X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-01881

Well Details

Well ID: 37-125-01881
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: South Strabane Township
Operator Name: DALLAS ENERGY LLC
Well Pad ID:
Farm/Lease Name: W.J. MUNCE 20
License Status: ABANDONED
Spud Date:
Permit Date:
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.199739
Longitude: -80.202242

For data sources see[1][2][3]

Well History

Date Event
1901-09-01 Drilling Completion
1992-10-22 OLD WELL

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1996 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1997 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1998 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1999 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
2000 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
2001 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2002 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2003 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2005 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2006 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2007 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2008 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2010 EAST RESOURCES MGMT LLC 0.00 0 0.00 0 0.00 0
2011 SWEPI LP 0.00 0 0.00 0 0.00 0
2012 SWEPI LP 0.00 0 0.00 0 0.00 0
2013 SWEPI LP 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 0.00 0 0.00 0 0.00 0
2017 SWEPI LP 0.00 0 0.00 0 0.00 0
2018 DALLAS ENERGY LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2624368 Primary Facility 2017-08-09 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ has water tank,cribbing and pipe tub moved onto location.
2633331 Primary Facility 2017-09-06 Plugging(Includes Plugged/Mined Through) In Compliance with Policy ConServ fishing for 3 1/2" taper mill lodged in collapsed 5" casing @ 413'. Will flush hole w/ fresh water and run downhole camera later today.
2644287 Primary Facility 2017-09-11 Plugging(Includes Plugged/Mined Through) In Compliance with Policy ConServ rig TIH with 3 7/8" mill to condition damaged area in 5" casing @~385'. Tried earlier to run downhole camera, but could not safely go below damaged area.
2649377 Primary Facility 2017-09-13 Plugging(Includes Plugged/Mined Through) In Compliance with Policy ConServ had milled with 3 7/8" mill to 402', TOOH, TIH with bit sub on tubing, slowly swiveled and washed down to fish (3 1/2" mill and mud anchor). Pushed fish from 414'-431'. Could not screw onto lost mill, TOOH. TIH with magnet, set down @ 414', TOOH with magnet-nothing. TIH with bit sub again to try to screw onto lost mill.

For data sources see[6]

References