X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25385

Well Details

Well ID: 37-059-25385
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Greene Township
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID: 147612
Farm/Lease Name: COLVIN 6
License Status:
Spud Date:
Permit Date: 2009-12-18
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 39.818844
Longitude: -79.976686

For data sources see[1][2][3]

Well History

Date Event
2009-12-18 New Permit Application
2010-03-18 Performed Spud Operation
2010-04-06 Drilling Completion
2010-08-09 NEWLY DRILLED
2010-10-04 Perforation
2010-10-04 Performed Stimulation

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-10-04 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2010 ATLAS RESOURCES LLC 14,803.00 87 0.00 0 0.00 0
2011 ATLAS RESOURCES LLC 80,788.00 365 0.00 0 0.00 0
2012 ATLAS RESOURCES LLC 50,371.00 364 0.00 0 0.00 0
2013 ATLAS RESOURCES LLC 35,810.00 365 0.00 0 0.00 0
2014 ATLAS RESOURCES LLC 23,805.00 365 0.00 0 0.00 0
2015 ATLAS RESOURCES LLC 20,289.00 365 0.00 0 0.00 0
2016 ATLAS RESOURCES LLC 12,872.00 366 0.00 0 0.00 0
2017 ATLAS RESOURCES LLC 11,551.00 365 0.00 0 0.00 0
2018 DIVERSIFIED OIL & GAS LLC 8,253.00 333 0.00 0 0.00 0
2019 DIVERSIFIED OIL & GAS LLC 7,237.67 304 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 1,220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 1,075.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 ATLAS RESOURCES LLC Produced Fluid 2,014.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 5,395.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 227.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 ATLAS RESOURCES LLC Produced Fluid 698.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 ATLAS RESOURCES LLC Produced Fluid 494.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 ATLAS RESOURCES LLC Produced Fluid 624.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 1,295.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 90.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2010 ATLAS RESOURCES LLC Produced Fluid 372.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 30,629.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 ATLAS RESOURCES LLC Produced Fluid 737.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 ATLAS RESOURCES LLC Produced Fluid 3,788.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011 ATLAS RESOURCES LLC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-24355
2011 ATLAS RESOURCES LLC Produced Fluid 223.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 ATLAS RESOURCES LLC Fracing Fluid Waste 15,467.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 ATLAS RESOURCES LLC Produced Fluid 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 ATLAS RESOURCES LLC Produced Fluid 192.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 ATLAS RESOURCES LLC Produced Fluid 2,184.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 ATLAS RESOURCES LLC Produced Fluid 206.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 ATLAS RESOURCES LLC Produced Fluid 70.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2012 ATLAS RESOURCES LLC Produced Fluid 937.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2012 ATLAS RESOURCES LLC Fracing Fluid Waste 1,320.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ATLAS RESOURCES LLC Produced Fluid 3,706.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ATLAS RESOURCES LLC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 ATLAS RESOURCES LLC Produced Fluid 596.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 ATLAS RESOURCES LLC Produced Fluid 2,095.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ATLAS RESOURCES LLC Produced Fluid 1,746.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ATLAS RESOURCES LLC Produced Fluid 510.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 ATLAS RESOURCES LLC Produced Fluid 311.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 ATLAS RESOURCES LLC Produced Fluid 215.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 ATLAS RESOURCES LLC Produced Fluid 133.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 ATLAS RESOURCES LLC Produced Fluid 614.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 ATLAS RESOURCES LLC Produced Fluid 113.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 ATLAS RESOURCES LLC Produced Fluid 79.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2018 ATLAS RESOURCES LLC Produced Fluid 170.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2018 ATLAS RESOURCES LLC Produced Fluid 297.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 ATLAS RESOURCES LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2019 DIVERSIFIED OIL & GAS LLC Produced Fluid 160.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 DIVERSIFIED OIL & GAS LLC Produced Fluid 195.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 DIVERSIFIED OIL & GAS LLC Produced Fluid 394.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1907835 Primary Facility 2010-07-28 Site Restoration No Violations Noted The Department was at the above referenced Marcellus Well to conduct a restoration extension inspection. Chad Eisman and Nick Stafferri from Atlas were on site during the inspection. The Marcellus well has been drilled and appears to be in production. The Department inspected the E/S controls and they appeared to be in good condition. The pits are in good condition but still contain waste water that needs to be properly disposed. The site needs to be graded, seeded and mulched. The Department approves the 6 month extension.

For data sources see[8]

References