X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20496

Well Details

Well ID: 37-081-20496
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148833
Farm/Lease Name: DERR 8545H
License Status:
Spud Date:
Permit Date: 2011-01-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.239553
Longitude: -76.638603

For data sources see[1][2][3]

Well History

Date Event
2011-01-10 New Permit Application
2011-04-27 Performed Spud Operation
2011-05-12 Drilling Completion
2011-06-30 Perforation
2012-07-20 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2011 XTO ENERGY INC 213,071.00 70 0.00 0 0.00 0
2012 XTO ENERGY INC 754,813.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 486,936.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 415,191.00 363 0.00 0 0.00 0
2015 XTO ENERGY INC 333,875.00 345 0.00 0 0.00 0
2016 XTO ENERGY INC 273,236.00 355 0.00 0 0.00 0
2017 XTO ENERGY INC 229,666.00 358 0.00 0 0.00 0
2018 XTO ENERGY INC 236,007.41 365 0.00 0 0.00 0
2019 XTO ENERGY INC 200,925.10 363 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XTO ENERGY INC Produced Fluid 118.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2011 XTO ENERGY INC Produced Fluid 1,206.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011 XTO ENERGY INC Fracing Fluid Waste 2,464.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 XTO ENERGY INC Produced Fluid 131.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 XTO ENERGY INC Produced Fluid 2,026.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Produced Fluid 1,356.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Produced Fluid 970.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 121.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 XTO ENERGY INC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 114
2012 XTO ENERGY INC Produced Fluid 3,870.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 XTO ENERGY INC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 0114
2012 XTO ENERGY INC Produced Fluid 406.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 XTO ENERGY INC Produced Fluid 1,571.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 116.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2013 XTO ENERGY INC Produced Fluid 27.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 868.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 XTO ENERGY INC Produced Fluid 325.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 XTO ENERGY INC Produced Fluid 57.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 XTO ENERGY INC Produced Fluid 339.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 XTO ENERGY INC Produced Fluid 311.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2014 XTO ENERGY INC Produced Fluid 108.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2014 XTO ENERGY INC Produced Fluid 1,296.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 543.23 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 XTO ENERGY INC Produced Fluid 413.36 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 605.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 121.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015 XTO ENERGY INC Produced Fluid 1,034.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 754.91 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Other Oil & Gas Wastes 3.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 780.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 466.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 XTO ENERGY INC Produced Fluid 115.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2016 XTO ENERGY INC Produced Fluid 216.71 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 214.35 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 XTO ENERGY INC Produced Fluid 575.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 118.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 1,447.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 XTO ENERGY INC Produced Fluid 589.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 XTO ENERGY INC Produced Fluid 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 XTO ENERGY INC Produced Fluid 357.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 235.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 XTO ENERGY INC Produced Fluid 680.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 XTO ENERGY INC Produced Fluid 499.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 XTO ENERGY INC Produced Fluid 112.10 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 565.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 225.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Other Oil & Gas Wastes 96.00 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Produced Fluid 357.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 277.45 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Produced Fluid 140.00 Bbl INJECTION DISPOSAL WELL 34-133-20114

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1973446 Primary Facility 2011-05-17 Drilling/Alteration No Violations Noted
1987474 Primary Facility 2011-07-11 Follow-up Inspection Violation(s) Noted
2043066 Primary Facility 2012-02-15 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2074209 Primary Facility 2012-06-06 Routine/Complete Inspection No Violations Noted
2106598 Primary Facility 2012-10-05 Routine/Complete Inspection No Violations Noted
2135866 Primary Facility 2013-01-24 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2531213 Primary Facility 2016-10-20 Routine/Complete Inspection No Violations Noted Routine Inspection; 10/20/2016.

At the time of the inspection, the three wells (081-20275, 081-20348, 081-20496) onsite were in production. In addition, PCSM facilities and conveyances have been installed, seeded and stabilized. The construction of the PCSM features was being performed based on a modification to the ESCGP and a 2-years restoration extension which were approved on 9/19/2016. E&S controls were installed and functioning properly. Overall, the site is in good condition. No Violations Noted.

2625399 Primary Facility 2017-08-03 Site Restoration No Violations Noted Notice of Termination/Well Site Restoration inspection. Three wells are in production and the site has been restored according to the Site Restoration plans. The well site remains at the originally constructed size but justification was provided in the permitting process to keep the current size to accommodate production and maintenance of the wells as wells (including a workover/service rig). I recommend the Well Site Restoration and Notice of Termination for this site be approved. No violations noted.
2707330 Primary Facility 2018-03-19 Routine/Complete Inspection No Violations Noted Weather was 33°, partly sunny and windy at time of inspection. There were no XTO representatives on location at time of inspection. Well has two digital gauges attached, one read the pressure for the tubing and one read the pressure for the casing. Tubing pressure was 212 psi and casing pressure was 284 psi. There were two annular vents plumbed to surface that were both 2 inch pipe. 0% combustible gas was discovered in any location at time of inspection. No violations were noted at time of inspection.
2791547 Primary Facility 2018-10-19 Routine/Complete Inspection No Violations Noted Three wells stage for production. Three each sand and water separators within containment. No leaks detected from production equipment. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1987474 615224 07/11/2011 2011-07-11 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative Defective Cement: Gas found in the annular space of the 9 5/8 x 5 1/2 casing.

For data sources see[7]

References