If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26569 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.933606,"lon":-80.394281,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Gray Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 150951 | |
Farm/Lease Name: JACOBS 5H | |
License Status: | |
Spud Date: 2014-08-09 | |
Permit Date: 2014-06-20 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.933606 | |
Longitude: -80.394281 |
Date | Event |
---|---|
Deviated | |
2014-06-20 | New Permit Application |
2014-06-24 | Performed Spud Operation |
2014-10-10 | Drilling Completion |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-11-14 | 2014-12-03 | 7,080 | 9,136,670 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ECM FR PRO 50 | ECM | Friction reducer | Hydrotreated Light Distillate | 64742-47-8 | 20 | 0.04545 | 40229.2 |
Water | Customer & CWS | Base Fluid & Mix Water | Water | 7732-18-5 | 100 | 86.7319 | 76,386,100.0 | |
Sand (Proppant), DAP-903, DAP-925, BioClear 2000, Hydrochloric Acid |
CWS | Propping Agent, Scale Inhibitor, Acid Corrosion Inhibitor, Biocide, Clean Perforations | Formaldehyde | 50-00-0 | 0.1 | 0.00000020 | 0.11 | |
Biotite | 1302-27-8 | 0.1 | 0.01064 | 9367.26 | ||||
2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 20 | 0.01315 | 11582.6 | ||||
2-Propenoic acid, polymer with sodium phosphonate | 71050-62-9 | 60 | 0.0068 | 5986.13 | ||||
Apatite | 64476-38-6 | 0.1 | 0.01064 | 9367.26 | ||||
Olefin | Proprietary | 5 | 0.00001000 | 5.57 | ||||
Polyethylene glycol mixture | 25322-68-3 | 70 | 0.01315 | 11582.6 | ||||
Propargyl Alcohol | 107-19-7 | 10 | 0.00001000 | 11.15 | ||||
Fatty acids | Proprietary | 30 | 0.00004000 | 33.44 | ||||
Calcite | 471-34-1 | 1 | 0.00588 | 5176.05 | ||||
Illite | 12173-60-3 | 1 | 0.02796 | 24626.1 | ||||
Sodium chloride | 7647-14-5 | 1 | 0.00000200 | 1.12 | ||||
Goethite | 1310-14-1 | 0.1 | 0.0112 | 9860.22 | ||||
Polyoxyalkylenes | Proprietary | 30 | 0.00004000 | 33.44 | ||||
Modified thiourea polymer | 68527-49-1 | 30 | 0.00004000 | 33.44 | ||||
Hydrochloric acid | 7647-01-0 | 37 | 0.11371 | 100150 | ||||
Methanol | 67-56-1 | 60 | 0.00008000 | 66.87 | ||||
Ilmenite | 98072-94-7 | 0.1 | 0.01036 | 9120.78 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 13.0444 | 11,488,400.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 1,485,344.00 | 291 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 1,057,499.04 | 363 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 678,822.82 | 342 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 517,081.00 | 311 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 410,723.00 | 318 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | Drill Cuttings | 305.42 Tons | LANDFILL | PAD059087072 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 893.69 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 253.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | RICE DRILLING B LLC | Produced Fluid | 253.67 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 411.33 Tons | LANDFILL | 301071 |
2015 | RICE DRILLING B LLC | Produced Fluid | 9,150.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3.94 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Produced Fluid | 97.33 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | RICE DRILLING B LLC | Produced Fluid | 209.17 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 65.15 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 23,881.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 193.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 191.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Produced Fluid | 8,172.54 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 339.03 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 2.52 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 240.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 235.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 5.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 6.40 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 61.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 11.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 83.16 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 6.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,331.33 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 36.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RICE DRILLING B LLC | Produced Fluid | 289.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 3.58 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2017 | RICE DRILLING B LLC | Produced Fluid | 146.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | RICE DRILLING B LLC | Produced Fluid | 178.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 2.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2018 | RICE DRILLING B LLC | Produced Fluid | 59.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 48.33 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 4.83 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 362.32 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Servicing Fluid | 4.83 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 781.34 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 31.31 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Produced Fluid | 32.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 29.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 58.33 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2292025 | Primary Facility | 2014-07-17 | Drilling/Alteration | No Violations Noted | CONDUCTOR SET 40' OF 26'. FALCON 23 ON SITE DRILLING TOP HOLE SETS. |
2304719 | Primary Facility | 2014-07-17 | Routine/Complete Inspection | No Violations Noted | During drilling site inspection. |
2417480 | Primary Facility | 2015-10-14 | Routine/Complete Inspection | No Violations Noted | Well in production. Well in compliance. |
2788839 | Primary Facility | 2018-10-10 | Routine/Complete Inspection | No Violations Noted | On October 10, 2018, the Department performed an inspection of the EQT/Rice Energy Jacobs well site. Present at time of inspection was Carey Bell and Shane Closkey (EQT). The site is located in Gray Twp., Greene Co. The inspection was routine inspection of the site related to a request by the operator to view the site, prior to the submission of a Notice of Termination of the ESCGP2 permit to the Department.
The operator has requested a meeting on site to review the condition of the site prior to submitting a Notice of Termination for the ESCGP2 permit. The well site is stable with greater than 70% uniform perennial vegetative cover. The operator has reclaimed the sediment trap on site and has removed all the E&S BMPs. The operator has reclaimed the well pad to the interim restoration plan. The Department would recommend termination of the ESCGP2 permit given the condition of the site at time of inspection. 6 wells have been drilled to completion on the site and are equipped for production. The GPU |
For data sources see[8]