 325 STARTED MOVING ON TODAY.
2089991 Primary Facility 2012-07-05 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS ,PATTERSON # 325 DRILLING ON FLUID @ 7953' TODAY,
2089998 Primary Facility 2012-07-16 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 325 DRILLING ON FLUID @ 12,874' (TD). RUNNING 51/2" PROD. CASING AND CEMENTING TONIGHT (7/15/2012).
2146106 Primary Facility 2013-03-06 Routine/Complete Inspection No Violations Noted Site ID in place, E&S, PPC, permits in tube. Site stable and E&S in place and functioning. Two pits with over 2 foot freeboard, tubing being put in on well heads today.
2169144 Primary Facility 2013-05-16 Site Restoration No Violations Noted Site stable. Restoration extension given until 5/9/14.
2309881 Primary Facility 2014-09-02 Routine/Complete Inspection No Violations Noted Inspection the result of a citizen complaint. At the time of inspection the wells appeared to be drilled and equipped for production.
2309882 Primary Facility 2014-09-02 Routine/Complete Inspection No Violations Noted Inspection the result of a citizen complaint. At the time of inspection the wells appeared to be drilled and equipped for production.
2372490 Primary Facility 2015-05-19 Site Restoration No Violations Noted
2384307 Primary Facility 2015-06-24 Routine/Complete Inspection No Violations Noted
2423804 Primary Facility 2015-10-22 Routine/Complete Inspection No Violations Noted
2586231 Primary Facility 2017-04-21 Routine/Partial Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The production equipment appeared to be in good condition. Several small areas of sparse vegetation had received additional topsoil, seed, and mulch. The site overall was well vegetated and there were no signs of erosion observed. Once the areas of sparse vegetation reach uniform 70% vegetative cover the site will meet the requirements for NOT approval. There were no violations observed at the time of inspection.

For data sources see[9]

References