If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-25669 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.925417,"lon":-80.393806,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Gray Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 149565 | |
Farm/Lease Name: WHIPKEY 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-02-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.925417 | |
Longitude: -80.393806 |
Date | Event |
---|---|
2011-02-03 | New Permit Application |
2011-05-16 | Performed Spud Operation |
2011-08-04 | Drilling Completion |
2011-09-08 | Perforation |
2011-09-08 | Performed Stimulation |
2013-04-08 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-09-08 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | RICE DRILLING B LLC | 3,301,261.00 | 324 | 0.00 | 0 | 0.00 | 0 |
2014 | RICE DRILLING B LLC | 1,952,416.00 | 336 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 1,092,314.00 | 286 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 1,319,508.16 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 1,201,606.98 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 958,917.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 878,711.00 | 361 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | RICE DRILLING B LLC | Drill Cuttings | 461.92 Tons | LANDFILL | 100172 |
2011 | RICE DRILLING B LLC | Drilling Fluid Waste | 1,529.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | RICE DRILLING B LLC | Basic Sediment | 1,089.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2013 | RICE DRILLING B LLC | Produced Fluid | 6,503.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | RICE DRILLING B LLC | Produced Fluid | 1,791.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2013 | RICE DRILLING B LLC | Produced Fluid | 479.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2014 | RICE DRILLING B LLC | Produced Fluid | 50.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | RICE DRILLING B LLC | Produced Fluid | 655.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | RICE DRILLING B LLC | Produced Fluid | 655.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2015 | RICE DRILLING B LLC | Fracing Fluid Waste | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Produced Fluid | 2,412.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 8.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Produced Fluid | 275.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | RICE DRILLING B LLC | Produced Fluid | 50.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | RICE DRILLING B LLC | Produced Fluid | 125.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Produced Fluid | 24,068.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 403.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 2.99 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Produced Fluid | 107.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 443.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 2.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 358.63 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 6,262.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Filter Socks | 0.06 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 4.58 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 106.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 2.78 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 169.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 0.05 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 118.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 16.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 274.08 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 284.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 2,272.30 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 39.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 0.05 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 777.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 826.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | RICE DRILLING B LLC | Produced Fluid | 110.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 43.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2018 | RICE DRILLING B LLC | Produced Fluid | 2,302.64 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 110.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Produced Fluid | 370.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2014-4 |
2019 | RICE DRILLING B LLC | Produced Fluid | 36.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 62.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 2,212.10 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 89.19 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 648.10 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 98.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2006743 | Primary Facility | 2011-09-29 | Drilling/Alteration | No Violations Noted | Well fraced ; Location E&S ok. containment around well good; No signage at location |
2117881 | Primary Facility | 2012-11-20 | Routine/Complete Inspection | No Violations Noted | ROUTINE INSPECTION. SITE COMPLIANT AT TIME OF INSPECTION. |
2145135 | Primary Facility | 2013-02-25 | Routine/Complete Inspection | No Violations Noted | ROUTINE INSPECTION. WELL COMPLIANT AT TIME OF INSPECTION. |
2273657 | Primary Facility | 2014-05-20 | Routine/Complete Inspection | No Violations Noted | ROUTINE INSPECTION. RICE REPORTED THEY HAD GAS COMING TO SURFACE BETWEEN THERE 5 1/2 PRODUCTION CASING AND 9 5/8 INTERMEDIATE CASING. INSPECTED WELL TO MAKE SURE THERE WAS NO GAS TO ATMOSPHERE. RICE REPORTED THAT EVERY COUPLE WEEKS WELL WILL BUILD PRESSURE ON THE BACKSIDE OF PRODUTION CASING AND THEY RELEASE THE GAS INTO A PRODUCTION TANK TO CAPTURE AND CONDENSATE. RICE IS SUBMITTING A PLAN TO THE DEPARTMENT FOR REVIEW ON HOW THEY WOULD LIKE TO SEAL THE 2 CASING STRINGS OFF FROM EACH OTHER. |
2470533 | Primary Facility | 2016-03-16 | Routine/Complete Inspection | No Violations Noted | Well drilled to completion and capable of production. |
2698159 | Primary Facility | 2018-02-26 | Routine/Complete Inspection | No Violations Noted | The well is properly identified and equipped for production. Two 400 bbl production tanks on site in containment. One GPU on site. |
2817235 | Primary Facility | 2018-12-12 | Routine/Complete Inspection | No Violations Noted | On December 12, 2018, the Department performed an inspection of the EQT/Rice Energy Whipkey well pad site. Present at time of inspection was Jamie Davis (EQT). The site is located in Gray Twp., Greene Co. The inspection was related to a request by the operator for a pre-operational inspection of the site prior to new drilling operations on the site.
The site was original permitted by Rice Energy with an ESCGP1 permit. The site has been transferred to EQT and has been re-permitted as an ESCGP2 permit. The operator now plans to drill new wells at the site, and has requested a pre-operational inspection for the new wells. Rice Energy completed one well the 1H well, and set the conductor for a second well the 2H well. The 1H well is equipped for production, and the 2H well cellar has been covered with a steel plate. EQT is waiting for the issuance of the new well permits, at time of inspection. The well pad, and access road are in good condition. The site is stable with greater than 70% perennial, vege |
2824334 | Primary Facility | 2019-01-09 | Routine/Complete Inspection | No Violations Noted | The well is equipped for production and is producing. The operator is currently drilling on site. |
For data sources see[8]