37-063-36701

Well Details

Well ID: 37-063-36701
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: FLORENCE MINING 3
License Status:
Spud Date: 2009-12-09
Permit Date: 2009-11-05
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.432344
Longitude: -79.090202

For data sources see[1][2][3]

Well History

Date Event
2009-11-05 New Permit Application
2009-12-08 Performed Spud Operation
2009-12-17 Drilling Completion
2009-12-22 Perforation
2010-09-28 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2010 PENNECO OIL CO INC 4,186.00 213 0.00 0 0.00 0
2011 PENNECO OIL CO INC 4,963.00 334 0.00 0 0.00 0
2012 PENNECO OIL CO INC 2,998.00 336 0.00 0 0.00 0
2013 PENNECO OIL CO INC 473.00 212 0.00 0 0.00 0
2014 PENNECO OIL CO INC 1,588.00 365 0.00 0 0.00 0
2015 PENNECO OIL CO INC 1,656.89 305 0.00 0 0.00 0
2016 PENNECO OIL CO INC 2,007.82 366 0.00 0 0.00 0
2017 PENNECO OIL CO INC 1,854.00 365 0.00 0 0.00 0
2018 PENNECO OIL CO INC 1,478.48 121 0.00 0 0.00 0
2019 PENNECO OIL CO INC 981.28 242 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENNECO OIL CO INC Produced Fluid 15.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PENNECO OIL CO INC Fracing Fluid Waste 1,170.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2013 PENNECO OIL CO INC Produced Fluid 96.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 PENNECO OIL CO INC Produced Fluid 96 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 127 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 127.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2015 PENNECO OIL CO INC Produced Fluid 84 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 84.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2018 PENNECO OIL CO INC Produced Fluid 75.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PENNECO OIL CO INC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1848827 Primary Facility 2009-12-08 Drilling/Alteration No Violations Noted Well permit granted on 11/5/09. Spud called for 12/8/09. Pad completed. E&S controls were implemented. Well stake and pit dug. Well sign and E&S plan located at the entrance of site. At the time of inspection, no E&S issues or IW issues.
1851523 Primary Facility 2009-12-22 Routine/Complete Inspection No Violations Noted At the time of inspection, the well was drilled but not set for production. Site was properly signed with E&S plan available for review. Access road was in stable condition. No E&S concerns with access road or well pad. Bmps were properly installed and functioning. Noted two pits onsite, recommended that operator monitor the pit freeboard as levels were near the 2ft of freeboard. I also recommend the operator utilized better measures to secure pit liners in order to prevent a potential pollution event. Inspector Paul Wyrwas was also onsite at time of inspection and indicated that on 12/23/2009 operator had plans to frac the well.
1851673 Primary Facility 2009-12-22 Drilling/Alteration No Violations Noted Well permit granted on 11/5/09. Spud called for 12/8/09. Pad completed. Well completed to target depth. Titan wire Line Company present to run geophysical study. Hydro frac is scheduled for 12/23/09. Well head set at 8¿ to 4¿ reducer and shut off. E&S controls were implemented. Well sign and E&S plan located at the entrance of site. At the time of inspection, no E&S issues or IW issues.
1941535 Primary Facility 2011-01-06 Routine/Complete Inspection No Violations Noted Well head consisted of 8¿ pipe reduced to 4 ¿pipe reduced to 2¿ production line. No signs of leakage from well head. Production equipment consisted of heater, separator (200 psi) and 100 bbl brine tank (< 10 bbl fluid). At the time of inspection, no E&S and IW issues at the site. Totalized show 5366 MCF and 542 MCF.
2102277 Primary Facility 2012-09-19 Routine/Complete Inspection No Violations Noted At the time, no issues with E&S. Gas well was in productions.
2318153 Primary Facility 2014-09-24 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S or IW issues at the site. Gas well was in production.
2503064 Primary Facility 2016-07-20 Routine/Complete Inspection No Violations Noted system running. no issues
2511817 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted system running. no issues

For data sources see[7]

References