If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-23470 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.755173,"lon":-78.984052,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Grant Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: CLIFFORD K MCQUOWN C378 | |
License Status: INACTIVE | |
Spud Date: 1976-12-02 | |
Permit Date: 1976-08-24 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.755173 | |
Longitude: -78.984052 |
Date | Event |
---|---|
1976-08-24 | New Permit Application |
1976-12-02 | Performed Spud Operation |
1976-12-06 | Drilling Completion |
1977-01-05 | Perforation |
1977-02-28 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1996 | CASTLE GAS CO INC | 14 | 351 | 0.00 | 0 | 0.00 | 0 |
2002 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2003 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2004 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2005 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | PETRO DEV CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | PETRO DEV CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PDC MOUNTAINEER LLC | 0.01 | 1 | 0.01 | 1 | 0.00 | 0 |
2012 | PDC MOUNTAINEER LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | PDC MOUNTAINEER LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | ALLIANCE PETRO CO LLC | 1.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ALLIANCE PETRO CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | ALLIANCE PETRO CO LLC | 100.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 100.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 100.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PDC MOUNTAINEER LLC | Produced Fluid | 34.53 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2469696 | Primary Facility | 2016-03-21 | Routine/Complete Inspection | No Violations Noted | At time of inspection well appears equipped for production. Well tag present and legible. Brine tank appears structurally sound.
It appears recent earthmoving activities have taken place on site. A trench has been dug exposing underground piping. Department contacted Operator by phone from field to inquire about site disturbance. Operator Rep Tom Juart returned call later that day. Mr. Juart stated he would contact field personel and follow up with Department. UPDATE: Mr. Juart followed up later that same day and stated that well is used for house gas and that landowner disturbed site. Department recommends Operator ensure that landowner backfill disturbed area and ensure that site is temporarily stabilized. A follow up inspection will be conducted at a later date to ensure permanent stabilization has been achieved. |
For data sources see[7]