If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26513 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.859617,"lon":-80.088342,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Greene Township | |
Operator Name: GREYLOCK PROD LLC | |
Well Pad ID: 150733 | |
Farm/Lease Name: VERES 7MH | |
License Status: | |
Spud Date: | |
Permit Date: 2014-05-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.859617 | |
Longitude: -80.088342 |
Date | Event |
---|---|
2014-05-08 | New Permit Application |
2014-06-11 | Performed Spud Operation |
2014-11-20 | Drilling Completion |
2015-01-21 | Perforation |
2015-01-21 | Performed Stimulation |
2016-03-16 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-01-21 | 2015-02-11 | 8,110 | 11,281,400 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Proppant-100 Mesh | Universal Well Services | Proppant | crystalline silica quartz | 14808-60-7 | 100 | 2.92679 | 3,141,530.0 |
Unihib G | Universal Well Services | Corrosion Inhibitor for Acid | Short chained glycol ether | N/A | 25 | 0.00015 | 159.78 | |
2-Ethyl Hexanol | 104-76-7 | 75 | 0.00045 | 479.339 | ||||
Scale Hib A | Universal Well Services | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00807 | 8658.93 | |
15% Hydrochloric Acid (UWS) | Universal Well Services | Acid | Hydrochloric Acid | 7647-01-0 | 15 | 0.10395 | 111578 | |
LEB 10X | Universal Well Services | Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00034 | 365.854 | |
WGA-3, CMHPG | Universal Well Services | Dry Gellant | Guar Gum | 9000-30-0 | 100 | 0.00098 | 1050 | |
Water | ECA | Base Fluid | Water | N/A | 100 | 87.5501 | 93,973,800.0 | |
Unislick ST-50 | Universal Well Services | Friction Reducer | Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.02641 | 28349 | |
Proppant-40/70 | Universal Well Services | Proppant | crystalline silica quartz | 14808-60-7 | 100 | 8.6851 | 9,322,350.0 | |
EC6116A | Universal Well Services | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.01679 | 18017.3 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00839 | 9008.65 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.0014 | 1501.44 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-01-21 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | ENERGY CORP OF AMER | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | ENERGY CORP OF AMER | 1,707,105.00 | 273 | 0.00 | 0 | 0.00 | 0 |
2016 | ENERGY CORP OF AMER | 1,166,789.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ENERGY CORP OF AMER | 792,663.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | GREYLOCK PROD LLC | 569,402.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | GREYLOCK PROD LLC | 495,676.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | ENERGY CORP OF AMER | Drill Cuttings | 796.47 Tons | LANDFILL | 100419 |
2014 | ENERGY CORP OF AMER | Drill Cuttings | 112.76 Tons | LANDFILL | 100277 |
2014 | ENERGY CORP OF AMER | Drilling Fluid Waste | 8,913.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | ENERGY CORP OF AMER | General O&G waste not covered by other waste types | 2.56 Tons | LANDFILL | 100419 |
2014 | ENERGY CORP OF AMER | General O&G waste not covered by other waste types | 1.34 Tons | LANDFILL | 100277 |
2015 | ENERGY CORP OF AMER | General O&G waste not covered by other waste types | 1.24 Tons | LANDFILL | 100277 |
2015 | ENERGY CORP OF AMER | General O&G waste not covered by other waste types | 2.55 Tons | LANDFILL | 100419 |
2015 | ENERGY CORP OF AMER | Drill Cuttings | 25.22 Tons | LANDFILL | 100419 |
2015 | ENERGY CORP OF AMER | Fracing Fluid Waste | 33,148.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ENERGY CORP OF AMER | Drill Cuttings | 28.76 Tons | LANDFILL | 100277 |
2015 | ENERGY CORP OF AMER | Produced Fluid | 944.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2015 | ENERGY CORP OF AMER | Produced Fluid | 254.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | ENERGY CORP OF AMER | Fracturing Fluid Waste | 39.52 Tons | LANDFILL | 100419 |
2015 | ENERGY CORP OF AMER | Produced Fluid | 1,087.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | ENERGY CORP OF AMER | Fracturing Fluid Waste | 11.35 Tons | LANDFILL | 100277 |
2015 | ENERGY CORP OF AMER | Produced Fluid | 16,457.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ENERGY CORP OF AMER | Produced Fluid | 410.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | ENERGY CORP OF AMER | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | ENERGY CORP OF AMER | Produced Fluid | 1,628.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2016 | ENERGY CORP OF AMER | Produced Fluid | 1,025.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | ENERGY CORP OF AMER | Produced Fluid | 3,954.00 Bbl | INJECTION DISPOSAL WELL | 34-167-29543 |
2017 | ENERGY CORP OF AMER | Produced Fluid | 1,500.00 Bbl | REUSE (AT WELL PAD) | |
2017 | ENERGY CORP OF AMER | Produced Fluid | 339.36 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | WVR00521948 |
2017 | ENERGY CORP OF AMER | Produced Fluid | 339.36 Bbl | CENT WASTE TRT FAC NPDES | WVR00521948 |
2017 | ENERGY CORP OF AMER | Produced Fluid | 330.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | ENERGY CORP OF AMER | Produced Fluid | 728.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2018 | GREYLOCK PROD LLC | Synthetic Liner Materials | 12.20 Tons | LANDFILL | 100172 |
2018 | GREYLOCK PROD LLC | Produced Fluid | 625.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | GREYLOCK PROD LLC | Produced Fluid | 59.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 33.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | ENERGY CORP OF AMER | Produced Fluid | 1,142.34 Bbl | REUSE (AT WELL PAD) | |
2018 | GREYLOCK PROD LLC | Produced Fluid | 27.50 Bbl | INJECTION DISPOSAL WELL | 34-105-23619 |
2019 | GREYLOCK PROD LLC | Produced Fluid | 23.66 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | GREYLOCK PROD LLC | Produced Fluid | 537.22 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | GREYLOCK PROD LLC | Produced Fluid | 7.91 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019 | GREYLOCK PROD LLC | Produced Fluid | 857.04 Bbl | REUSE (AT WELL PAD) | |
2019 | GREYLOCK PROD LLC | Produced Fluid | 37.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 32.28 Bbl | REUSE (AT WELL PAD) | |
2019 | GREYLOCK PROD LLC | Produced Fluid | 52.67 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 39.80 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 24.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | GREYLOCK PROD LLC | Produced Fluid | 56.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2280511 | Primary Facility | 2014-06-20 | Drilling/Alteration | No Violations Noted | Conductor pipe set on well; no known depth; waiting on tophole rig to rig up to drill; |
2294295 | Primary Facility | 2014-07-24 | Drilling/Alteration | No Violations Noted | TOP HOLE SETS DRILLED. CEMENT DETAILS REVIEWED. |
2331245 | Primary Facility | 2014-11-21 | Drilling/Alteration | No Violations Noted | PATTERSON RIG 339 DRILLING FOR ECA. WELL DRILLED TO COMPLETION. TD 15,330'. WERE TOH AT TIME OF INSPECTION PREPARING TO RUN CASING. |
2349739 | Primary Facility | 2015-01-23 | Routine/Complete Inspection | No Violations Noted | Well drilled, being fracked. |
2740551 | Primary Facility | 2018-05-30 | Routine/Complete Inspection | No Violations Noted | On 05/30/18 at approximately 1300 hours I, along with WQS Adam Ofstun and EPS Kevin Maskol, conducted a routine complete inspection of the site.
The drilling rig was being rigged downed and the site prepared for the switch to fracking operations. Sheen was observed on fluids on secondary containment in multiple locations (see photographs). Diesel fuel was observed on secondary containment above the #6 well. A vac truck was mobilized to remove the fluids during the course of inspection The containment and matting on site appeared to be heavily soiled. Greylock indicated they intended to reuse the secondary containment during fracking operations. It is recommended the containment be thoroughly cleaned, inspected, and repaired as necessary prior to fracking operations. Soiled equipment used on site was being pressure washed near the edge of containment. The contaminated overspray was reaching the gravel well pad off containment. The containment beneath the truck containing the equipment being pressure washe |
For data sources see[9]