Well Details

Well ID: 37-059-26341
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Dunkard Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 150623
Farm/Lease Name: PBG-SMITH UNIT 5H
License Status: Active
Spud Date: 2014-08-15
Permit Date: 2013-12-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.794822
Longitude: -80.054569

For data sources see[1][2][3]

Well History

Date Event
2013-12-17 New Permit Application
2014-08-16 Performed Spud Operation
2014-12-15 New Permit Application
2015-06-12 Drilling Completion
2020-01-22 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-12 2016-03-16 0 9,976,960 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Proppant Transport Schlumberger Corrosion Inhibitor, Scale Inhibitor, AntiFoam Agent, Acid, Breaker, Gelling Agent, Friction Reducer, Iron Control Agent, Myacide|TS GA 25, Accelerato Dodecamethylcyclohexasiloxane 540-97-6 0.00001000 0 0
Sodium sulfate 7757-82-6 0.00265 0.0003 0
Methanol 67-56-1 0.00325 0.00037 0
Potassium chloride (impurity) 7447-40-7 0.00039 0.00004000 0
Sodium erythorbate 6381-77-7 0.00554 0.00063 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0.07483 0.00849 0
Sodium hydroxide 1310-73-2 0.00201 0.00023 0
Water (Including Mix Water Supplied by Client)* NA 0 88.6509 0
Glutaraldehyde 111-30-8 0.12243 0.01389 0
Ammonium sulfate 7783-20-2 0.2343 0.02659 0
Polypropylene glycol 25322-69-4 0.00763 0.00087 0
Trisodium ortho phosphate 7601-54-9 0.00889 0.00101 0
Decamethyl cyclopentasiloxane 541-02-6 0.00001000 0 0
Alcohol, C9-C11, Ethoxylated 68439-46-3 0.00056 0.00006000 0
Dimethyl siloxanes and silicones 63148-62-9 0.00016 0.00002000 0
Reaction product of: acetophenone,
formaldehyde, cyclohexylamine,
methanol and acetic acid
224635-63-6 0.00134 0.00015 0
Quartz, Crystalline silica 14808-60-7 98.4915 11.1779 0
Copper(II) sulfate 7758-98-7 0.00001000 0 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer
38193-60-1 0.17293 0.01963 0
Trisodium Ethylenediaminetetraacetate (impurity) 150-38-9 0.00201 0.00023 0
Disodium Ethylene Diamine Tetra Acetate (impurity) 139-33-3 0.00201 0.00023 0
Trisodium nitrilotriacetate (impurity) 5064-31-3 0.00101 0.00011 0
Ethylene Glycol 107-21-1 0.00253 0.00029 0
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate
136793-29-8 0.01853 0.0021 0
Calcium Chloride 10043-52-4 0.01337 0.00152 0
Cinnamaldehyde 104-55-2 0.00075 0.00008000 0
Hydrochloric acid 7647-01-0 0.63511 0.07208 0
Sodium chloride (impurity) 7647-14-5 0.00021 0.00002000 0
Hemicellulase enzyme 9012-54-8 0.00345 0.00039 0
Sodium Glycolate (impurity) 2836-32-0 0.00604 0.00069 0
Non-crystalline silica (impurity) 7631-86-9 0.00274 0.00031 0
Acetophenone 98-86-2 0.00014 0.00002000 0
Guar gum 9000-30-0 0.14936 0.01695 0
Octamethylcyclotetrasiloxane 556-67-2 0.00002000 0 0
Acetic acid(impurity) 64-19-7 0.00014 0.00002000 0
Amines, tallow alkyl, ethoxylated 61791-26-2 0.00011 0.00001000 0
Urea 57-13-6 0.01137 0.00129 0
Alcohols, C10-16, ethoxylated 68002-97-1 0.00037 0.00004000 0
2-Propenamid (impurity) 79-06-1 0.00057 0.00006000 0
Siloxanes and silicones, dimethyl,
reaction products with silica
67762-90-7 0.00002000 0 0
Formaldehyde (impurity) 50-00-0 0.00009000 0.00001000 0
Ethanol, 2,2',2-nitrilotris-,
1,1',1
-tris(dihydrogen phosphate), sodium salt
68171-29-9 0.02022 0.00229 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 179,574.00 49 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 1,438,539.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 959,497.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 751,783.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHEVRON APPALACHIA LLC Drill Cuttings 211.97 Tons LANDFILL 100419
2014 CHEVRON APPALACHIA LLC Drill Cuttings 128.09 Tons LANDFILL 100172
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 20.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Drilling Fluid Waste 62.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Drill Cuttings 40.26 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Drilling Fluid Waste 208.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Drill Cuttings 754.12 Tons LANDFILL 100419
2015 CHEVRON APPALACHIA LLC Drill Cuttings 175.34 Tons LANDFILL 100172
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 147.82 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 8,983.45 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 24.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2016 CHEVRON APPALACHIA LLC Produced Fluid 3,655.20 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Drilling Fluid Waste 28.50 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2016 CHEVRON APPALACHIA LLC Waste Water Treatment Sludge 33.88 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 154.51 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 344.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 CHEVRON APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 CHEVRON APPALACHIA LLC Drilling Fluid Waste 62.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 CHEVRON APPALACHIA LLC Synthetic Liner Materials 3.69 Tons LANDFILL 100172
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 71.53 Bbl LANDFILL 100172
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 1,094.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 CHEVRON APPALACHIA LLC Drilling Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 CHEVRON APPALACHIA LLC Synthetic Liner Materials 2.15 Tons LANDFILL 100663
2017 CHEVRON APPALACHIA LLC Produced Fluid 360.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 57.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017 CHEVRON APPALACHIA LLC Produced Fluid 6,021.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CHEVRON APPALACHIA LLC Produced Fluid 3,214.50 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid 417.69 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 CHEVRON APPALACHIA LLC Soil Contaminated by Oil 0.08 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 CHEVRON APPALACHIA LLC Produced Fluid 59.77 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,256.69 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 0.08 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 CHEVRON APPALACHIA LLC Produced Fluid 44.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Produced Fluid 6,769.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 319.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Produced Fluid 68.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 2,146.30 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 507.90 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 732.50 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 63.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 12.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CHEVRON APPALACHIA LLC Produced Fluid 97.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2295601 Primary Facility 2014-08-14 Drilling/Alteration No Violations Noted 26" conductor set @ 40' and cemented in place
2304822 Primary Facility 2014-09-09 Drilling/Alteration No Violations Noted CONDUCTOR SET. NO RIG ON SITE.
2318341 Primary Facility 2014-10-02 Drilling/Alteration No Violations Noted Spud 10/2/14; Drilling @ 131 ft.
2318359 Primary Facility 2014-10-08 Drilling/Alteration No Violations Noted Drilled to 496' ; set 20"@ 494'; cement with returns to surface; On 10/5 drilled to 961'; set 13 3/8"@ 959';; basket @ 721' Pgh coal 892-900; Sewickley Coal@ 780-786; solid for both; cemented with 30 bbls of cement returns;
2347071 Primary Facility 2015-01-14 Routine/Complete Inspection No Violations Noted Well drilled to TD. Well waiting to be fracked.
2373115 Primary Facility 2015-05-27 Routine/Partial Inspection No Violations Noted
2373867 Primary Facility 2015-03-31 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Pace drilling on air @ 2435' ( TD ). Running Intermediate Casing and cementing tonight 3/29/2015).
2380228 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted On 06/04/15 at approximately 1100 hours I conducted a routine complete inspection of the PBG Smith site. The Act 9 sign and all required documents were present at the site. The sides of the access road were well vegetated with few bare spots. The site was stabilized. The Nabors Drilling Rig #X07 was on site. There were no violations noted at the time of inspection.
2401961 Primary Facility 2015-06-15 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Drilling on fluid @ 15,531' (TD). Runnimg 51/2" Prod. Casing and cementing tonight (6/12/2015).
2444286 Primary Facility 2015-01-15 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Fracing crew starting stimulation of wells.
2453643 Primary Facility 2015-12-31 Routine/Complete Inspection No Violations Noted
2463026 Primary Facility 2016-03-08 Routine/Complete Inspection No Violations Noted On 03/08/16 at approximately 0830 I conducted an incident response inspection of the PBG Smith Unit. On 03/07/16 a spill of approximately 120 barrels of frack fluid occurred. The spill was reported as contained on secondary containment.

The Act 9 sign was in place and all required documents were present in the mailbox. The wells on site are currently being fracked. The containment appeared to be sound and appeared capable of containing the volume of fluid reported as released, due to a high berm on the edge of the containment. There were no signs that any fluid left containment. It is recommended that the area be inspected after containment is removed to verify that no fluid was outside of containment.

2467435 Primary Facility 2016-03-24 Administrative/File Review No Violations Noted

On 03/24/16 at approximately 1050 hours I conducted an administrative inspection in response to a spill at the Chevron PBG Smith well site.

On 01/18/16 at approximately 0930 hours friction reducer was being circulated and a hose became disconnected allowing approximately 130 gallons of friction reducer to be spilled to containment. Operations were immediately shut down to prevent the additional release of fluid. The area was cleaned up in compliance with DEP spill policy.

2479459 Primary Facility 2016-04-14 Incident- Response to Accident or Event No Violations Noted

On 04/14/16 at approximately 0830 hours I conducted an incident response inspection in response to a spill that occurred on 04/13/16. The Act 9 sign was in place and all required documents were present at the site.

On 04/13/16 a spill of 2/3 freshwater and 1/3 reuse water occurred. Approximately 55 barrels were recovered from containment. Chevron discovered that fluid leaked to the ground surface through a bad seam approximately 8” up the containment berm. After the fluid was recovered from the pad surface the faulty seam was repaired. The spill area off containment was excavated and the material placed on a liner and covered to prevent rain infiltration. Confirmatory samples were taken after excavation occurred. The spill volume to the ground was calculated at 30 gallons.

2487720 Primary Facility 2016-05-25 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Fracing completed ,Rig moving on wells to drill out plugs and run tubing in well.
2507829 Primary Facility 2016-06-06 Routine/Complete Inspection No Violations Noted

On 06/06/16 at approximately 0900 hours I conducted a CEI in response to an NOV issued to Chevron Appalachia LLC for a discharge of approximately 30 gallons of brine fluid that passed through a bad seam in the containment and contacted the ground.

The Act 9 sign was in place and all required documents were present in the mail box. The location of the spill had been excavated, filled, seeded, and mulched. Vegetation had begun to grow in the disturbed area. There were no signs of additional spills or discharges at the time of inspection. There were no violations observed.

2525314 Primary Facility 2016-09-22 Routine/Complete Inspection No Violations Noted On 09/22/16 at approximately 0900 hours I conducted a routine complete inspection of the PBG Smith Unit. The Act 9 sign was in place and all required documents were present at the site. The site was well stabilized and there were no signs of erosion observed at the time of inspection. There were no violations observed at the time of inspection.
2549857 Primary Facility 2016-12-08 Routine/Complete Inspection No Violations Noted On 12/08/16 at approximately 1100 hours I conducted a routine complete inspection of the PBG Smith Unit. The Act 9 sign was in place and all required documents were present at the site. The site was well stabilized and there were no signs of erosion observed at the time of inspection. It appeared that the AST equipment was being removed at the time of inspection. There were no violations observed at the time of inspection.
2567847 Primary Facility 2017-03-06 Routine/Complete Inspection No Violations Noted The Act 9 sign and all required documents were present at the site. The equipment appeared to be in good condition. The site was well vegetated and there were no signs of erosion observed. There were no violations observed at the time of inspection.
2606080 Primary Facility 2017-06-21 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2608786 Primary Facility 2017-06-21 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2623533 Primary Facility 2017-08-07 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2663893 Primary Facility 2017-11-16 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The AST pad appeared to have been recently restored. Some tire tracks were observed off the access road in the restored area. Aside from the tracks, the restored area and the rest of the site appeared to be well vegetated. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2683497 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted Well appears to be producing. Fencing Co. installing fence around storm water basin.
2738472 Primary Facility 2018-06-04 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required were present at the site. The production equipment appeared to be in good condition. The site overall was well vegetated. Perimeter BMPs had been removed and the area seeded and mulched. A small area off the southwest edge of the pad exhibited thin vegetation. It is recommended the area be seeded and mulched. A minor erosion rill was observed off the southwest edge of the pad in the direction of the basin. It is recommended the area be addressed, seeded, and mulched.
2752505 Primary Facility 2018-07-17 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. A small erosion rill noted in previous inspections had been repaired. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2798616 Primary Facility 2018-10-18 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from Chevron. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and exceeded uniform 70% vegetative cover. There were no signs of erosion observed. PCSM features were installed and appeared to be functioning. The NOT is approved.

For data sources see[8]

References