37-125-24303

Well Details

Well ID: 37-125-24303
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Robinson Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147136
Farm/Lease Name: ROBINHILL 21H
License Status:
Spud Date:
Permit Date: 2010-10-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.466861
Longitude: -80.351417

For data sources see[1][2][3]

Well History

Date Event
2010-10-19 New Permit Application
2010-12-14 Performed Spud Operation
2011-02-17 Drilling Completion
2011-04-11 Perforation
2011-04-11 Performed Stimulation
2012-03-27 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-04-13 2011-04-13 5,840 3,611,396

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand Proppant 100.00 10.48
Used to open perfs
Scale Inhibitor
Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Water Carrier/Base Fluid 100.00 89.52
Biocide
Water Viscosifier Hydrochloric acid 7647-01-0 32.00 1.31
Carboxymethylhydroxyporoyl guar bln 100.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00600000
Polyethylene glycol 25322-68-3 60.00 0.01
Ethylene glycol 107-21-1 30.00 0.00600000
Dibromoacetonitrile 3252-43-5 5.00 0.00100000
Iron Control Agent

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-04-11 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 43,316.00 17 0.00 0 724.73 17
2012 CHEVRON APPALACHIA LLC 519,389.00 366 0.00 0 1,572.25 366
2013 CHEVRON APPALACHIA LLC 296,612.00 365 0.00 0 446.16 365
2014 CHEVRON APPALACHIA LLC 345,234.00 365 114.51 184 1,229.70 365
2015 CHEVRON APPALACHIA LLC 217,390.00 281 331.58 130 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,305.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-24355
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,035.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-24355
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 85.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 CHEVRON APPALACHIA LLC Produced Fluid 78.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CHEVRON APPALACHIA LLC Produced Fluid 1,300.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Produced Fluid 537.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 7,820.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 340.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 8,534.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Produced Fluid 615.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-24355
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 345.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 CHEVRON APPALACHIA LLC Produced Fluid 5,365.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013 CHEVRON APPALACHIA LLC Produced Fluid 1,084.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 2,370.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015 CHEVRON APPALACHIA LLC Produced Fluid 895.00 Bbl INJECTION DISPOSAL WELL 34-121-23995

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1938168 Primary Facility 2010-12-16 Drilling/Alteration No Violations Noted Randsom - Well spud, site still under construction , E&S in place on main pad,
1944794 Primary Facility 2010-11-16 Complaint Inspection No Violations Noted
1951144 Primary Facility 2011-01-13 Routine/Complete Inspection No Violations Noted On January 13th, 2011 I conducted an inspection of the above site. A portion of the fill side of the pad had sliped during construction. I met with Atlas representatives Gary Bowlen, Chad Eisenman, and Nick Staffieri on site. The fill side was still an estimated 14' below the proposed finished elevation. Multiple scarp faces were evident with a vetical separation of over 20' at the greatest. All material that moved stayed within the limit of disturbance. Some material had entered the interceptor channel at the base of the slope. No streams or watercourses are in close proximity to the base of the slope. The material that slid appeared dry and no springs or seeps were observed. The operator is to install additional E&S controls around the base of the slide and forward the reconstruction plan once designed.
1953092 Primary Facility 2011-01-25 Routine/Complete Inspection No Violations Noted On January 25th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th, 2011. Additioanl E&S controls were installed on the lower edge at the toe of the slip. During excavation and reconstruction the material began to move again. A scarp face of approximately 4' had developed. Constructed had halted until the engineers can evaluate the soil conditions and formualte a new plan for the excavation.
1957864 Primary Facility 2011-02-04 Routine/Complete Inspection No Violations Noted On February 4th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th and 25th, 2011. The lower side of the pad continues to slip during excavation. Construction efforts had been stopped. Temporary E&S controls put in place will remain in place until drilling is completed. After drilling is completed reclamation procedures are to start immediately, The rig was moving onsite today. A Site ID and E&S plan were posted onsite. The access road was in good condition. No spills/ leaks were observed at the time of inspection.
1958492 Primary Facility 2011-02-09 Routine/Complete Inspection No Violations Noted On February 9th, 2011 I conducted a follow up inspection of the site in response to the slide and inspections on January 13th and 25th, 2011. No new movement was observed. Construction efforts had been stopped. Temporary E&S controls put in place will remain in place until drilling is completed. After drilling is completed reclamation procedures are to start immediately. Drilling was started. A Site ID and E&S plan were posted onsite. The access road was in good condition. The pit appeared to be in good condition. No spills/ leaks were observed at the time of inspection.
1961856 Primary Facility 2011-03-10 Routine/Complete Inspection No Violations Noted On March 10th 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig had moved offsite. The drill cuttings were being removed with an excavator and being hauled offsite. No additional movement was observed on the slide. The access road was in good condition. A site ID and E&S plan were posted on site. Excess runoff from the pad was beginning to crate a ditch and flow around the sediment trap. Some material upslope of the sediment trap had slid into the trap. Water flowing around the trap was undermining the filter sock and flowing into a wooded area approx 200¿. No streams or watercourses close. Crews were on site immediately to divert water into the sediment trap, a diversion was built at the top of the pad, and repairs and additions were made to the filter sock.
1961858 Primary Facility 2011-03-11 Routine/Complete Inspection No Violations Noted On March 11th 2011 I conducted a follow up inspection of the above site in response to the inspection on 3/10/2011. Straw bales had been added to the slope approaching the sediment trap to divert water into the trap. Straw bales had been added behind the filter sock below the sediment trap and repairs were made to the sediment trap. No more erosion was evident. All activities were within the limit of disturbance
1992019 Primary Facility 2011-06-27 Routine/Complete Inspection No Violations Noted On June 27th 2011 I conducted a routine inspection of the above site. Drilling was completed and production units were being installed. The pit was closed. The slide on the fill slope was not yet repaired awaiting restoration of the site. The access road was in good condition, Site ID and E&S plan were posted on site. No erosion was leaving site and was contained within the E&S controls. The operator should continue to monitor and inspection the E&S controls routinely and after each runoff event until site restoration is complete and permanent stabilization is established.
2083597 Primary Facility 2012-07-12 Routine/Complete Inspection No Violations Noted Looked at small slide on Robinhill #21. Small enough that they don't need a ESCPG-01. I will continue to monitor.
2085188 Primary Facility 2012-07-20 Routine/Complete Inspection No Violations Noted
2094821 Primary Facility 2012-08-22 Routine/Complete Inspection No Violations Noted On August 22, 2012, I stopped for a routine inspection at Chevron’s Robinhill #21; I met with Blake Loke, Matthew Barch and others.
2163803 Primary Facility 2013-04-16 Routine/Complete Inspection No Violations Noted
2212401 Primary Facility 2013-10-09 Routine/Complete Inspection No Violations Noted
2300600 Primary Facility 2014-07-29 Site Restoration No Violations Noted
2353960 Primary Facility 2015-03-19 Routine/Complete Inspection No Violations Noted

For data sources see[9]

References