If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-065-26835 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.963846,"lon":-79.108234,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Perry Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: SL STEWART 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-01-04 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.963846 | |
Longitude: -79.108234 |
Date | Event |
---|---|
2010-01-04 | New Permit Application |
2010-06-14 | Performed Spud Operation |
2010-06-17 | Drilling Completion |
2010-08-03 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 3,742.00 | 152 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 5,426.00 | 326 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 4,158.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 3,513.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 3,057.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 2,917.30 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 2,402.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,679.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,949.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 4.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 3.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 4.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 27.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2001624 | Primary Facility | 2011-09-08 | Routine/Complete Inspection | No Violations Noted | |
2133610 | Primary Facility | 2013-01-24 | Routine/Complete Inspection | No Violations Noted | |
2566708 | Primary Facility | 2017-03-02 | Routine/Complete Inspection | No Violations Noted | This well was drilled in an agricultural area behind R&S Machine off of Porter Road in June 2010. The well is in production with a brine tank installed. The tank was nearly empty at the time of inspection. The well is tagged with the correct DEP permit number. The long access road remains stabilized with rock. The site has been graded to final contours and stabilized by vegetation. The drain valve on the brine tank is locked closed and a bull plug installed. There have been no changes since the previous inspection on 1/24/2013. No violations were noted. |
For data sources see[7]