X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-22161

Well Details

Well ID: 37-125-22161
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Somerset Township
Operator Name: RICE DRILLING B LLC
Well Pad ID:
Farm/Lease Name: GEORGE T FAWCETT JR 1
License Status: ACTIVE
Spud Date:
Permit Date: 2004-08-16
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.156638
Longitude: -80.021184

For data sources see[1][2][3]

Well History

Date Event
2004-08-16 New Permit Application
2005-01-06 Performed Spud Operation
2005-01-11 Drilling Completion
2005-05-03 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2005 RICHARD H BURKLAND 3421 365 0.00 0 0.00 0
2011 RICHARD H BURKLAND 1,964.00 334 0.00 0 0.00 0
2012 RICHARD H BURKLAND 2,020.00 366 0.00 0 0.00 0
2013 1,527.00 365 0.00 0 0.00 0
2014 1,522.90 303 0.00 0 0.00 0
2015 1,189.00 337 0.00 0 0.00 0
2016 381.00 334 0.00 0 0.00 0
2017 RICE DRILLING B LLC 1,353.00 336 0.00 0 0.00 0
2018 RICE DRILLING B LLC 1,227.00 152 0.00 0 0.00 0
2019 RICE DRILLING B LLC 243.00 122 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1398885 Primary Facility 2004-11-30 Routine/Complete Inspection No Violations Noted Location is cut & access in process of connecting to main road. Topsoil is stockpiled & pit excavated w/restored gates & fewncing below. Muddy conditions. Divert. ditch at bottom above main road. Staked for rig. Muddy conditions.
1415705 Primary Facility 2005-02-05 Routine/Complete Inspection No Violations Noted Almond Rd. access now stoned upgrade through two corale gates. Bench completed, awaiting rig, topsoil stockpiled.

For data sources see[6]

References