37-063-36564

Well Details

Well ID: 37-063-36564
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: LITTLE 6
License Status:
Spud Date: 2009-11-02
Permit Date: 2009-06-10
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.432058
Longitude: -79.093991

For data sources see[1][2][3]

Well History

Date Event
2009-06-10 New Permit Application
2009-10-30 Performed Spud Operation
2009-11-09 Drilling Completion
2009-11-16 Perforation
2011-01-19 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENN VIEW EXPLORATION CORP 5,649.00 276 0.00 0 0.00 0
2011 PENN VIEW EXPLORATION CORP 3,026.89 365 0.00 0 0.00 0
2012 PENN VIEW EXPLORATION CORP 1,232.00 365 0.00 0 0.00 0
2013 PENN VIEW EXPLORATION CORP 1,130.00 365 0.00 0 0.00 0
2014 PENN VIEW EXPLORATION CORP 807.00 365 0.00 0 0.00 0
2015 PENN VIEW EXPLORATION CORP 583.00 365 0.00 0 0.00 0
2016 PENN VIEW EXPLORATION CORP 623.00 365 0.00 0 0.00 0
2017 PENN VIEW EXPLORATION CORP 626.00 365 0.00 0 0.00 0
2018 PENN VIEW EXPLORATION CORP 615.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENN VIEW EXPLORATION CORP Produced Fluid 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENN VIEW EXPLORATION CORP Produced Fluid 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2015 PENN VIEW EXPLORATION CORP Produced Fluid 40.00 Bbl ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1840922 Primary Facility 2009-11-04 Drilling/Alteration No Violations Noted Currently, E&L drilling currently at 1550 ft. Universal Drilling was in the process of cementing the 7¿ pipe. Well site was identified with well sign and E&S plan. No IW and E&S issues at the time of inspection. Pit aligned with 20 mil plastic and had no freeboard issues. Filter fence located topographically down gradient of site pad. Conductor pipe set at 42.28 ft. 9 5/8¿ pipe set at 412.30 ft with 150 sks class A with 9 bbl return. Water indicated at 120 ft. and 560 ft. No gas indicated nor voids on the boring logs. Stratigraphy consisted of shale, sandstone, limestone, and coal seams.
1840923 Primary Facility 2009-11-04 Drilling/Alteration No Violations Noted Currently, E&L drilling currently at 1550 ft. Universal Drilling was in the process of cementing the 7¿ pipe. Well site was identified with well sign and E&S plan. No IW and E&S issues at the time of inspection. Pit aligned with 20 mil plastic and had no freeboard issues. Filter fence located topographically down gradient of site pad. Conductor pipe set at 42.28 ft. 9 5/8¿ pipe set at 412.30 ft with 150 sks class A with 9 bbl return. Water indicated at 120 ft. and 560 ft. No gas indicated nor voids on the boring logs. Stratigraphy consisted of shale, sandstone, limestone, and coal seams.
1842219 Primary Facility 2009-11-02 Routine/Complete Inspection No Violations Noted At the time of inspection, the site was properly signed and E&S plan was available for review. The rig was setting up in preparation for drilling. Temporary stream crossing was correctly constructed. Filter fabric fence had been properly installed and functioning along with a grub/brush filter. No accelerated E&S issues were observed in relation to well site or access road, although operator should continue to monitor access road for erosion and sedimentation due to slope of roadway. Pits were properly constructed, but not yet lined, reminded operator to properly secure liner when placing in pit. All disturbed areas were temporarily seeded.
1928294 Primary Facility 2010-11-18 Site Restoration No Violations Noted During this inspection, well properly tagged and in production. Site restored with 70% vegetative cover. It is recommended that operator reseed cut slope in spring to ensure uniform coverage. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. No IW concerns noted. Brine tank stable. Operator may remove filter fence as 70% vegetative, permanent stabilization has been reached. Access road stable. Minor stream crossing(GP-7 approved) properly installed and functioning; appers riprap has been add to stream banks; therefore hay bale reinforced filter fence may be removed if permanent stabilization to stream bank/bottom is maintained along crossing
2038836 Primary Facility 2012-01-27 Routine/Complete Inspection No Violations Noted Drilling complete. Tag, tank, e&s ok. Filter fence should be removed.

For data sources see[7]

References