If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36388 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.465741,"lon":-79.276353,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Burrell Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: R C L SHUMAKER 5 | |
License Status: | |
Spud Date: 2009-07-14 | |
Permit Date: 2009-01-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.465741 | |
Longitude: -79.276353 |
Date | Event |
---|---|
2009-01-13 | New Permit Application |
2009-07-14 | Performed Spud Operation |
2009-07-20 | Drilling Completion |
2009-07-28 | Perforation |
2009-10-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 7977.00 | 106 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 31,503.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 21,962.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 12,044.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 11,013.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 22,174.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 17,433.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 7,019.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 11,954.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 14,376.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 13,766.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1884125 | Primary Facility | 2010-05-10 | Site Restoration | Violation(s) Noted | At the time of inspection, well was properly tagged and in production. Sign and E&S plan onsite. Brine tank appeared sound. Access road was stable. Site was not properly restored within nine months of completion of drilling (07.20.09), or upon dept receiving restoration report which a violation will be issued for. It also appeared no efforts were taken to regrade or mulch and seed the area to permanently stabilize the site. Also noted accelerated erosion and sedimentation issues down gradient from well pad, as well as significant ponding of water surrounding well head and well site. |
1953016 | Primary Facility | 2011-02-28 | Routine/Complete Inspection | No Violations Noted | Producing gas. Tag, tank, e&s ok. |
2354587 | Primary Facility | 2015-03-24 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. According to records, drilling occurred 7/14/2009-7/20/2009. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1884125 | 586932 | 05/10/2010 | 2010-05-10 | 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | Environmental Health & Safety | |
1884125 | 586933 | 05/10/2010 | 2010-05-10 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
586932 | 257672 | NOV - Notice of Violation | Comply/Closed | 2010-08-16 | |||
586932 | 263944 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-03 | 2010-11-03 | $7,500.00 | $7,500.00 |
586933 | 257672 | NOV - Notice of Violation | Comply/Closed | 2010-08-16 | |||
586933 | 263944 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-03 | 2010-11-03 | $7,500.00 | $7,500.00 |
For data sources see[6]