X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24467

Well Details

Well ID: 37-051-24467
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Springhill Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147956
Farm/Lease Name: CHICO UNIT 3H
License Status:
Spud Date:
Permit Date: 2011-09-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.746978
Longitude: -79.858478

For data sources see[1][2][3]

Well History

Date Event
2011-09-19 New Permit Application
2011-10-05 Performed Spud Operation
2012-03-02 Drilling Completion
2012-11-13 Perforation
2012-11-13 Performed Stimulation
2016-04-12 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-14 2012-11-14 6,900 4,049,156

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clean Volume (gals) Carrier/Base Fluid 91.37 100.00
EC6486A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00752000
WG-36 GELLING AGENT Halliburton Energy Services Water Viscosifier Guar gum 9000-30-0 100.00 0.00205000
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.29
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00
EC6673W Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00714000
Biocide EC 6116A Nalco Biocide Polyethylene glycol 25322-68-3 60.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00758000
Dibromoacetonitrile 3252-43-5 5.00 0.00126000
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Carbohydrates 95.00 0.00006000
Hemicellulase enzyme 9012-54-8 15.00 0.00001000
Proppant (lbs) Proppant 8.63 9.52

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-11-13 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 683,902.00 275 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 575,910.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 432,652.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 359,532.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 290,319.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 236,409.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 205,545.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 37.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 0.72 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 164.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 36.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,757.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 23.57 Tons LANDFILL 073 114 654
2013 CHEVRON APPALACHIA LLC Produced Fluid 1,559.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Produced Fluid 4.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 70.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 4.90 Tons LANDFILL 100419
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 17,144.40 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 45.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 2,247.34 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,051.66 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 408.02 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 583.67 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 3,435.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 73.34 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 183.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 158.33 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 153.34 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 39.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 298.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 33.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 9.13 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 418.34 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2015137 Primary Facility 2011-10-25 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,RIG # 7 DRILLING AT 214' ON AIR. RUNNING WATER PROTECTION CASING AND CEMENTING TONIGHT.
2015142 Primary Facility 2011-10-26 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, RIG # 7 DRILLING @ 400' ON AIR. ALL LOOKS GOOD.
2015144 Primary Facility 2011-10-27 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 475' TD,RUNNING COAL PROTECTION CASING AND CEMENTING TODAY.
2025897 Primary Facility 2011-11-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 7233', MUDDED UP AND CAPPED,MOVING TO CHICO 2 - H .
2025907 Primary Facility 2011-11-04 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 6503' TODAY.
2025913 Primary Facility 2011-10-29 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 2772' ,RUNNING INTERMEDIATE CASING AND CEMENTING TODAY.
2054955 Primary Facility 2012-02-16 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 WAITING ON CORING TO BE COMPLETED. SET 2 -PLUGS TO (KOP) 7200'.
2054962 Primary Facility 2012-02-02 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,PATTERSON # 339 MOVING ONTO LOCATION THIS WEEK.
2065761 Primary Facility 2011-10-25 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS DRILLING ON AIR @ 214' (TD). RUNNING WATER PROTECTION CASING AND CEMENTING TODAY.
2065762 Primary Facility 2011-10-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS DRIILING ON AIR @ 444' ( TD). RUNNING COAL PROTECTION CASING AND CEMENTING TODAY.
2065790 Primary Facility 2011-11-03 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS DRILLING ON AIR @ 2680' (TD). RUNNING INTERMEDIATE CASING AND CEMENTING TONIGHT.
2065795 Primary Facility 2011-11-18 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON AIR @ 7233' (TD). LOADING HOLE WITH OIL BASE MUD AND CAPPING.
2065798 Primary Facility 2011-11-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS MOVING TO CHICO # 2 - H (11/20/2011).
2065803 Primary Facility 2012-02-22 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 11,575' (TD). RUNNING 51/2" PROD. CASING AND CEMENTING TONIGHT.
2065807 Primary Facility 2012-02-23 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PATTERSON # 339 WALKING OVER TO CHICO # 2 - H.
2075011 Primary Facility 2012-06-12 Administrative/File Review In Compliance with Policy Operator performed the proper spill requirements in compliance with the current spill policy.
2105003 Primary Facility 2012-10-04 Routine/Complete Inspection No Violations Noted The three wells at the site have been drilled. All three wells were labeled, but well 1H has the wrong permit number on its label. The 1H label should read 051-24490 and it reads 051-24465 now. This should be changed to reflect the correct well permit number. I understand the three wells are scheduled to be fracked late this fall.
2124996 Primary Facility 2012-12-11 Routine/Complete Inspection No Violations Noted ID sign up, wells labeled, E&S in place and functioning.
2184883 Primary Facility 2013-07-18 Site Restoration No Violations Noted Site restoration extension requested by operator until 12/13/13. Site stable and 90% reclaimed at this time. Request approved.
2357540 Primary Facility 2015-04-01 Site Restoration No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been restored as outlined in the PCSM plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2384353 Primary Facility 2015-06-26 Routine/Complete Inspection No Violations Noted On 06/26/15 at approximately 1345 hours I conducted a routine complete inspection of the Chico Unit. The Act 9 sign was in place. The site was very well vegetated. There were no signs of accelerated erosion observed. The wells appeared to be in good condition. There were no violations noted at the time of inspection.
2561649 Primary Facility 2017-02-06 Routine/Complete Inspection No Violations Noted

On 02/06/17 at approximately 1245 hours I conducted a routine complete inspection of the Chico Unit. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. There were no violations observed at the time of inspection.

2668426 Primary Facility 2017-11-30 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. There were no violations observed at the time of inspection.
2741842 Primary Facility 2018-06-01 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.

For data sources see[9]

References