If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24516 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.835481,"lon":-79.884806,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Nicholson Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 149173 | |
Farm/Lease Name: REJISS UNIT 2H | |
License Status: Active | |
Spud Date: 2012-09-26 | |
Permit Date: 2012-09-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.835481 | |
Longitude: -79.884806 |
Date | Event |
---|---|
2012-09-12 | New Permit Application |
2012-09-26 | Performed Spud Operation |
2013-06-05 | Drilling Completion |
2014-06-03 | New Permit Application |
2014-09-05 | Perforation |
2014-09-05 | Performed Stage 1 of Stimulation |
2014-09-16 | Perforation |
2014-09-16 | Performed Stage 2 of Stimulation |
2014-09-17 | Perforation |
2014-09-17 | Performed Stage 3 of Stimulation |
2014-09-18 | Perforation |
2014-09-18 | Performed Stage 4 of Stimulation |
2014-09-18 | Performed Stage 5 of Stimulation |
2014-09-18 | Performed Stage 6 of Stimulation |
2014-09-18 | Performed Stage 7 of Stimulation |
2014-09-19 | Perforation |
2014-09-19 | Performed Stage 10 of Stimulation |
2014-09-19 | Performed Stage 11 of Stimulation |
2014-09-19 | Performed Stage 8 of Stimulation |
2014-09-19 | Performed Stage 9 of Stimulation |
2014-09-20 | Perforation |
2014-09-20 | Performed Stage 12 of Stimulation |
2014-09-20 | Performed Stage 13 of Stimulation |
2014-09-21 | Perforation |
2014-09-21 | Performed Stage 14 of Stimulation |
2014-09-21 | Performed Stage 15 of Stimulation |
2014-09-21 | Performed Stage 16 of Stimulation |
2014-09-22 | Perforation |
2014-09-22 | Performed Stage 17 of Stimulation |
2014-09-22 | Performed Stage 18 of Stimulation |
2017-04-10 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-09-05 | 2014-09-22 | 7,895 | 5,667,200 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 8.9507 | 0 |
J134 | Schlumberger | Enzyme Breaker | Hemicellulase enzyme | 9012-54-8 | 100 | 0.00064639 | 0 | |
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00043799 | 0 | |
A264 | Schlumberger | Corrosion Inhibitor | Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00003351 | 0 | |
Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00001117 | 0 | ||||
Methanol | 67-56-1 | 40 | 0.00004468 | 0 | ||||
Aliphatic acids | Proprietary | 30 | 0.00003351 | 0 | ||||
7.5% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 8 | 0.0203674 | 0 | |
J580 | Schlumberger | Gelling Agent, Water | Carbohydrate polymer | Proprietary | 100 | 0.0108933 | 0 | |
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 90.8778 | 0 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00081517 | 0 | |
EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.00153862 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00012822 | 0 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00076931 | 0 | ||||
J624 | Schlumberger | Surfactant Gelling Agent | Propan-2-ol | 67-63-0 | 30 | 0.00030624 | 0 | |
Fatty Acid Amidoalkyl Betaine | Proprietary | 60 | 0.00061248 | 0 | ||||
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00077122 | 0 | |
J623 | Schlumberger | Rheology Modifier | Propan-2-ol | 67-63-0 | 30 | 0.00101245 | 0 | |
J567 | Schlumberger | Encapsulated Breaker | Sulfonated Polystyrene | Proprietary | 100 | 0.00098018 | 0 | |
J609W | Schlumberger | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | 0.00375309 | 0 | |
Urea | 57-13-6 | 5 | 0.00062551 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-09-05 | 1 | OTTAWA | 1,834,000 | 9,209 | 9,600 |
2014-09-16 | 2 | OTTAWA | 1,834,000 | 9,182 | 9,401 |
2014-09-17 | 3 | OTTAWA | 1,834,000 | 9,222 | 9,413 |
2014-09-18 | 4 | OTTAWA | 1,834,000 | 9,196 | 9,583 |
2014-09-18 | 5 | OTTAWA | 1,834,000 | 9,224 | 9,571 |
2014-09-18 | 6 | OTTAWA | 1,834,000 | 9,110 | 9,321 |
2014-09-18 | 7 | OTTAWA | 1,834,000 | 9,169 | 9,557 |
2014-09-19 | 8 | OTTAWA | 1,834,000 | 9,010 | 9,531 |
2014-09-19 | 9 | OTTAWA | 1,834,000 | 8,683 | 9,220 |
2014-09-19 | 10 | OTTAWA | 1,834,000 | 8,358 | 9,190 |
2014-09-19 | 11 | OTTAWA | 1,834,000 | 8,070 | 8,672 |
2014-09-20 | 12 | OTTAWA | 1,834,000 | 8,563 | 9,321 |
2014-09-20 | 13 | OTTAWA | 1,834,000 | 8,210 | 9,291 |
2014-09-21 | 14 | OTTAWA | 1,834,000 | 8,694 | 9,445 |
2014-09-21 | 15 | OTTAWA | 1,834,000 | 9,029 | 9,513 |
2014-09-21 | 16 | OTTAWA | 1,834,000 | 9,049 | 9,377 |
2014-09-22 | 17 | OTTAWA | 1,834,000 | 9,066 | 9,488 |
2014-09-22 | 18 | OTTAWA | 1,834,000 | 9,051 | 9,606 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 28,963.00 | 9 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 879,185.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 610,695.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 451,753.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 344,295.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 280,956.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 180.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 629.10 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 5,434.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 80.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 721.35 Tons | LANDFILL | 100419 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 108.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,380.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 2.90 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,533.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 24.44 Tons | LANDFILL | 100277 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 5,461.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 73.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 281.67 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 18.77 Tons | RESIDUAL WASTE TRANSFER FACILITY | MID074259565 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 5,980.32 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 736.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,599.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,576.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 415.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 37.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 62.49 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 28.33 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,914.67 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 217.66 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 37.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 420.99 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 83.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 523.34 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2113032 | Primary Facility | 2012-09-27 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,CONDUCTOR SET @ 50' TODAY (9/27/2012). |
2113035 | Primary Facility | 2012-10-17 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 9 MOVING ON TODAY(10/15/2012).DRILLING ON AIR @ 287' TODAY. |
2113049 | Primary Facility | 2012-10-22 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 9 RAN WATER PROTECTION CASING (10/18/2012) @ 287'. DRILLING ON AIR @ 533' (TD). RAN COAL PROTECTION CASING AND CEMENTING LAST NIGHT(10/21/2012). DRILLING @ 560' TODAY. |
2113058 | Primary Facility | 2012-10-26 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 9 DRILLING ON AIR @ 2613' (TD). RUNNING INTERMEDIATE CASING AND CEMENTING TODAY(10/25/2012). |
2113066 | Primary Facility | 2012-11-02 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 9 DRILLING ON AIR @ 8350' (TD). SETTING CEMENT PLUG BACK TO 7497'. LOADING HOLE WITH OIL BASE MUD AND CAPPING TODAY. |
2121931 | Primary Facility | 2012-08-23 | Routine/Complete Inspection | No Violations Noted | Pre-op Inspection of well site. Perimeter E&S in place and functioning. |
2126513 | Primary Facility | 2012-11-14 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,HIGHLANDS # 9 DRILLING ON FLUID @ 7500' (FORMATION CAVING IN ON THEM).PLUGGING BACK TO 6131' ATTEMPTING SIDE -TRACK . TODAY DRILLING @ 6881'. |
2126526 | Primary Facility | 2012-11-19 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 9 DRILLING ON FLUID @ 7233' (TD)BEFORE FORMATION (SWELLED) STUCK TOOLS IN HOLE AGAIN. CEMENTED PLUG FROM 6051' TO 5551' (500' PLUG),LEFT 1171' OF TOOLS IN HOLE). MOVING TO REJISS 3 - H. |
2139675 | Primary Facility | 2013-02-14 | Routine/Complete Inspection | No Violations Noted | Site Id sign up, guarded, plans and permits in box, E&S in place and functioning, some slopes may need to be monitored to ensure stability-stable now. |
2162633 | Primary Facility | 2013-04-30 | Routine/Complete Inspection | No Violations Noted | Sign up, E&S, PPC, permits in box. E&S in place and functioning. Good growth on site. No activity recently. |
2178442 | Primary Facility | 2013-06-05 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 12,928' (TD) RUNNING 51/2 " PROD.CASING AND CEMENTING TONIGHT. |
2178447 | Primary Facility | 2013-06-03 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID @ 10,014' TODAY. LANDED IN MARCELLUS ON (6/1/2012 @ 8654'. |
2178457 | Primary Facility | 2013-05-30 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 DRILLING ON FLUID TODAY @ 7336' ( KOP ). |
2178459 | Primary Facility | 2013-05-17 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PATTERSON # 339 MOVING ON TO LOCATION THE WEEK OF (5/16/2013). |
2205665 | Primary Facility | 2013-09-17 | Routine/Complete Inspection | No Violations Noted | Act 9 sign up, three wells in not fracked yet, area stable, plans and permits in box. |
2252483 | Primary Facility | 2014-03-11 | Routine/Complete Inspection | No Violations Noted | On 3/11/2014, I conducted an inspection at the Chevron Appalachia’s Rejiss 1H, 2H, 3H Well Unit site in Nicholson Twp., Fayette County. The reason for the inspection was a request by the operator for an extension on the date that the site needed to be restored by. The original restoration date was 3/19/2014 and an extension to 3/19/16 is being requested. |
2358707 | Primary Facility | 2015-01-27 | Routine/Complete Inspection | No Violations Noted | |
2467654 | Primary Facility | 2016-03-16 | Complaint Inspection | No Violations Noted | On 03/16/16 at approximately 0930 hours I conducted a complaint inspection of the Rejiss well site. The Act 9 sign was in place and all required documents were present at the site.
The site overall was well vegetated and there were no signs of erosion & sedimentation at the site. A significant amount of stone was also present on the slope of the topsoil stock pile at the southern corner of the well site. It is recommended that this be removed. The complaint against the site alleged that it was not built to the specifications of the approved E&S plans and that the stockpiles were causing environmental concerns. No environmental harm was observed due to the stock piles. The site appears to have been built to plan with the exception of two locations of gravel that appear to be gravel pull offs. One is located near the main site entrance on the northeast side of the access road and the second is near the debris pile on the southwestern access road. This is a violation of 102.5(m)(4). |
2731510 | Primary Facility | 2018-05-14 | Compliance Evaluation | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. Previously, an NOV had been issued for two gravel pull offs along the access road that were not permitted. The gravel pull offs have been removed and the site has been restored. The site was well vegetated and there were no signs of erosion observed. There were no violations observed at the time of inspection. |
For data sources see[9]