X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25670

Well Details

Well ID: 37-059-25670
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Franklin Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148450
Farm/Lease Name: GROOMS UNIT 5H
License Status:
Spud Date:
Permit Date: 2011-02-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.922006
Longitude: -80.218442

For data sources see[1][2][3]

Well History

Date Event
2011-02-14 New Permit Application
2011-08-29 Performed Spud Operation
2012-02-05 Drilling Completion
2012-10-14 Perforation
2012-10-14 Performed Stimulation
2013-08-13 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-10-14 2012-10-14 7,052 4,906,047

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.30
WG-36 GELLING AGENT Halliburton Energy Services Water Viscosifier Guar gum 9000-30-0 100.00 0.00326000
Proppant (lbs) Proppant 8.34 9.17
EC6486A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00744000
Clean Volume (gals) Carrier/Base Fluid 91.66 100.00
Biocide EC 6116A Nalco Biocide Polyethylene glycol 25322-68-3 60.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00753000
Dibromoacetonitrile 3252-43-5 5.00 0.00125000
ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00
EC6673W Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00698000
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Hemicellulase enzyme 9012-54-8 15.00 0.00002000
Carbohydrates 95.00 0.00010000

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-10-14 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 1,655,418.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 821,978.00 357 0.00 0 133.76 176
2015 CHEVRON APPALACHIA LLC 535,899.00 334 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 468,880.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 378,809.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 324,638.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 270,183.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 7,765.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,120.10 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,388.98 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 3,350.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 5,065.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 102.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 27.71 Tons LANDFILL 073 114 654
2013 CHEVRON APPALACHIA LLC Produced Fluid 31,457.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 736.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 1,045.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,193.38 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 23.75 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 2.22 Tons LANDFILL 100172
2014 CHEVRON APPALACHIA LLC Produced Fluid 390.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 1,589.75 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,298.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 444.13 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 756.57 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Soil Contaminated by Oil 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 CHEVRON APPALACHIA LLC Produced Fluid 15.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017 CHEVRON APPALACHIA LLC Produced Fluid 136.13 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 CHEVRON APPALACHIA LLC Produced Fluid 210.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 13.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Produced Fluid 55.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,992.51 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 94.00 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 40.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Produced Fluid 285.40 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 31.25 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 290.00 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2001324 Primary Facility 2011-05-31 Routine/Complete Inspection No Violations Noted
2006278 Primary Facility 2011-09-21 Drilling/Alteration No Violations Noted CODUCTOR SET. DRILLING GETTING STARTED.
2014177 Primary Facility 2011-10-18 Routine/Complete Inspection No Violations Noted
2027540 Primary Facility 2011-09-13 Routine/Complete Inspection No Violations Noted The Department was at the above referenced Marcellus Well to conduct a Routine Inspection. The operator is finishing up construction of the pad and lining the pits. The Department reviewed the E/S Plan on site. The E/S controls appear to be in good condition. The Operator is currently adding E/S controls to make sure all the sediment stays on site. Temporary stabilization has been obtained on this site. Grass is beginning to grow on the fill slopes.
2035027 Primary Facility 2012-01-09 Drilling/Alteration No Violations Noted WELL DRILLED TO KOP. SITE AND E&S OK.
2043012 Primary Facility 2012-02-03 Routine/Complete Inspection No Violations Noted 24" @ 63'; 16' @ 530'; 11 3/4"@ 1162 (NO COAL MINE);8 5/8"@ 2835'; Patterson Rig 334 drilling @ 7053'; Last well to be drilled on 8 well pad
2051407 Primary Facility 2012-03-13 Drilling/Alteration No Violations Noted Drilling complete TD 12548' 5 1/2 production string.
2051459 Primary Facility 2012-03-13 Drilling/Alteration No Violations Noted
2449060 Primary Facility 2016-01-09 Routine/Partial Inspection Violation(s) Noted On 01/09/16 at approximately 0800 hours I conducted a routine partial inspection of the Grooms Unit. The Act 9 sign was in place and all required documents were present at the site. I met with Nick Staffieri of Chevron to discuss changes at the site.

One of the forebays on the site (#3) was moved within the same drainage area as proposed, but without Departmental approval. This is a violation of 102.5(m)(4). It is recommended that Chevron submit for a minor modification to reflect current conditions at the site.

2636952 Primary Facility 2017-09-15 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal by Chevron. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and meets and exceeds 70% uniform vegetative cover. There were no signs of erosion observed at the time of inspection. The production equipment appeared to be in good condition. The site meets the requirements for permit termination. The NOT is approved.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2449060 745772 2016-01-09 2017-09-15 102.5(m)4 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
745772 334537 NOV - Notice of Violation 2018-12-12
745772 370324 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-12-12 2018-12-12 $29,000.00 $29,000.00

For data sources see[9]

References