Well Details

Well ID: 37-063-36440
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: FLORENCE MINING CO 2
License Status:
Spud Date: 2009-03-19
Permit Date: 2009-02-23
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.434994
Longitude: -79.0888

For data sources see[1][2][3]

Well History

Date Event
2009-02-23 New Permit Application
2009-03-19 Performed Spud Operation
2009-03-25 Drilling Completion
2009-04-02 Perforation
2010-01-13 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 PENNECO OIL CO INC 16070.00 365 0.00 0 0.00 0
2010 PENNECO OIL CO INC 31,039.00 304 0.00 0 0.00 0
2011 PENNECO OIL CO INC 21,651.00 334 0.00 0 0.00 0
2012 PENNECO OIL CO INC 11,317.00 366 0.00 0 0.00 0
2013 PENNECO OIL CO INC 7,095.00 365 0.00 0 0.00 0
2014 PENNECO OIL CO INC 5,770.00 365 0.00 0 0.00 0
2015 PENNECO OIL CO INC 4,122.83 305 0.00 0 0.00 0
2016 PENNECO OIL CO INC 4,637.85 366 0.00 0 0.00 0
2017 PENNECO OIL CO INC 3,888.00 365 0.00 0 0.00 0
2018 PENNECO OIL CO INC 3,095.86 121 0.00 0 0.00 0
2019 PENNECO OIL CO INC 2,259.51 242 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 PENNECO OIL CO INC Fracking Fluid 1,820.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2011 PENNECO OIL CO INC Produced Fluid 35.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2014 PENNECO OIL CO INC Produced Fluid 30 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 30.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016 PENNECO OIL CO INC Produced Fluid 93 Bbl CENT WASTE TRT FAC NPDES PA0095443
2016 PENNECO OIL CO INC Produced Fluid 93.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2018 PENNECO OIL CO INC Produced Fluid 10.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PENNECO OIL CO INC Produced Fluid 13.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1833196 Primary Facility 2009-09-24 Routine/Complete Inspection No Violations Noted At the time of inspection, the access road was in good condition. The well was in production and properly tagged with name and permit number. The area was adequately and uniformly vegetated. No accelerated erosion or sedimentation was observed. The brine tank was in sound condition, but noted that the tank was ½ full.
1848727 Primary Facility 2009-12-08 Complaint Inspection No Violations Noted Rick Hoover and Paul Wyrwas were present for inspection. Well drilled on 3/25/09 to depth of 4950 ft. Well Completion Report submitted to the DEP. Reviewing the completion report, well meets the criteria for requirements of 78.81-78.86 (relating to casing and cementing). Well head consisted of 95/8¿, 7¿ and 4.5¿ casing reduced to 2¿. At the 4.5¿ to 2¿ swedge, a substantial amount of gas was leaking from the threaded connection. Leak area was starting to build up of ice. Strong gas odors were noted throughout the site pad. According to Penneco, well head pressure is roughly 900 psi with line pressure of 100 psi. Production equipment consisted of heater, separator and 100 bbl brine tank (< 20 bbl fluid). At the time of inspection, no E&S and IW issues at the site. DEP requested that Penneco repair the leak due to public health and safety concerns under 78.74 regulations.
1941533 Primary Facility 2011-01-06 Routine/Complete Inspection No Violations Noted Well head consisted of 8¿ pipe reduced to 4 ¿pipe reduced to 2¿ production line. No signs of leakage from well head. Production equipment consisted of heater, separator (125 psi) and 100 bbl brine tank (< 10 bbl fluid). At the time of inspection, no E&S and IW issues at the site. Totalizer show 53636 MCF and 6012 MCF.
1981821 Primary Facility 2011-06-20 Routine/Complete Inspection No Violations Noted Producing gas. Tag, tank, e&s ok.
2102274 Primary Facility 2012-09-17 Routine/Complete Inspection No Violations Noted At the time, no E&S issues were present. Gas well was in production.
2319922 Primary Facility 2014-10-08 Routine/Complete Inspection No Violations Noted At the time, no E&S issues were present. Gas well was in production.
2503060 Primary Facility 2016-07-20 Routine/Complete Inspection No Violations Noted system running. no issues
2503062 Primary Facility 2016-07-20 Routine/Complete Inspection No Violations Noted system running. no issues
2511816 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted system running. no issues

For data sources see[7]