37-063-36413

Well Details

Well ID: 37-063-36413
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Burrell Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: ALEX TAMSULA 2
License Status:
Spud Date: 2009-08-20
Permit Date: 2009-01-27
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.458185
Longitude: -79.264575

For data sources see[1][2][3]

Well History

Date Event
2009-01-27 New Permit Application
2009-08-18 Performed Spud Operation
2009-08-25 Drilling Completion
2009-09-01 Perforation
2010-01-13 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 PHILLIPS EXPLORATION INC 528.00 10 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 10,984.00 365 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 5,706.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 3,022.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 3,813.00 364 0.00 0 0.00 0
2014 XTO ENERGY INC 7,706.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 6,367.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 3,278.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 5,109.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 6,138.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 5,786.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PHILLIPS EXPLORATION INC Produced Fluid 2.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 10.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1815168 Primary Facility 2009-07-15 Routine/Complete Inspection No Violations Noted site constructed, well staked, 2 pits dug but unlined, no rig or equipment,
1819585 Primary Facility 2009-08-07 Drilling/Alteration No Violations Noted Currently, well permit issued on 1/26/09 for well to be completed to 5,000 ft. in depth. Well pad completed with filter fencing and dual pits. Well stake located in center of pad. Well sign and E&S plan located at the entrance way. Site layout matches the E&S plan. At the time of inspection, no E&S issues at the site.
1841569 Primary Facility 2009-10-27 Routine/Complete Inspection No Violations Noted At the time of inspection, the well was drilled not yet in production. The site was properly signed with E&S plan onsite available for review. No accelerated erosion or sedimentation issues were observed in relation to access road or well site. Fluids were removed from pits, but the pit liners were improperly secured, as small portions of the upper liner had become unsecured and fallen downward, into the pit. Although freeboard was not exceeded this could cause a potential pollution event, it is recommended that his be addressed promptly to avoid any such violation.
1884140 Primary Facility 2010-05-10 Routine/Complete Inspection No Violations Noted At the time of inspection, the well was drilled and in production. Brine tank was stable. No accelerated E&S issues were observed. Access road was stable. Site was regraded and rocked, but it is recommended that operator reseed site as 70% successful vegetative growth was not yet observed. A future inspection will be conducted to ensure site is reseeded and mulched to optimal/uniform growth to ensure permanent stabilization.
1951899 Primary Facility 2011-02-24 Routine/Complete Inspection No Violations Noted Producing gas. Tag, tank, e&s ok.
2255465 Primary Facility 2014-03-21 Routine/Complete Inspection No Violations Noted Producing gas. Tag, tank, e&s ok.
2298149 Primary Facility 2014-08-20 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was in production.
2316629 Primary Facility 2014-10-27 Routine/Complete Inspection No Violations Noted At time of inspection, well drilled and equipped for production. According to records, drilling occurred 8/20/2009-8/25/2009. Well tag present, legible. Brine tank sound, located on gravel pad. Moderate gas odor noted.
2514985 Primary Facility 2016-08-11 Routine/Complete Inspection No Violations Noted 8/11/2016 - Produced fluids tank, annulus closed.

For data sources see[7]

References