X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-36478

Well Details

Well ID: 37-063-36478
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Black Lick Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: SMITH & CLAWSON 3A
License Status:
Spud Date: 2009-05-18
Permit Date: 2009-03-24
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.485907
Longitude: -79.256713

For data sources see[1][2][3]

Well History

Date Event
2009-03-24 New Permit Application
2009-05-11 Performed Spud Operation
2009-05-14 Drilling Completion
2009-05-26 Drilling Completion
2009-06-02 Perforation
2009-09-11 NEWLY DRILLED
2009-10-08 SKIDDED RIG

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 PHILLIPS EXPLORATION INC 104.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 1,331.00 365 67.00 365 0.00 0
2011 PHILLIPS EXPLORATION INC 6,387.00 363 54.00 363 0.00 0
2012 XTO ENERGY INC 5,259.00 366 55.00 366 0.00 0
2013 XTO ENERGY INC 4,316.00 363 41.92 363 0.00 0
2014 XTO ENERGY INC 1,956.00 225 0.00 0 0.00 0
2015 XTO ENERGY INC 2,170.00 200 68.47 200 0.00 0
2016 XTO ENERGY INC 261.00 97 9.87 97 0.00 0
2017 ALLIANCE PETRO CO LLC 1,472.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 683.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 316.00 242 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 7.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 PHILLIPS EXPLORATION INC Produced Fluid 17.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2011 PHILLIPS EXPLORATION INC Produced Fluid 18.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 17.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PHILLIPS EXPLORATION INC Produced Fluid 48.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid 57.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid 17.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2013 XTO ENERGY INC Produced Fluid 58.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2014 XTO ENERGY INC Produced Fluid 26.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2016 XTO ENERGY INC Produced Fluid 0.25 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 XTO ENERGY INC Produced Fluid 0.25 Bbl CENT WASTE TRT FAC NPDES PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1774219 Primary Facility 2009-03-06 Routine/Complete Inspection No Violations Noted Well-site staked, not constructed. Request for waiver of distance requirement from Greys Run. The E&S plan as compiled and drawn should minimize accelerated erosion and sedimentation and protect the stream from adverse impact, provided that the E&S plan is properly implemented and maintained.
1800760 Primary Facility 2009-05-21 Drilling/Alteration No Violations Noted drilling - rig skid/E&S ok/ID&pit ok
1806331 Primary Facility 2009-06-12 Drilling/Alteration No Violations Noted frac completed - not equipped/ID&pit ok/E&S ok
1815515 Primary Facility 2009-07-23 Routine/Complete Inspection No Violations Noted Well tag in place. Well is not equipped for production (well head only).
1838482 Primary Facility 2009-10-23 Routine/Complete Inspection No Violations Noted At the time of inspection, the well was drilled and properly tagged, but not in production. This well was a rig skid from a previously plugged unsuccessful well. The site was restored with 70% successful vegetative growth, but fabric filter fence had not yet been removed. The access road was in stable condition, but it is recommended that rip-rap culvert outlets be installed at the end of culvert pipes to replace filter fabric fence. No accelerated E&S issues were observed in relation to well site or access road.
2148617 Primary Facility 2013-03-08 Site Restoration No Violations Noted At time of inspection, well in production. Well tag present, legible. Located in ag field.

For data sources see[7]

References