Well Details

Well ID: 37-111-20306
Loading map...
County: Somerset
Municipality: Addison Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149073
Farm/Lease Name: PMG GRACE UNIT 3H
First Permit Date: 2011-06-23
Last Permit Date: 2011-06-23
Spud Date: 2011-07-23
Unconventional: Yes
Configuration: Horizontal
Well Status: ACTIVE
Violations: 0
Latitude: 39.757722
Longitude: -79.356572

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 402159.0 177.0 0.0 0.0 0.0 0.0
2014-1 301458.0 181.0 0.0 0.0 0.0 0.0
2014-2 230099.0 184.0 0.0 0.0 0.0 0.0
2015-02 18107.0 28.0 0.0 0.0 0.0 0.0
2015-01 32954.0 31.0 0.0 0.0 0.0 0.0
2015-03 22872.0 31.0 0.0 0.0 0.0 0.0
16-Jan 22311.0 31.0 0.0 0.0 0.0 0.0
15-Aug 22034.0 31.0 0.0 0.0 0.0 0.0
15DECU 20364.0 31.0 0.0 0.0 0.0 0.0
15JULU 27429.0 31.0 0.0 0.0 0.0 0.0
15MAYU 26758.0 31.0 0.0 0.0 0.0 0.0
15OCTU 73942.0 31.0 0.0 0.0 0.0 0.0
15OCTU 73942.0 31.0 0.0 0.0 0.0 0.0
15SEPU 28862.0 30.0 0.0 0.0 0.0 0.0
16APRU 0.0 0.0 0.0 0.0 0.0 0.0
16APRU 14512.51 28.0 0.0 0.0 0.0 0.0
16FEBU 20128.0 29.0 0.0 0.0 0.0 0.0
16MARU 25410.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1997384 2011-08-04 No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI. Toby Trip was representative for Chief. Conductor pipe set at 40 ft. (20﾿﾿pipe) and was grouted in place. 13 3/8﾿ pipe set at 410﾿ and used 315 sks of gas block (Universal cement) with 15 bbl. 9 5/8﾿ pipe is going to be set at 2,144 feet with Universal performing cement using gas block. Deviation of hole is less than 1 %. DEP performed a site walk and did not find any issues. Current depth was 2,110 feet.
2003965 2011-09-08 No Violations Noted At the time of inspection, Well ID Sign, ES plan, and ESCGP-1 present. Access road entrance and roadway appear adequately rocked and stable. Well drilled and actively being vented while onsite, not yet in production. Temporary BMPs installed according to plan (both 12in and 18in compost soxs) and functioning. Noted ﾿stressed﾿ vegetation alongside and surrounding sediment traps. It appears as possible evidence that sediment traps are not properly functioning and/or water is improperly draining to traps. Although no (active) accelerated erosion or sedimentation issues are noted during this inspection, due to recent heavy rains, it is recommend that operator examine and monitor sediment traps and areas surrounding to ensure that proper drainage is occurring in order to prevent a possible pollution event. Noted red staining at toe slope of pad, again previously attributed to decomposition of mulch/tress. Accompanied by WQS Marc Maestra during inspection.
2016748 2011-11-03 No Violations Noted At the time of inspection, well sign (multi- well pad), ES Plan, ESCGP-1, PPC Plan present. Site gated and locked, as well as monitored by security. Access road and well pad adequately rocked and maintained. Well drilled. Well head surrounded by metal fence. No accelerated erosion or sedimentation issues noted during inspection. Bmp's are installed and appear to be functioning, although operator should continue to monitor and maintain all bmp's until final permanent restoration is complete. Previously disturbed areas have been temporarily seeded/mulched with observed growth. No violations noted during this inspection
2067337 2012-05-04 No Violations Noted At the time of inspection, no E&S issues were present at the site. Well head was modified in order to drill gas well 2H.
2078301 2012-06-20 No Violations Noted
2094696 2012-08-06 No Violations Noted At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
2094822 2012-08-14 No Violations Noted At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
2095548 2012-08-28 No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron had contracted Crown Rig #8. Current depth was 8200 feet. KOP was set at 8143 feet and TOM is estimated at 8700 ft. Currently, Chevron was in the process of changing drilling bit.


2107591 2012-10-09 No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2123143 2012-12-12 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2144619 2013-02-25 No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all on-site.

At time of inspection, 3H drilled, but not yet equipped for production. 1H, 2H also drilled, not yet equipped for production. Access road in good condition, adequately rocked. No accelerated erosion or sedimentation issues observed in relation to well pad or access road. Department recommends Operator remove debris from rock-lined ditches. Spoke to company representative Beth Smock on 2/8/13 who informed Department that a 20x20 stone pad muster point was constructed alongside access road directly before well pad entrance. At time of inspection, Department noted that muster point did not go outside LOD and observed no potential E&S issues from its construction. Dept representative Samantha Foulk field-approved this change to the E&S plan. (Refer to ESCGP-1 admin inspection ID 2150218).

2160675 2013-04-23 Pending Incident inspection. Company reported a 10 gallon spill. Company could not find spill location. Asked company to locate spill.
2163937 2013-05-02 No Violations Noted Follow up inspection to a 4/21/13 spill. Spill Cleaned up correctely.
2169701 2013-05-22 No Violations Noted
2182697 2013-07-11 No Violations Noted Met with Chevron on site. No issues noted.
2229830 2013-09-26 No Violations Noted At the time of inspection, no E&S issues were present at the site. Well was in production.


2311294 2014-10-08 No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[2]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-2 DRILLING FLUID WASTE 364.5 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-1 DRILLING FLUID WASTE 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 DRILLING FLUID WASTE 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILL CUTTINGS 574.09 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2012-2 DRILLING FLUID WASTE 100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 FRACING FLUID WASTE 220.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 108.7 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 FRACING FLUID WASTE 538.9 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 FRACING FLUID WASTE 7.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 PRODUCED FLUID 5.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FLOWBACK FRACTURING SAND 33.56 Tons LANDFILL 100280 VALLEY LANDFILL IRWIN PA
2014-1 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 26.67 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH
16APRU PRODUCED FLUID (IN BARRELS) RWC 802 35.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER MOUNT PLEASANT PA
16MAYU PRODUCED FLUID (IN BARRELS) RWC 802 102.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER MOUNT PLEASANT PA