37-059-25211

Well Details

Well ID: 37-059-25211
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Jefferson Township
Operator Name: GREYLOCK PROD LLC
Well Pad ID: 149312
Farm/Lease Name: SKIB 4MH
License Status:
Spud Date:
Permit Date: 2009-05-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.896471
Longitude: -80.069492

For data sources see[1][2][3]

Well History

Date Event
2009-05-28 New Permit Application
2009-07-13 Performed Spud Operation
2009-11-26 Drilling Completion
2010-02-23 Perforation
2010-02-23 Performed Stimulation
2010-08-10 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2010-02-19 2010-02-19 7,730 4,010,833

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Plexslick 921 Pumpco Friction Reducer Petroleum Distillate 64742-47-8 30.0 0.02315
Plexaid 673 Pumpco Scale Inhibitor Methyl Alcohol 67-56-1 25.0 0.00575
Ferriplex 40 Pumpco Iron Control for Acid Trisodium Nitrilotriacetate 18662-53-8 40.0 0.00119
Sodium Hydroxide 1310-73-2 1.0 0.00003000
Sodium Sulfate Anhydrous 7757-82-6 2.0 0.00006000
Plexhib 256 Pumpco Corrosion Inhibitor for Acid Methyl Alcohol 67-56-1 40.0 0.0005
Propargyl Alcohol 107-19-7 8.0 0.0001
PSP-40/70 Ottawa Proppant Pumpco Proppant Crystalline silica quartz 14808-60-7 99.9 6.54971
Plexgel 907 LE Pumpco Liquid Gel Hydrocarbons 68476-34-6 70.0 0.0101
Plexbreak 145 Pumpco Breaker Methyl Alcohol 67-56-1 15.0 0.00012
PBC-24-L Microbiocide Pumpco Biocide Tetrahydro-3, 5-Dimethyl-2H-1,3,5-thiadiazine-2-thione 533-74-4 24.0 0.00234
Sodium Hydroxide 1310-73-2 4.0 0.00039
Ferriplex 66 Pumpco Iron Control for Acid Citric Acid 77-92-9 30.0 0.00012
Acetic Acid 64-19-7 50.0 0.0002
P-HCI 15 HCI Pumpco Acid Hydrogen Chloride 7647-01-0 15.0 0.08114
PSP-100 Mesh Proppant Pumpco Proppant Crystalline silica quartz 14808-60-7 99.9 2.9909
Ammonium Persulfate Pumpco Breaker Ammonium Persulfate 7727-54-0 100.0 0.0008
Water ECA Base Fluid 100.0 90.33339

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-02-23 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 ENERGY CORP OF AMER 0.00 0 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 637,788.00 246 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 508,755.00 323 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 366,417.00 358 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 227,033.00 349 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 236,692.00 349 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 164,554.00 360 0.00 0 0.00 0
2016 ENERGY CORP OF AMER 164,740.00 356 0.00 0 0.00 0
2017 ENERGY CORP OF AMER 113,185.00 331 0.00 0 0.00 0
2018 GREYLOCK PROD LLC 86,285.00 346 0.00 0 0.00 0
2019 GREYLOCK PROD LLC 165,641.00 356 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ENERGY CORP OF AMER Produced Fluid 1,775.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 ENERGY CORP OF AMER Drill Cuttings 6.62 Tons LANDFILL 100172
2011 ENERGY CORP OF AMER Fracturing Fluid Waste 2.97 Tons LANDFILL 100172
2011 ENERGY CORP OF AMER Produced Fluid 2,285.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 ENERGY CORP OF AMER Produced Fluid 315.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2012 ENERGY CORP OF AMER Produced Fluid 610.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ENERGY CORP OF AMER Produced Fluid 539.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ENERGY CORP OF AMER Produced Fluid 785.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ENERGY CORP OF AMER Produced Fluid 45.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015 ENERGY CORP OF AMER Produced Fluid 45.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 ENERGY CORP OF AMER Produced Fluid 176.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ENERGY CORP OF AMER Produced Fluid 141.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ENERGY CORP OF AMER Produced Fluid 77.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 ENERGY CORP OF AMER Produced Fluid 44.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 ENERGY CORP OF AMER Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2016 ENERGY CORP OF AMER Produced Fluid 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2017 ENERGY CORP OF AMER Produced Fluid 245.00 Bbl REUSE (AT WELL PAD)
2017 ENERGY CORP OF AMER Produced Fluid 12.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 GREYLOCK PROD LLC Produced Fluid 113.00 Bbl REUSE (AT WELL PAD)
2018 GREYLOCK PROD LLC Produced Fluid 6.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 GREYLOCK PROD LLC Produced Fluid 36.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 GREYLOCK PROD LLC Produced Fluid 22.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 GREYLOCK PROD LLC Produced Fluid 43.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW031
2019 GREYLOCK PROD LLC Other Oil & Gas Wastes 8.12 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 GREYLOCK PROD LLC Produced Fluid 243.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 GREYLOCK PROD LLC Produced Fluid 48.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 GREYLOCK PROD LLC Other Oil & Gas Wastes 19.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 GREYLOCK PROD LLC Produced Fluid 171.00 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1840897 Primary Facility 2009-10-29 Routine/Complete Inspection No Violations Noted
1842843 Primary Facility 2009-11-02 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS BRONCO 37 IS SHUT DOWN ON LOCATION WHILE WELDERS INSTALL A NEW WALKING SYSTEM. RIG WILL WALK TO NEXT HOLE IN A FEW DAYS
1850957 Primary Facility 2009-11-10 Follow-up Inspection No Violations Noted
1867562 Primary Facility 2010-02-01 Routine/Complete Inspection No Violations Noted
1870563 Primary Facility 2010-03-16 Routine/Complete Inspection Violation(s) Noted The Department was at the above referenced Marcellus Well to conduct a Routine Inspection. Its appears that 3 Marcellus wells have been drilled and are in production on this well pad. The Department observed violations at the site. A contractor was on site and had excavated a ditch across the entire pad to drain the surface water that was building up on the back of the pad. The water being discharged was causing accelerated E/S. The E/S controls were over overwhelmed when all the water was directed to one area. The muddy water was flowing over the silt fence and directly into a tributary down gradient. The cut side of the well pad is extremely unstable and multiple slides have occurred causing the soil to reach the drilling pit which does contain flow back water and other drilling compounds..
1911268 Primary Facility 2010-08-09 Routine/Complete Inspection No Violations Noted
2008084 Primary Facility 2011-10-04 Drilling/Alteration No Violations Noted well drilled and in line; location restored; E&S good
2016919 Primary Facility 2011-10-11 Drilling/Alteration No Violations Noted WELL IS HOOKED UP AND PRODUCING.
2415733 Primary Facility 2015-09-04 Routine/Partial Inspection No Violations Noted On 9/4/15, I inspected the Skib A and B Pads with DEP Engineer Dr. Tae-Uk Kim and DEP Biologist Samantha Sullivan and made the following observations:
2448922 Primary Facility 2016-02-05 Compliance Evaluation No Violations Noted On 2/5/16, I performed a compliance evaluation inspection at the Skib A & B Unit Site in response to a previous inspection from 9/4/15 (2415691) that resulted in multiple violations and made the following observations:

•Inconsistencies in pad construction and unmarked wetland areas have been addressed… •At the time of inspection the impoundment on site was full with the liner in place… •The non-permitted access road noted during the 9/4/15 inspection was reported by ECA to be… •The sediment trap that was found to previously be in poor condition had been renovated…

Conclusion: •All violations noted in NOV from the 9/4/15 inspection appear to have been satisfactorily resolved. •No additional violations were noted at the time of inspection. Issues related to the impoundment will be followed up on in summer 2016.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1870563 583401 03/16/2010 2010-03-16 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1870563 583402 03/16/2010 2010-03-16 401CAUSEPOLL - Polluting substance(s) allowed to discharge into Waters of the Commonwealth. Environmental Health & Safety
1870563 583403 03/16/2010 2010-03-16 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
583401 262395 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-09-21 2010-09-21 $5,750.00 $5,750.00
583402 262395 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-09-21 2010-09-21 $5,750.00 $5,750.00
583403 256134 NOV - Notice of Violation Comply/Closed 2010-05-03
583403 262395 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-09-21 2010-09-21 $5,750.00 $5,750.00

For data sources see[9]