37-059-26556

Well Details

Well ID: 37-059-26556
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 151352
Farm/Lease Name: HILDEBRAND 592624
License Status:
Spud Date:
Permit Date: 2014-06-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.978464
Longitude: -80.094025

For data sources see[1][2][3]

Well History

Date Event
2014-06-06 New Permit Application
2014-06-12 Performed Spud Operation
2014-10-13 Drilling Completion
2014-11-04 Perforation
2014-11-13 Performed Stimulation
2016-03-22 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-13 2014-11-20 7,871 8,823,440 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Stingray Pressure Pumping, LLC Carrier/Base Fluid Water 7732-18-5 100 89.0685 73,631,600.0
POLYfrac PTL Plus M-4.0 Stingray Pressure Pumping, LLC Guar gum slurry Petroleum distillate 64742-47-8 55 0.00400483 3310.73
Clay Proprietary 5 0.000364075 300.976
Guar gum 9000-30-0 50 0.00364075 3009.76
TCA 6038F Stingray Pressure Pumping, LLC Corrosion inhibitor Water 7732-18-5 80 0.00005622 46.48
Methanol 67-56-1 20 0.00001406 11.62
MC MX 5-2402 Multi-Chem Sodium Nitrate Brine Sodium nitrate 7631-99-4 60 0.0576789 47682.3
Hydrochloric Acid (15%) Stingray Pressure Pumping, LLC Acidizing Hydrochloric Acid 7647-01-0 15 0.0185882 15366.6
FRA-405 Stingray Pressure Pumping, LLC Friction reducer Alcohols, C12-16, Ethoxylated 68551-12-2 7 0.00516457 4269.48
Sodium chloride 7647-14-5 10 0.00737796 6099.26
Petroleum distillates 64742-47-8 40 0.0295118 24397
Ammonium chloride 12125-02-9 7 0.00516457 4269.48
Sand (Proppant) Stingray Pressure Pumping, LLC Proppant Silica Substrate 14808-60-7 100 10.6295 8,787,240.0
Breaker 3L Stingray Pressure Pumping, LLC Gel Breaker Soidum chlorite 7758-19-2 5 0.00004166 34.437
Sodium chloride 7647-14-5 40 0.000333253 275.495
Potassium chloride 7447-40-7 10 0.00008331 68.874

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-11-13 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 EQT PROD CO 121,606.00 22 0.00 0 0.00 0
2015 EQT PROD CO 2,117,943.00 351 0.00 0 0.00 0
2016 EQT PROD CO 973,271.00 366 0.00 0 0.00 0
2017 EQT PROD CO 730,479.00 365 0.00 0 0.00 0
2018 EQT PROD CO 580,371.00 365 0.00 0 0.00 0
2019 EQT PROD CO 440,501.00 363 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 EQT PROD CO Drilling Fluid Waste 52.00 Bbl LANDFILL SWF 1032-WV0109
2014 EQT PROD CO Produced Fluid 940.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Drill Cuttings 1,507.00 Tons LANDFILL 100419
2014 EQT PROD CO Fracing Fluid Waste 2,705.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Drilling Fluid Waste 3,444.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Fracturing Fluid Waste 77.00 Tons LANDFILL SWF 1032-WV0109
2014 EQT PROD CO Produced Fluid 13.00 Bbl LANDFILL SWF 1032-WV0109
2015 EQT PROD CO Fracturing Fluid Waste 7.46 Tons LANDFILL SWF 1032-WV0109
2015 EQT PROD CO Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-031-27178
2015 EQT PROD CO Produced Fluid 310.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 EQT PROD CO Produced Fluid 220.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2015 EQT PROD CO Produced Fluid 550.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Fracing Fluid Waste 130.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 18,632.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 640.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Fracturing Fluid Waste 55.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 155.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 EQT PROD CO Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 EQT PROD CO Produced Fluid 645.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 15,515.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 110.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 EQT PROD CO Other Oil & Gas Wastes 130.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 681.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 1,921.20 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 47.13 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 484.14 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 17.89 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 99.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 68.57 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 801.98 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2291859 Primary Facility 2014-07-02 Drilling/Alteration No Violations Noted Well drilled by Alpha Hunter 6 tophole rig; On 6/28 ran 13 3/8 to 607'; Cement baskets @545,543; Mine @ 555-565; cement with 569 sks (120bbls) Class A with 2%Cacl2; cemnt returns of 17 bbls; Drilled to 3200'TD; Ran 9 5/8" casing to 3149'; Lead: 830 sks Class A; Tail: 295 sks Class A 1%CaC;l2; 50 bbls to surface of cement returns;
2308738 Primary Facility 2014-09-29 Drilling/Alteration No Violations Noted Patterson Rig 252 spud on 9/28/14; drilling in the curve @ 5784'; KOP@ 5435'; location walkaround indicated no drilling or containment issues;
2318355 Primary Facility 2014-10-02 Drilling/Alteration No Violations Noted Drilling @ 7917'; directional bit issues; slow drilling; location in good shape; no issues
2511691 Primary Facility 2016-07-26 Routine/Complete Inspection No Violations Noted

On 07/26/16 at approximately 1330 hours I conducted an incident response inspection at the EQT Hildebrand well pad in response to a BMP blowout at the site. The Act 9 sign was in place and all required documents were present.

The site was being restored at the time of the BMP failure. A large rainfall event had occurred, overwhelming the sediment trap and causing the downslope wall of the sediment trap to fail. The resulting water, rock, and sediment broke through multiple silt socks leaving the LOD and entering a stream. A large amount of rock and gravel was found in the stream bed approximately 150’ from the sediment trap failure (see photographs). A pond approximately 200-250’ downstream was discolored from the sediment released from the BMP failure. At the time of inspection an excavator was repairing the breach in the sediment trap wall. EQT was advised to apply for an emergency 105 permit to repair the section of the stream that was impacted by the BMP failure.

The following violations resulted fro

2547887 Primary Facility 2016-10-14 Compliance Evaluation No Violations Noted

On 10/14/16 at approximately 1100 hours I conducted a compliance evaluation inspection at the EQT Hildebrand. The Act 9 sign was in place and all required documents were present at the site. In July 2016 the site had a sediment trap blowout, resulting in rock and sediment breaking through multiple silt socks and impacting a nearby stream. An emergency 105 permit was obtained by EQT and the material was removed from the stream. The sediment trap and erosion had been repaired at the time of inspection and the site was exhibiting new vegetation. There were no violations observed at the time of inspection.

2569661 Primary Facility 2017-03-07 Complaint Inspection No Violations Noted

On 03/06/16 a complaint was received by the Department alleging BMP failures at the Hildebrand well site. On 03/07/17 at approximately 1330 hours I, along with Water Quality Specialist Supervisor John Carson, conducted a complaint inspection of the site. The Act 9 sign was in place and all required documents were present.

Gravel from the site was found across Bowser Road. This is a violation of 102.5(m)(4) for impacts outside of the limits of disturbance.

A black corrugated pipe that was not shown on the E&S plans was observed on the right side of the access road immediately upon entry to the site. It is requested that EQT provide information on this pipe in the NOV response.

The rain garden was not functioning as designed and is at risk of failure. Water was bypassing the riser structure and draining through the soils between the rain garden toward the channel near the stilling well. A significant amount of sediment was observed in the rain garden and sediment laden water was observed in the stilling

2595655 Primary Facility 2017-04-05 Follow-up Inspection No Violations Noted On 04/05/17 at approximately 1200 hours I along with WQSS John Carson and Environmental Engineer Donna Davis conducted a follow up inspection of the Hildebrand site in response to an NOV issued on 03/07/17.

The leak around the riser structure in the rain garden had been repaired. The rain garden appears to contain sediment from poorly stabilized adjacent slopes. The slopes appeared to be failing, depositing sediment into the rain garden and causing a loss of volume. Additionally, erosion was occurring along the southwestern rip rap channel into the rain garden. It is recommended that this be repaired to prevent further erosion and volume loss. It is requested that EQT contact Donna Davis to discuss maintenance of the BMP. It is requested that EQT contact Donna Davis regarding the cross drain causing erosion into the pond on UNT to Castile Run.

The silt socks that were previously undercut or overtopped had been maintained to prevent undercutting, but sediment was still close to or at the top of the silt soc

2613986 Primary Facility 2017-06-27 Follow-up Inspection No Violations Noted A follow up inspection was conducted, since previously cited violations are still outstanding. An excavator was present on the site making repairs to the rain garden. The erosion that had occurred in the area of the removed sediment trap appeared to have been repaired, but erosion was still occurring in the area. Silt socks had been reconfigured to prevent further erosion. Portions of the area upslope of the removed sediment trap had increased vegetative cover since the last NOV was issued. The access road appeared to be washing out on the bend in the access road. The slide in the well pad slope was still present. Additional repairs on the site appeared to be occurring at the time of inspection.
2638134 Primary Facility 2017-09-20 Site Restoration No Violations Noted A site inspection was conducted in response to EQT requesting a meeting to discuss site vegetation and silt sock removal. The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated. The erosion channel from near the access road to the location of the removed sediment trap was vegetated. It is recommended that the erosion channel be repaired to original grade, seeded, and mulched. The rain garden appeared to be in good condition. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2692695 Primary Facility 2018-01-29 Site Restoration No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site entrance exhibited signs of access road erosion (see photographs). It appeared water was overflowing the culvert and removing material from the access road near the Act 9 sign.

The site did not exhibit uniform 70% vegetative cover. Areas of poor or no vegetative cover were observed. Erosion was occurring along the access road below the check dams in the location of the removed sediment trap (see photographs).

The site does not meet the requirements for permit termination. The NOT is denied.

2760138 Primary Facility 2018-07-19 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from EQT Production Co. The Act 9 sign was in place and all required documents were present.

Erosion of the access road was observed at the site entrance. Metal grates were in place over a large channel in the access road (see photographs). The channel continued off the site parallel to Bowser Road heading South. Erosion of the access road along the right side was also observed (see photographs). Erosion was observed adjacent to the left side of the access road below a neighboring pond, exposing a black pipe.

Poorly vegetated soil and accelerated erosion were observed where silt sock was removed in the area of the restored sediment trap. Multiple small erosion rills were observed in the vegetated area upslope. It appeared the rills existed and were not repaired prior to the vegetation grew and covered the rills. It is recommended the accelerated erosion is repaired.

The site does not meet the requirements for permit terminatio

2798825 Primary Facility 2018-11-06 Routine/Complete Inspection No Violations Noted
2809678 Primary Facility 2018-11-14 Site Restoration No Violations Noted A meeting was requested by EQT to evaluate the site for NOT criteria. The Act 9 sign was in place and all required documents were present at the site. PCSM was installed and appeared to be functioning. Site vegetation met the requirement of 70% uniform vegetative cover. The site meets the requirements for permit termination. The NOT is approved.
2849629 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted On 02/25/19 at approximately 1220 hours I conducted an inspection of the site. It appeared recent heavy rains had caused the pit collecting water for the culvert to overflow at the site entrance, causing wash out of the access road. Ice was present on Bowser road and appeared to have been caused by water leaving the well site.

Water from the adjacent private pond was eroding through the pond bank along the pipe leading to the culvert inlet. The inlet from the pond was clogged with debris, causing water to divert around the pipe and erode alongside it.

The culvert appeared to be functioning at the time of inspection.