X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26416

Well Details

Well ID: 37-059-26416
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Center Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 151088
Farm/Lease Name: MELZER
License Status: Active
Spud Date: 2014-11-15
Permit Date: 2014-03-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.884194
Longitude: -80.365269

For data sources see[1][2][3]

Well History

Date Event
2014-03-03 New Permit Application
2014-11-15 Performed Spud Operation
2015-01-17 Drilling Completion
2015-03-24 Permit Renewal Application
2015-04-26 Drilling Completion
2016-05-12 Perforation
2016-05-23 Performed Stage 1 of Stimulation
2016-05-28 Perforation
2016-05-31 Perforation
2016-05-31 Performed Stage 2 of Stimulation
2016-06-01 Perforation
2016-06-01 Performed Stage 3 of Stimulation
2016-06-01 Performed Stage 4 of Stimulation
2016-06-02 Perforation
2016-06-06 Perforation
2016-06-06 Performed Stage 5 of Stimulation
2016-06-07 Perforation
2016-06-07 Performed Stage 6 of Stimulation
2016-06-17 Performed Stage 7 of Stimulation
2016-06-18 Perforation
2016-06-18 Performed Stage 8 of Stimulation
2016-06-19 Perforation
2016-06-19 Performed Stage 9 of Stimulation
2016-06-20 Perforation
2016-06-20 Performed Stage 10 of Stimulation
2016-06-20 Performed Stage 11 of Stimulation
2016-06-21 Perforation
2016-06-21 Performed Stage 12 of Stimulation
2016-06-22 Perforation
2016-06-22 Performed Stage 13 of Stimulation
2016-06-22 Performed Stage 14 of Stimulation
2016-06-23 Perforation
2016-06-23 Performed Stage 15 of Stimulation
2016-06-24 Perforation
2016-06-24 Performed Stage 16 of Stimulation
2016-06-25 Perforation
2016-06-25 Performed Stage 17 of Stimulation
2016-06-25 Performed Stage 18 of Stimulation
2016-06-26 Perforation
2016-06-26 Performed Stage 19 of Stimulation
2016-06-27 Perforation
2016-06-27 Performed Stage 20 of Stimulation
2016-06-27 Performed Stage 21 of Stimulation
2016-06-28 Perforation
2016-06-28 Performed Stage 22 of Stimulation
2016-06-29 Perforation
2016-06-29 Performed Stage 23 of Stimulation
2016-06-30 Perforation
2016-06-30 Performed Stage 24 of Stimulation
2016-06-30 Performed Stage 25 of Stimulation
2016-07-01 Perforation
2016-07-01 Performed Stage 26 of Stimulation
2016-07-01 Performed Stage 27 of Stimulation
2016-07-02 Perforation
2016-07-02 Performed Stage 28 of Stimulation
2016-07-02 Performed Stage 29 of Stimulation
2016-07-03 Perforation
2016-07-03 Performed Stage 30 of Stimulation
2016-07-03 Performed Stage 31 of Stimulation
2016-07-04 Perforation
2016-07-04 Performed Stage 32 of Stimulation
2016-07-04 Performed Stage 33 of Stimulation
2016-07-05 Perforation
2016-07-05 Performed Stage 34 of Stimulation
2016-07-05 Performed Stage 35 of Stimulation
2016-07-07 Perforation
2016-07-07 Performed Stage 36 of Stimulation
2016-07-08 Perforation
2016-07-08 Performed Stage 37 of Stimulation
2016-07-09 Perforation
2016-07-09 Performed Stage 38 of Stimulation
2016-07-09 Performed Stage 39 of Stimulation
2016-07-10 Performed Stage 40 of Stimulation
2018-12-26 Deviated
2018-12-26 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-05-23 2016-07-10 7,883 16,496,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
Sand (Proppant), Hydrochloric Acid(5%),
Unihib G, Unislick CST
UWS Proppant, Acidizing, Acid Inhibitor, Friction Reducer Methanol 67-56-1 5 0.00000618 10.089
Thiourea 62-56-6 1 0.00000124 2.018
Ethoxylated alcohol 68002-97-1 35 0.00004328 70.624
Petroleum Distillate 64742-47-8 20 0.00007606 124.124
Hydrochloric Acid 7647-01-0 5 0.0310995 50749.9
Acetophenone 98-86-2 1 0.00000124 2.018
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00000761 12.412
Short chained glycol ether 112-34-5 60 0.00007419 121.069
copolymer of 2-propenamide 69418-26-4 30 0.000114094 186.185
Water 7732-18-5 45 0.000171141 279.278
Oleic Acid Diethanolamide 93-83-4 2 0.00000761 12.412
Ammonium chloride ((NH4)Cl) 12125-02-9 1 0.00000380 6.206
Formaldehyde 50-00-0 1 0.00000124 2.018
Silica 14808-60-7 99.9 14.2875 23,315,200.0
LD-2250, LD-2550, MC B-8614, MC S2510-T Multi-Chem Friction Reducer, Non Imulsifier, Biocide, Scale Inhibitor Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5 0.00108707 1773.95
Sodium chloride 7647-14-5 5 0.0030688 5007.84
Ethylene glycol 107-21-1 60 0.00568737 9280.98
Hydrotreated light petroleum distillate 64742-47-8 30 0.0184128 30047
Fatty nitrogen derived amides Proprietary 5 0.0030688 5007.84
Glutaraldehyde 111-30-8 30 0.00652244 10643.7
Sodium Chloride 7647-14-5 10 0.00218214 3560.95
Ethoxylated alcohol Proprietary 5 0.0030688 5007.84
Inner salt of alkyl amines Proprietary 60 0.0130929 21365.7
Polyacrylate Proprietary 30 0.0184128 30047
Water Consol Carrier/Base Fluid Water 7732-18-5 100 84.9586 138,640,000.0
Ferrotrol 300L, CI-14 Baker Hughes Iron Control, Corrosion Inhibitor Polyoxyalkylenes Proprietary 20 0.00003203 52.273
Propargyl alcohol 107-19-7 5 0.00000801 13.068
Methanol 67-56-1 70 0.000112115 182.956
Fatty acids Proprietary 10 0.00001602 26.137
Citric Acid 77-92-9 50 0.000347944 567.794
Olefin Proprietary 5 0.00000801 13.068
ECM FR NI 200, ECM Surf 200 ECM Friction Reducer, Surfactant Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00002543 41.498
Copolymer of Two Propenamide 69418-26-4 30 0.000381449 622.47
Petroleum Distillate 64742-47-8 20 0.000254299 414.98
Ammonium chloride ((NH4)Cl) 12125-02-9 1 0.00001271 20.749
Oleic Acid Diethanolamide 93-83-4 2 0.00002543 41.498
Diethylene glycol monobutyl ether 112-34-5 30 0.000156176 254.856
Water 7732-18-5 50 0.000635749 1037.45

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-05-23 1 Ottawa Sand 16,496,359 9,742 10,409
2016-05-31 2 Ottawa Sand 16,496,359 9,775 10,317
2016-06-01 3 Ottawa Sand 16,496,359 9,749 10,194
2016-06-01 4 Ottawa Sand 16,496,359 9,130 10,312
2016-06-06 5 Ottawa Sand 16,496,359 9,615 10,089
2016-06-07 6 Ottawa Sand 16,496,359 9,321 10,210
2016-06-17 7 Ottawa Sand 16,496,359 9,529 10,119
2016-06-18 8 Ottawa Sand 16,496,359 9,244 9,928
2016-06-19 9 Ottawa Sand 16,496,359 9,520 10,029
2016-06-20 10 Ottawa Sand 16,496,359 9,386 9,817
2016-06-20 11 Ottawa Sand 16,496,359 9,353 9,782
2016-06-21 12 Ottawa Sand 16,496,359 9,425 9,833
2016-06-22 13 Ottawa Sand 16,496,359 9,346 9,727
2016-06-22 14 Ottawa Sand 16,496,359 9,208 9,709
2016-06-23 15 Ottawa Sand 16,496,359 9,259 9,910
2016-06-24 16 Ottawa Sand 16,496,359 9,435 9,865
2016-06-25 17 Ottawa Sand 16,496,359 9,031 9,404
2016-06-25 18 Ottawa Sand 16,496,359 9,495 9,742
2016-06-26 19 Ottawa Sand 16,496,359 9,527 9,697
2016-06-27 20 Ottawa Sand 16,496,359 9,569 10,034
2016-06-27 21 Ottawa Sand 16,496,359 9,225 9,645
2016-06-28 22 Ottawa Sand 16,496,359 9,567 10,042
2016-06-29 23 Ottawa Sand 16,496,359 9,518 9,974
2016-06-30 24 Ottawa Sand 16,496,359 9,524 9,934
2016-06-30 25 Ottawa Sand 16,496,359 9,461 9,751
2016-07-01 26 Ottawa Sand 16,496,359 9,500 9,978
2016-07-01 27 Ottawa Sand 16,496,359 9,421 9,913
2016-07-02 28 Ottawa Sand 16,496,359 9,406 9,692
2016-07-02 29 Ottawa Sand 16,496,359 9,429 9,831
2016-07-03 30 Ottawa Sand 16,496,359 9,449 10,000
2016-07-03 31 Ottawa Sand 16,496,359 9,393 9,802
2016-07-04 32 Ottawa Sand 16,496,359 9,520 10,107
2016-07-04 33 Ottawa Sand 16,496,359 9,294 9,824
2016-07-05 34 Ottawa Sand 16,496,359 9,424 9,850
2016-07-05 35 Ottawa Sand 16,496,359 9,246 10,007
2016-07-07 36 Ottawa Sand 16,496,359 8,894 9,785
2016-07-08 37 Ottawa Sand 16,496,359 9,352 9,722
2016-07-09 38 Ottawa Sand 16,496,359 9,290 10,050
2016-07-09 39 Ottawa Sand 16,496,359 9,197 9,806
2016-07-10 40 Ottawa Sand 16,496,359 8,603 10,248

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2015 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2016 CNX GAS CO LLC 1,075,473.13 83 0.00 0 0.00 0
2017 CNX GAS CO LLC 3,720,403.25 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 1,633,422.47 365 0.00 0 0.00 0
2019 CNX GAS CO LLC 813,942.39 236 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CNX GAS CO LLC Drill Cuttings 13.45 Tons LANDFILL 100172
2014 CNX GAS CO LLC Drilling Fluid Waste 980.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Drilling Fluid Waste 781.75 Bbl LANDFILL 301071
2015 CNX GAS CO LLC Drilling Fluid Waste 945.43 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CNX GAS CO LLC Drill Cuttings 28.01 Tons LANDFILL 100663
2015 CNX GAS CO LLC Drill Cuttings 228.35 Tons LANDFILL PAD059087072
2015 CNX GAS CO LLC Drill Cuttings 183.98 Tons LANDFILL 06-08438
2015 CNX GAS CO LLC Drilling Fluid Waste 1,028.73 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2015 CNX GAS CO LLC Drill Cuttings 694.57 Tons LANDFILL 100172
2016 CNX GAS CO LLC Produced Fluid 67,719.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 63.00 Bbl INJECTION DISPOSAL WELL 34-119-28780
2016 CNX GAS CO LLC Produced Fluid 19.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 11.53 Bbl INJECTION DISPOSAL WELL 34-119-28780
2017 CNX GAS CO LLC Produced Fluid 52.67 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 4,599.80 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Produced Fluid 484.17 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CNX GAS CO LLC Other Oil & Gas Wastes 18.67 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 5,074.70 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 14,515.49 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 4,988.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 4,207.68 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 1,484.38 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017 CNX GAS CO LLC Other Oil & Gas Wastes 85.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Other Oil & Gas Wastes 41.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 1.73 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 CNX GAS CO LLC Produced Fluid 1,063.34 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 1,618.55 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Produced Fluid 265.83 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2018 CNX GAS CO LLC Produced Fluid 173.07 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Other Oil & Gas Wastes 13.27 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 847.63 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 9,779.39 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 172.25 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 CNX GAS CO LLC Other Oil & Gas Wastes 397.33 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2018 CNX GAS CO LLC Produced Fluid 256.65 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 96.17 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018 CNX GAS CO LLC Produced Fluid 13.17 Bbl INJECTION DISPOSAL WELL 34-013-20609
2018 CNX GAS CO LLC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Produced Fluid 45.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2019 CNX GAS CO LLC Drilling Fluid Waste 9.50 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Other Oil & Gas Wastes 141.67 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 400.20 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 51.80 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 14.50 Bbl INJECTION DISPOSAL WELL 34-119-28780
2019 CNX GAS CO LLC Produced Fluid 6.69 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CNX GAS CO LLC Produced Fluid 3.33 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 2,232.45 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 299.16 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 157.66 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Drilling Fluid Waste 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Drilling Fluid Waste 39.83 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019 CNX GAS CO LLC Synthetic Liner Materials 3.72 Tons LANDFILL 100172
2019 CNX GAS CO LLC Drilling Fluid Waste 4.39 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 CNX GAS CO LLC Produced Fluid 39.77 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 362.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Other Oil & Gas Wastes 10.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Other Oil & Gas Wastes 42.20 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 83.16 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 CNX GAS CO LLC Other Oil & Gas Wastes 149.17 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 322.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Drilling Fluid Waste 287.99 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 970.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Produced Fluid 16.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2338820 Primary Facility 2014-11-13 Routine/Complete Inspection No Violations Noted Well not drilled, pre-spud inspection.
2343733 Primary Facility 2015-02-11 Drilling/Alteration No Violations Noted Keane Rig 2144 drilled top hole; all casings drilled and cemented to surface with cement returns; Spud on 1/3/15; end on 1/17/15; TD@ 7176'; KOP@ 4000';
2492849 Primary Facility 2016-05-27 Incident- Response to Accident or Event No Violations Noted On Thursday, May 26, 2016, I received notification of a spill that had occurred at the GH 58 Well Site located in Center Township, Greene County. It was estimated that approximately one barrel of produced water was released when the blender tub overflowed onto containment. The produced water had left containment in at least two areas and impacted the well pad on opposite sides of the AST.

All free standing fluids were removed from the pad and the containment with a vacuum truck. Impacted materials on the well pad were excavated and taken off-site for disposal. The excavation activities were conducted with the use of soil conductivity probe readings to delineate the extent of impact and to determine the limits of excavation. Following the excavation of impacted materials from the well pad, confirmation samples were collected and new containment was installed in the affected areas. In addition, primary and secondary berms were modified to aid in preventing any similar future events. The failure to contro

2493652 Primary Facility 2016-06-01 Incident- Response to Accident or Event In Compliance with Policy On Wednesday, June 1, 2016, I received notification of a spill that had occurred the day before at the GH 58 Well Site located in Center Township, Greene County. Approximately one barrel of brine was released due to a leak in the packing of one of the pumps on-site. The release of brine was completely contained and the standing fluid was removed from containment with a vacuum truck. There was no impact to the ground surface or to water. The incident has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time.
2493690 Primary Facility 2016-06-02 Incident- Response to Accident or Event In Compliance with Policy On Thursday June 2, 2016, I received notification of a hydraulic oil spill that had occurred the previous evening at the GH 58 Well Pad located in Center Township, Greene County. Mr. Sam McLaughlin from CNX reported the details to Mr. Benjamin Dillie from the Department. A site visit was conducted on June 2, 2016 with WQS Supervisor Mr. John Carson to review work completed on an earlier matter and to review the details of recent incidents. Approximately 15-20 gallons of hydraulic fluid was released from a failed hydraulic line on the blender pump. The fluid was released into secondary containment and did not impact the ground surface or water. The secondary containment was vacuumed out and the blender pump was repaired. The incident has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time.
2493717 Primary Facility 2016-06-03 Incident- Response to Accident or Event No Violations Noted On Friday June 3, 2016, I received notification that a brine release had occurred at the GH 58 Well Site located in Center Township, Greene County. I conducted a site visit the same day and spoke with Mr. Jessie Valentine and Mr. Kyle Borden from CNX Gas Company regarding the incident and the ongoing response.

A faulty O-ring seal in a hose connected to the blender failed which caused the release of brine from the line. It was estimated that approximately four barrels of brine were released due to the faulty seal. Approximately two barrels remained on containment while the remaining two barrels left containment and impacted the well pad. CNX had determined that the majority of brine that had leaked through damaged containment while a smaller portion had splashed over the berm surrounding the blender. Standing fluid on containment was vacuumed up with a truck for off-site disposal. Some excavation had commenced on the access road side of the AST where soil remediation had already been conducted as a res

2493848 Primary Facility 2016-06-07 Incident- Response to Accident or Event In Compliance with Policy On Tuesday June 7, 2016, I received notification of a release of produced fluids that had occurred the preceding day at the GH 58 Well Site located in Center Township, Greene County. I conducted a site visit on the same day to obtain additional information regarding the release and the response. An area of stained gravel was identified near some containment that was being staged on the well site. The stained gravel area was tested with a conductivity probe which identified elevated conductivity readings. There was no fracturing activities occurring on this area of the well pad so it was concluded that residue on the containment mixed with precipitation had impacted the well pad. The containment had not been used at the GH58 well site, although use of the containment at some other site could not be ruled out and would be the most likely explanation. It was estimated that approximately 25 gallons of produced fluid had impacted the well pad. The containment was disposed off-site. The impacted gravel mat
2502756 Primary Facility 2016-07-06 Incident- Response to Accident or Event In Compliance with Policy Inspection conducted as a result of a release involving approximately five gallons of production fluid in containment and an estimated 10 gallons onto gravel. Impacted gravel was removed for disposal.
2502757 Primary Facility 2016-07-06 Incident- Response to Accident or Event In Compliance with Policy Inspection conducted as a result of a release involving approximately five gallons of production fluid in containment and an estimated 10 gallons onto gravel. Impacted gravel was removed for disposal.
2504088 Primary Facility 2016-07-06 Incident- Response to Accident or Event No Violations Noted On Tuesday, July 5, 2016, a release of production fluid had occurred at the GH 58 Well Site located in Center Township, Greene County. A phone inquiry and site inspection were conducted on Wednesday July 6, 2016. Violations of 25 Pa. Code § 78.54 and 58 Pa. C.S. § 3218.2(a) were cited.
2507147 Primary Facility 2016-07-28 Incident- Response to Accident or Event In Compliance with Policy Incident response conducted as a result of an operator notification.
2511203 Primary Facility 2016-06-13 Compliance Evaluation No Violations Noted CEI conducted to review remediation work on-site.
2511211 Primary Facility 2016-07-26 Compliance Evaluation No Violations Noted CEI conducted to review remediation work conducted on-site.
2514653 Primary Facility 2016-08-08 Incident- Response to Accident or Event In Compliance with Policy An incident response conducted as a result of an operator notification.
2516454 Primary Facility 2016-08-17 Administrative/File Review In Compliance with Policy Incident response conducted as a result of an operator notification.
2557446 Primary Facility 2017-01-27 Incident- Response to Accident or Event In Compliance with Policy Incident response conducted in response to an operator notification.

For data sources see[9]

References