If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-35601 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.500621,"lon":-79.32306,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Conemaugh Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: GEORGE M KINER 5 | |
License Status: ACTIVE | |
Spud Date: 2008-02-01 | |
Permit Date: 2007-09-20 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.500621 | |
Longitude: -79.323060 |
Date | Event |
---|---|
2007-09-20 | New Permit Application |
2008-01-15 | Perforation |
2008-02-01 | Performed Spud Operation |
2008-02-07 | Drilling Completion |
2008-09-26 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | PHILLIPS EXPLORATION INC | 2858.00 | 202 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS EXPLORATION INC | 3107.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 2,316.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 1,767.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 907.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 2,108.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 1,450.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 1,194.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 1,061.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 998.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,169.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 3.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 27.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 4.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 4.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2013 | XTO ENERGY INC | Produced Fluid | 20 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 20.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1645669 | Primary Facility | 2007-08-07 | Routine/Complete Inspection | No Violations Noted | PROPOSED WELL SITE IS STAKED. E/S CONTROL PLAN SHOULD SHOW MODIFICATIONS IN ACCESS ROAD. |
1954039 | Primary Facility | 2011-03-02 | Site Restoration | No Violations Noted | At the time of inspection, tag present (along with sign and Es plan). Well in production. Well completed on 02/07/2008. Site adequately and uniformly restored; therefore, operator may remove all temporary bmp¿s previously installed along with sign and ES plan. Faint gas odor detected near production equipment. No Iw issues discharges observed. Brine tank appears sound. No accelerated erosion or sedimentation issues observed with will site or access road. Access road stable adequately rocked. Site gated. |
2060493 | Primary Facility | 2012-04-13 | Routine/Complete Inspection | No Violations Noted | Producing gas. Tag, tank, e&s ok. |
For data sources see[7]