If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-111-20286 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.941364,"lon":-79.229581,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Somerset | |
Municipality: Middlecreek Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 146300 | |
Farm/Lease Name: BOWERS WEST UNIT 1H | |
License Status: | |
Spud Date: 2010-06-05 | |
Permit Date: 2009-09-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.941364 | |
Longitude: -79.229581 |
Date | Event |
---|---|
2009-09-11 | New Permit Application |
2010-05-28 | Performed Spud Operation |
2010-06-26 | Drilling Completion |
2011-09-22 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 175,586.00 | 92 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 437,604.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 376,115.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 278,304.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 152,557.21 | 357 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 139,774.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 201,803.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 142,030.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 762.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 5,547.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 114.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 95.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 460.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,079.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 186.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 579.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 8,355.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 65.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Drill Cuttings | 16.97 Tons | LANDFILL | 100585 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 5,681.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,609.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | LPR ENERGY LLC | Produced Fluid | 1,499.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 977.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | LPR ENERGY LLC | Produced Fluid | 795.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2017 | LPR ENERGY LLC | Produced Fluid | 314.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | LPR ENERGY LLC | Produced Fluid | 505.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid | 208.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid | 206.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | LPR ENERGY LLC | Produced Fluid | 2,274.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2018 | LPR ENERGY LLC | Produced Fluid | 407.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | LPR ENERGY LLC | Produced Fluid | 1,860.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1889521 | Primary Facility | 2010-06-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well was not yet drilled. Patterson UTI was arriving onsite and setting up for drilling. Site was properly signed with E&S plan available for review. Access road appeared stable with sufficient gravel. All disturbed areas were temporarily seeded and mulched. Spoke with Lou of Chief about reinforcing filter sox with stakes, it was noted farmer had previously moved the filter sox¿s, and Chief was in the process of replacing in original position. No accelerated E&S issues were noted in relation to well site or access road. Also noted that area beneath rig was being plastic lined. Also Lou noted they are utilizing frack tanks at this site, first site in area with which they are doing so (NO FRAC PIT). Freshwater impoundment was properly lined and was being mulched/seed during inspection, pit was not full yet. Anticipates that drilling would commence in 2-3 days. (NOTE: ESCGP-1 SITE) |
1889979 | Primary Facility | 2010-06-08 | Drilling/Alteration | No Violations Noted | Spud called on 5/27/10. Drilling started on 6/4/10. Patterson #255 contracted to drill horizontal Marcellus well. Site ID sign located along Rte 281 and entrance to access road. E&S plan present. According to WQ personnel, April Wieland, filter socks were moved by landowner to mow the field near the site pad. However, the socks were not properly re-installed and staked into position as indicated by the E&S plan. DEP called Lou Shaw from Chief about the issue. Current depth was 1746 ft. Conductor pipe was installed at depth of 72 ft. and surface pipe was set at 400 ft. with 309 sacks of cement and 15 bbl return. Permit and log present at the site. Closed loop system with the cuttings going to Apex Landfill in Ohio. 30 mil plastic located underneath rig and closed loop system. At the time of inspection, no E&S or IW issues. |
1893491 | Primary Facility | 2010-06-18 | Drilling/Alteration | No Violations Noted | Spud called on 5/27/10. Drilling started on 6/4/10. Patterson #255 contracted to drill horizontal Marcellus well. Site ID sign located along Rte 281 and entrance to access road. E&S plan present. Current depth was 8828 ft. Patterson starting to build the curve. Conductor pipe was installed at depth of 72 ft. and surface pipe was set at 400 ft. with 309 sacks of cement and 15 bbl return. 9 5/8¿ pipe set at 2028 ft with 658 sacks of Type 1 with 30 bbl return. Permit and log present at the site. Closed loop system with the cuttings going to Apex Landfill in Ohio. 30 mil plastic located underneath rig and closed loop system. At the time of inspection, no E&S or IW issues. |
1899068 | Primary Facility | 2010-07-09 | Routine/Complete Inspection | Violation(s) Noted | During inspection well site was properly signed with E&S plan and ESCGP-1 onsite. Operator reported a spill (on 7/7/10 at 1600hrs) of approx 30 gallons of oil based mud. Violations will be issued for the release of pollutant onto the grounds of the commonwealth. According to operator, pollutant material was immediately excavated off ground, placed on felt onto a plastic liner which was enclosed with a liner on top of well pad, as seen today. (See Pictures). At time of inspection, material had not yet been transported to a facility nor was it secured from weather (ie runoff). While onsite spoke with contractor rep Bob Kennell, who was awaiting a dumpster to transport materials to an approved facility. Otherwise dept recommended that a pit be dug and lined accordingly, then place materials (as is in liner) in until proper disposal can be achieved in order to prevent runoff concerns. A follow up inspection is planned to ensure pollutions were disposed of properly and disturbed areas have been properly restored. |
1927860 | Primary Facility | 2010-11-10 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, site signed with ES plan and ESCGP1. Chief completion foreman, indicated well was recently flared. Frac tanks present onsite. Observed that pad is covered with a plastic and felt liner. No IW issues noted. Site has been seeded/mulched with slightly less than 70% vegetative growth observed. No accelerated erosion or sedimentation issues observed. Observed that sediment trap contains water. Recommend that operator continue to routinely monitor all bmps. Access road stable and adequately rocked. Site is monitored by security 24hrs a days. |
1953260 | Primary Facility | 2011-02-23 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, site ID sign, ESCGP-1, and Es plan present. Site secured with fence and gate to prevent unauthorized acts of third parties. Well drilled not yet in production. Containment felt located on pad surrounding well head. One tank located on site. No IW discharges observed. No accelerated erosion or sedimentation issues observed in relation to site or access road. Appears site has been seeded and mulched, some growth observed. ES controls in place and functioning. Recommend that operator continue to routinely monitor all bmps (ie sediment traps) until final permanent stabilization/restoration achieved. Access road stable and adequately rocked. Site and pad partially snow covered. |
1965778 | Primary Facility | 2011-04-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, site Id sign, ES plan, and ESCGP-1 onsite. Access road stable. Site is protected from third party access with fencing and locked gate. Well has been drilled not yet in production. Observed large sand pile on pad, recommend operator remove in order to prevent a possible pollution event. Also observed large quantity of PVC pipe located on site possibly for later use during fracing operations. Bmp¿s installed and functioning according to plan, operator should continue to monitor/maintain all temporary bmp¿s until final permanent site restoration is achieved¿including sediment traps (basins). No accelerated ES or IW issues observed. Previously disturbed areas surrounding well site have been seeded/mulched with observed growth. |
1986072 | Primary Facility | 2011-06-14 | Administrative/File Review | No Violations Noted | review of inactive status. approved |
2004315 | Primary Facility | 2011-09-13 | Routine/Complete Inspection | No Violations Noted | During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Well tag present. Site gated and locked. Well drilled not yet in production¿pipeline project underway adjacent to well site, well recently granted inactive status. Previously disturbed areas seeded/mulched and >70% vegetative growth observed. No accelerated erosion or sedimentation issues observed. Although noted a large soil and sand pile located on the upper left hand side of well pad (when facing well from access road entrance) that department recommends operator remove in order to prevent a possible pollution event. Two brine tanks located onsite¿located in a lined containment unit. Appears rainwater has begun to accumulate in containment unit due recent heavy rains; department is recommending operator properly dispose of water from unit. No violations noted during this inspection. |
2009462 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | No Violations Noted | well was not in production. pipeline has been installed to the pad. no site issues. |
2044428 | Primary Facility | 2012-02-22 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, site Id sign, ESCGP-1, ES and PPC plan present. Site gated, currently unlocked. No security present. Well drilled and equipped for production, currently in regulatory inactive status. Production equipment located within metal containment dike. Operator shall continue to closely monitor and properly dispose of collected water located within dike. Pad adequately rocked. Previously disturbed areas surrounding the site have been seeded/mulched with adequate growth. Temporary bmp's removed. No accelerated erosion or sedimentation issues noted. Shared access road stable, again no accelerated erosion or sedimentation issues noted. As noted to Chevron reps in an early inspection, large soil and sand pile located at north eastern corner still exists has not yet been removed. In order to prevent a possible pollution event again department recommends operator properly dispose of piles. No violations noted during this inspection |
2067348 | Primary Facility | 2012-05-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2071735 | Primary Facility | 2012-05-30 | Routine/Complete Inspection | No Violations Noted | No issues noted with this inspection. |
2082697 | Primary Facility | 2012-07-12 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2094675 | Primary Facility | 2012-08-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, gas well was in production and no E&S issues were present. |
2164051 | Primary Facility | 2013-05-06 | Routine/Complete Inspection | No Violations Noted | Conducted a routine inspection. No issues of the site were noted. |
2168448 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | routine inspection with Curtis Small with Chevron. No isues noted. |
2171279 | Primary Facility | 2013-06-03 | Routine/Complete Inspection | No Violations Noted | Met with Brian Rankin with Chevron at this site. Inspectied the well pad and impoundment. No issues were noted. Brian state that the impoundment will be reclaimed. |
2182342 | Primary Facility | 2013-07-10 | Routine/Complete Inspection | No Violations Noted | Chevron was putting up a chain link fence around the flow back impoundment. No other issues noted. |
2183477 | Primary Facility | 2013-07-15 | Routine/Complete Inspection | No Violations Noted | Inspected the site and met with Grant Johnpeer with Chevron and inspected the site. Chevron hired a contractor to install a chain link fence around there impoundment. The contractor has the poles installed |
2206740 | Primary Facility | 2013-09-24 | Routine/Complete Inspection | No Violations Noted | Inspected the site on 9/24/13. Late Summer dry conditions were present. |
2212560 | Primary Facility | 2013-10-15 | Routine/Complete Inspection | No Violations Noted | Inspected the site on 10/15/13. Early Fall dry conditions existed the day of the inspection.. |
2297818 | Primary Facility | 2014-08-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, gas well was in production and no E&S issues were present. |
2310802 | Primary Facility | 2014-10-01 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2323959 | Primary Facility | 2014-11-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, gas well was in production and no E&S issues were present. |
2382922 | Primary Facility | 2015-06-15 | Routine/Complete Inspection | No Violations Noted | no issues. system running |
2451794 | Primary Facility | 2016-02-17 | Routine/Complete Inspection | No Violations Noted | no issues. system runnign |
2486277 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2532166 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2560995 | Primary Facility | 2017-02-07 | Routine/Complete Inspection | In Compliance with Policy | Single well Marcellus site.
Site ID sign, well permit, ERP, PPC plan, E&S plan on site. At time of inspection no E&S issues observed on shared access road. Well pad gated. Well pad rocked, no E&S issues observed. Well appears to be in production. Well head protected by cement barriers. Well tag present and legible. Two brine tanks located in secondary containment. Brine tanks appear structurally sound. Three unmarked barrels (approx. 42 gal each) are located on well pad near brine tanks. These barrels are not in secondary containment. Department contacted Operator Rep Matt Gary by phone from site. Department requested follow up call from Operator as to the contents of the 3 unmarked barrels. Violations may be issued pending Operator response. UPDATE 2-13-17: Department contacted Operator Rep Clayton Hill by phone to inquire about contents of unmarked barrels. Mr. Hill stated 2 of the barrels contained spill kits and one was empty. Inspection Result being updated to ICP; Operator appears to be In Complia |
2594460 | Primary Facility | 2017-04-25 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2605023 | Primary Facility | 2017-06-15 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2626033 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | well was in production. no issues at the site. |
2655825 | Primary Facility | 2017-11-02 | Routine/Complete Inspection | No Violations Noted | Well in production. No issues at the site. |
2672171 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | Well appears to be in production. Well pad surrounded by security fence. |
2672205 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | System running. No issues. Well tag present |
2683522 | Primary Facility | 2018-01-18 | Routine/Complete Inspection | No Violations Noted | System running no issues. Well tag present. Emergency contact sign present. |
2700669 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Well tag present and emergency contact information present. No issues at the site |
2710654 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | Well tag and emergency contact number present at the site. No issues at the site |
2719542 | Primary Facility | 2018-04-18 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well pad surrounded by security fence. Well head surrounded by cement barriers. |
2728418 | Primary Facility | 2018-05-09 | Routine/Complete Inspection | No Violations Noted | Well was in production. Well tag and emergency contact present. No issues at the site |
2827780 | Primary Facility | 2019-01-16 | Routine/Complete Inspection | No Violations Noted | Well is in production. No issues at the site |
2853792 | Primary Facility | 2019-03-14 | Routine/Complete Inspection | No Violations Noted | System running. Well in production. Production reports submitted to state. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1899068 | 591421 | 07/09/2010 | 2010-07-09 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | |
1899068 | 591422 | 07/09/2010 | 2010-07-09 | 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
591421 | 260344 | NOV - Notice of Violation | Comply/Closed | 2010-07-19 | |||
591422 | 260344 | NOV - Notice of Violation | Comply/Closed | 2010-07-19 |
For data sources see[7]