X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26357

Well Details

Well ID: 37-059-26357
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 150676
Farm/Lease Name: ALPHA 1 592152
License Status:
Spud Date:
Permit Date: 2014-01-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.942433
Longitude: -80.130736

For data sources see[1][2][3]

Well History

Date Event
2014-01-09 New Permit Application
2014-04-30 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-20 2015-03-10 7,789 16,137,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Keane Group Carrier/Base Fluid Water 7732-18-5 100 90.5357 134,667,000.0
AI 600 Keane Group Corrosion Inhibitor Cinnamiaidehyde 104-55-2 10 0.00005343 79.469
N, N-Dimethyiformamide 68-12-2 40 0.000213708 317.878
Ethylene Glycol 107-21-1 60 0.000320561 476.817
Triethyl Phosphate 78-40-0 7 0.00003740 55.629
Isopropyl alcohol 67-63-0 7 0.00003740 55.629
Ethoxylated Nonylphenol 68412-54-4 10 0.00005343 79.469
2-Butoxyenthanol 111-76-2 7 0.00003740 55.629
Tar bases, quinoline derivs, benzyl chloride-quatemized 72480-70-7 13 0.00006946 103.31
Chlorine dioxide solution - SVP - Pure Neptune Disinfectant/oxidizer Chlorine dioxide 10049-04-4 0.3 0.00000501 7.456
LEB-10X Keane Group Gel Breaker Ethylene Glycol 107-21-1 30 0.000123687 183.977
Nalco EC6111A Keane Group Biocide Non-hazardous substances Proprietary 100 0.00929694 13828.7
Glutaraldehyde 111-30-8 30 0.00278908 4148.6
Buffer 1 Keane Group High pH buffering agents Potassium carbonate 584-08-7 50 0.0180653 26871
Hydrochloric Acid (15%) Keane Group Acidizing Hydrochloric Acid 7647-01-0 15 0.0320286 47640.7
SL 1014 / 1072 Keane Group Friction reducer Distillates (petroleum), hydrotreated light 64742-47-8 25 0.0187431 27879.3
Nalco EC6330A Keane Group Scale inhibitor Ethylene glycol 107-21-1 5 0.00113561 1689.16
Sodium phosphate, tribasic 7601-54-9 5 0.00113561 1689.16
Sand (Proppant) Keane Group Proppant Silica Substrate 14808-60-7 100 9.105 13,543,200.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 EQT PROD CO 0.00 0 0.00 0 0.00 0
2015 EQT PROD CO 1,584,998.00 166 0.00 0 0.00 0
2016 EQT PROD CO 1,837,113.00 366 0.00 0 0.00 0
2017 EQT PROD CO 905,660.00 344 0.00 0 0.00 0
2018 EQT PROD CO 730,100.00 365 0.00 0 0.00 0
2019 EQT PROD CO 577,253.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 EQT PROD CO Drill Cuttings 1,173.05 Tons LANDFILL 100419
2014 EQT PROD CO Drilling Fluid Waste 1,545.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Fracing Fluid Waste 3,275.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Drilling Fluid Waste 50.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Fracing Fluid Waste 770.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Produced Fluid 1,320.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Fracturing Fluid Waste 9.01 Tons LANDFILL 100277
2015 EQT PROD CO Fracing Fluid Waste 5,416.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 29,720.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Drilling Fluid Waste 630.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 520.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Produced Fluid 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 EQT PROD CO Produced Fluid 210.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 EQT PROD CO Produced Fluid 320.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 17,410.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 460.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Other Oil & Gas Wastes 220.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 EQT PROD CO Produced Fluid 3,385.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 20.86 Bbl INJECTION DISPOSAL WELL 34-009-23823
2018 EQT PROD CO Other Oil & Gas Wastes 143.34 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 7.32 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2018 EQT PROD CO Produced Fluid 955.24 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Synthetic Liner Materials 18.37 Tons LANDFILL 100277
2018 EQT PROD CO Produced Fluid 16.05 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 150.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 22.65 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 EQT PROD CO Other Oil & Gas Wastes 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Filter Socks 0.23 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 EQT PROD CO Produced Fluid 37.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 363.92 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 58.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 889.13 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 104.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2268999 Primary Facility 2014-05-08 Drilling/Alteration No Violations Noted 26" conductor casing set at 22'; Alpha Rig 5 commenced drilling on 5/8/14; drilling at 275'; walked pad with company man John Henline; all containment in place; no rig issues;
2270887 Primary Facility 2014-05-13 Drilling/Alteration No Violations Noted on 5/9 drilled to 543'; set and cemented 13 3/8"casing; balance job with cement on backside at surface; Drilled to 3260' and set 9 5/8" casing to 3212'; cemented back to surface; wait on cement; running cement bond log through storage zone;
2295612 Primary Facility 2014-08-05 Drilling/Alteration No Violations Noted Pioneer Rig 70 spud lateral on 8/1/14; Drilling @ 12,350'; BOP tests good; Initially drilled from 6606 to 7125KOP; Walked location with CoMan Jack Chamberlain; no drilling or containment issues;
2296892 Primary Facility 2014-08-08 Drilling/Alteration No Violations Noted Pioneer Rig 70 TD well @ 16,188'; KOP@ 7145'; Circulating and preparing to trip out drill string;
2338557 Primary Facility 2014-11-03 Routine/Complete Inspection No Violations Noted Well drilled to completion. Well waiting to be fracked.
2376897 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted On 6/4/15, I inspected the Alpha 1 Pad as routine inspection and made the following observations:
2398872 Primary Facility 2015-07-28 Incident- Response to Accident or Event No Violations Noted On 7/28/15, I inspected the Alpha 1 site in response to an operator reported spill and made the following observations:
2399485 Primary Facility 2015-08-06 Follow-up Inspection No Violations Noted On 8/6/15, I performed a follow up inspection on the Alpha 1 site meeting with EQT representative Corey Giles to gather further information about a production fluid spill that occurred and was reported on 7/27/15:
2448362 Primary Facility 2016-02-04 Administrative/File Review No Violations Noted An administrative compliance evaluation inspection in response to the 8/6/15 Alpha 1 NOV indicates that as of 2/4/16 the situation is ready to be forwarded to the Environmental Cleanup Board. The dispensation of the site is as follows:

• On 7/27/15 EQT’s Corey Giles reported that “the containment for the sand tank accumulated 5,300 gallons of produced fluid. The containment overflowed releasing an additional 3-4 barrels to the pad surface.” • Administrative review of the initial clean up report and NOV response left some questions and issues unresolved. • An update to the initial response reviewed by DEP Kevin Maskol resolves all issues preventing the situation being taken over by ECB.

2532581 Primary Facility 2016-10-14 Routine/Complete Inspection No Violations Noted On 10/14/16 at approximately 1130 hours I conducted a routine complete inspection of the Alpha 1 pad. The Act 9 sign was in place and all required documents were present at the site. A drawing found in the mailbox (see photographs) roughly matched the site as constructed. According to Department records, this plan was not approved, nor were the changes made to the site.

Multiple violations of 102.5(m)(4) 102.5(c) were observed at the time of inspection and are listed below:

-The road to the south of the well pad was not constructed in the approved location -The gravel area to the south of the well pad was not constructed as approved and an increase in impervious area has resulted. -The location approved as an impoundment was constructed as an AST pad and is a significant increase in impervious area.

The area between the well pad, gravel pad to the south, and the location that was approved as an impoundment contained a large volume of water. The constructed features in this area are effectively working as

For data sources see[8]

References