If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-085-23362 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.433481,"lon":-80.407767,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Mercer | |
Municipality: West Salem Township | |
Operator Name: L & B ENERGY LLP | |
Well Pad ID: | |
Farm/Lease Name: MILLER 3 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2003-07-25 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.433481 | |
Longitude: -80.407767 |
Date | Event |
---|---|
2003-07-25 | New Permit Application |
2003-09-15 | Performed Spud Operation |
2003-09-19 | Drilling Completion |
2003-10-06 | Perforation |
2004-01-30 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2003 | CEDAR VALLEY ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2004 | CEDAR VALLEY ENERGY INC | 19911 | 365 | 348.78 | 365 | 0.00 | 0 |
2005 | CEDAR VALLEY ENERGY INC | 6601 | 365 | 111.51 | 365 | 0.00 | 0 |
2006 | CEDAR VALLEY ENERGY INC | 7466.00 | 365 | 131.00 | 365 | 0.00 | 0 |
2007 | CEDAR VALLEY ENERGY INC | 5248.00 | 365 | 58 | 365 | 0.00 | 0 |
2008 | CEDAR VALLEY ENERGY INC | 2965.00 | 365 | 62.91 | 365 | 0.00 | 0 |
2009 | CEDAR VALLEY ENERGY INC | 2099.00 | 365 | 69.49 | 365 | 0.00 | 0 |
2010 | CEDAR VALLEY ENERGY INC | 3,128.00 | 365 | 82.47 | 365 | 0.00 | 0 |
2011 | CEDAR VALLEY ENERGY INC | 2,199.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | CEDAR VALLEY ENERGY INC | 2,662.00 | 365 | 81.89 | 365 | 0.00 | 0 |
2013 | CEDAR VALLEY ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CEDAR VALLEY ENERGY INC | 1,470.00 | 365 | 55.22 | 365 | 0.00 | 0 |
2015 | CEDAR VALLEY ENERGY INC | 1,551.00 | 365 | 42.31 | 365 | 0.00 | 0 |
2016 | L & B ENERGY LLP | 1,601.00 | 365 | 41.00 | 365 | 0.00 | 0 |
2017 | L & B ENERGY LLP | 1,099.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | L & B ENERGY LLP | 1,692.00 | 365 | 60.02 | 365 | 0.00 | 0 |
2019 | L & B ENERGY LLP | 1,563.00 | 365 | 51.28 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2004 | CEDAR VALLEY ENERGY INC | Brine | 609.00 Bbl | Injection Disposal Well | 1893 1894 3203 |
2005 | CEDAR VALLEY ENERGY INC | Brine | 225.00 Bbl | Injection Disposal Well | |
2006 | CEDAR VALLEY ENERGY INC | Brine | 205.00 Bbl | Injection Disposal Well | |
2006 | CEDAR VALLEY ENERGY INC | Brine | 50.00 Bbl | Road Spreading | |
2008 | CEDAR VALLEY ENERGY INC | Brine | 113.00 Bbl | Other | 3415523795 |
2009 | CEDAR VALLEY ENERGY INC | Brine | 60.00 Bbl | Injection Disposal Well | OH-3415523795 |
2010 | CEDAR VALLEY ENERGY INC | Produced Fluid | 155.00 Bbl | Injection Disposal Well | 34-155-23795 |
2011 | CEDAR VALLEY ENERGY INC | Produced Fluid | 40.00 Bbl | Injection Disposal Well | 34-155-23203 |
2011 | CEDAR VALLEY ENERGY INC | Produced Fluid | 90.00 Bbl | Injection Disposal Well | 34-155-23795 |
2012 | CEDAR VALLEY ENERGY INC | Produced Fluid | 111.00 Bbl | Injection Disposal Well | 34-155-23795 |
2013 | CEDAR VALLEY ENERGY INC | Produced Fluid | 35.00 Bbl | Injection Disposal Well | 34-133-23614 |
2014 | CEDAR VALLEY ENERGY INC | Produced Fluid | 35.00 Bbl | Injection Disposal Well | 34-133-20525 |
2014 | CEDAR VALLEY ENERGY INC | Produced Fluid | 42.00 Bbl | Injection Disposal Well | 34-155-22403 |
2015 | CEDAR VALLEY ENERGY INC | Produced Fluid | 64.80 Bbl | Injection Disposal Well | 34-007-23262 |
2015 | CEDAR VALLEY ENERGY INC | Produced Fluid | 45.00 Bbl | Injection Disposal Well | 34-007-20919 |
2016 | L & B ENERGY LLP | Produced Fluid | 53.00 Bbl | Road Spreading | |
2017 | L & B ENERGY LLP | Produced Fluid | 52.00 Bbl | Injection Disposal Well | 34-007-21847 |
2017 | L & B ENERGY LLP | Produced Fluid | 39.00 Bbl | Injection Disposal Well | 34-007-20919 |
2018 | L & B ENERGY LLP | Produced Fluid | 31.00 Bbl | Injection Disposal Well | 34-007-21847 |
2019 | L & B ENERGY LLP | Produced Fluid | 83.00 Bbl | Road Spreading |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1270734 | Primary Facility | 2003-09-16 | Drilling/Alteration | No Violations Noted | |
1288046 | Primary Facility | 2003-11-19 | Administrative/File Review | No Violations Noted | well record review |
For data sources see[7]