37-125-27183

Well Details

Well ID: 37-125-27183
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Carroll Township
Operator Name: EQT PROD CO
Well Pad ID: 145213
Farm/Lease Name: R SMITH
License Status:
Spud Date:
Permit Date: 2013-11-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.164825
Longitude: -79.944736

For data sources see[1][2][3]

Well History

Date Event
2013-11-26 New Permit Application
2013-12-06 Performed Spud Operation
2014-04-01 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-07-14 2014-08-11 7,673 13,689,000 0
2 2014-09-28 2014-10-08 7,925 9,599,630 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HVG-1 FTS International Gelling agent Guar gum 9000-30-0 50 0.00386903 4902.58
Petroleum distillate 64742-47-8 55 0.00425593 5392.84
Surfactant 68439-51-0 2 0.000154761 196.103
Clay 14808-60-7 2 0.000154761 196.103
FE-100L FTS International Iron control Citric acid 77-92-9 55 0.000647531 820.51
CS-500-SI FTS International Scale inhibitor Ethylene glycol 107-21-1 10 0.00202089 2560.75
ICI-3240 FTS International Biocide Dazomet 533-74-4 24 0.00629245 7973.39
Sodium hydroxide 1310-73-2 4 0.00104874 1328.9
FRW-600 FTS International Friction reducer Ammonium acetate 631-61-8 6 0.00245321 3108.56
Hydrotreated light distillate 64742-47-8 30 0.0122661 15542.8
FRW-900 FTS International Friction reducer Hydrotreated light distillate 64742-47-8 30 0.0137133 17376.6
Oxyalkylated alcohol A Proprietary 5 0.00228555 2896.11
Alkyl alcohol Proprietary 10 0.00457111 5792.22
NE-100 FTS International Non-emulsifier Dodecylbenzenesulfonic acid 27176-87-0 5 0.00001597 20.241
2-Propanol 67-63-0 10 0.00003195 40.482
2-Butoxyethanol 111-76-2 10 0.00003195 40.482
Sand (Proppant) FTS International Proppant Silica Substrate 14808-60-7 100 9.52203 12,065,700.0
Hydrochloric Acid (15%) FTS International Acidizing Hydrochloric Acid 7647-01-0 15 0.0274822 34823.7
Water FTS International Carrier/Base Fluid Water 7732-18-5 100 90.152 114,235,000.0
APB-1 FTS International Breaker Ammonium persulfate 7727-54-0 95 0.000120705 152.95
CI-150 FTS International Acid corrosion inhibitor Isopropanol 67-63-0 30 0.00010171 128.88
Dimethylformamide 68-12-2 10 0.00003390 42.96
Quaternary ammonium compound Proprietary 10 0.00003390 42.96
Aromatic aldehyde Proprietary 10 0.00003390 42.96
Organic amine resin salt Proprietary 30 0.00010171 128.88
Ethylene glycol 107-21-1 30 0.00010171 128.88
2 Hydrochloric Acid (15%) FTS International Acidizing Hydrochloric Acid 7647-01-0 15 0.0284631 25448.1
Chlorine Dioxide Solution - SVP-Pure Neptune Disinfectant and/or oxidizer Chlorine dioxide 10049-04-4 0.3 0.00001441 12.881
CI-150 FTS International Acid corrosion inhibitor Isopropanol 67-63-0 30 0.00010534 94.182
Organic amine resin salt Proprietary 30 0.00010534 94.182
Quaternary ammonium compound Proprietary 10 0.00003511 31.394
Dimethylformamide 68-12-2 10 0.00003511 31.394
Aromatic aldehyde Proprietary 10 0.00003511 31.394
Ethylene glycol 107-21-1 30 0.00010534 94.182
FE-100L FTS International Iron control Citric acid 77-92-9 55 0.000626959 560.546
ICI-3240 FTS International Biocide Dazomet 533-74-4 24 0.00229448 2051.43
Sodium hydroxide 1310-73-2 4 0.000382413 341.905
APB-1 FTS International Breaker Ammonium persulfate 7727-54-0 95 0.00172056 1538.3
Water FTS International Carrier/Base Fluid Water 7732-18-5 100 89.6 80,108,900.0
FRW-900 FTS International Friction reducer Hydrotreated light distillate 64742-47-8 30 0.0241797 21618.4
Oxyalkylated alcohol A Proprietary 5 0.00402995 3603.06
Alkyl alcohol Proprietary 10 0.0080599 7206.13
CS-500-SI FTS International Scale inhibitor Ethylene glycol 107-21-1 10 0.000256579 229.4
HVG-1 FTS International Gelling agent Guar gum 9000-30-0 50 0.00432454 3866.45
Surfactant 68439-51-0 2 0.000172982 154.658
Petroleum distillate 64742-47-8 55 0.00475699 4253.09
Clay 14808-60-7 2 0.000172982 154.658
Sand (Proppant) FTS International Proppant Silica Substrate 14808-60-7 100 10.1005 9,030,540.0
NE-100 FTS International Non-emulsifier Dodecylbenzenesulfonic acid 27176-87-0 5 0.00001478 13.218
2-Propanol 67-63-0 10 0.00002957 26.437
2-Butoxyethanol 111-76-2 10 0.00002957 26.437

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 EQT PROD CO 0.00 0 0.00 0 0.00 0
2014 EQT PROD CO 400,735.00 70 0.00 0 0.00 0
2015 EQT PROD CO 2,873,934.00 365 0.00 0 0.00 0
2016 EQT PROD CO 1,924,802.00 347 0.00 0 0.00 0
2017 EQT PROD CO 1,095,385.00 365 0.00 0 0.00 0
2018 EQT PROD CO 794,086.00 361 0.00 0 0.00 0
2019 EQT PROD CO 879,621.00 313 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 EQT PROD CO Drill Cuttings 644.66 Tons LANDFILL 100419
2014 EQT PROD CO Drill Cuttings 83.50 Tons LANDFILL 100277
2014 EQT PROD CO Drilling Fluid Waste 130.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Fracing Fluid Waste 165.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 220.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2014 EQT PROD CO Produced Fluid 9,233.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2015 EQT PROD CO Produced Fluid 300.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 EQT PROD CO Produced Fluid 220.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2015 EQT PROD CO Produced Fluid 2,200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Fracing Fluid Waste 230.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 16,878.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2016 EQT PROD CO Drilling Fluid Waste 30.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 289.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 292.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Produced Fluid 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 EQT PROD CO Other Oil & Gas Wastes 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 229.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 5,749.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 770.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 320.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 EQT PROD CO Other Oil & Gas Wastes 340.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Synthetic Liner Materials 15.02 Tons LANDFILL 100277
2017 EQT PROD CO Other Oil & Gas Wastes 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 8.42 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 EQT PROD CO Produced Fluid 47.23 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 EQT PROD CO Produced Fluid 6,085.55 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 157.95 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 91.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Other Oil & Gas Wastes 10.45 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 EQT PROD CO Produced Fluid 295.59 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 10.45 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 55.17 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EQT PROD CO Produced Fluid 178.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 1.69 Bbl INJECTION DISPOSAL WELL 34-167-28462
2019 EQT PROD CO Produced Fluid 18.43 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 15.65 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 EQT PROD CO Other Oil & Gas Wastes 19.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 9.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Produced Fluid 421.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 5.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Other Oil & Gas Wastes 207.50 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 554.80 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2231133 Primary Facility 2013-12-19 Drilling/Alteration No Violations Noted Alpha-Hunter drilling for EQT using CLS and flare stack . Currently TIH @ 1313. Projecting to land the 95/8 section and 1675 +/-. Containment under rig and support equipment. Cellars and conductors set on three other holes on pad. Existing well on pad. No violations at time of inspection.
2261587 Primary Facility 2014-03-27 Drilling/Alteration No Violations Noted Pioneer 72 drilling for EQT using closed loop system and flare stack. Currently TIH @ 5874. BOP tested good at nipple up. Containment under rig and support equipment in good condition.
2340242 Primary Facility 2015-01-30 Routine/Complete Inspection No Violations Noted Violations for todays inspection linked to site inspection 2340109 enforcement 319619
2343347 Primary Facility 2015-02-10 Routine/Complete Inspection No Violations Noted Well in production. Well in compliance with environmental regulations.
2350221 Primary Facility 2015-03-10 Routine/Complete Inspection No Violations Noted
2350354 Primary Facility 2015-02-24 Routine/Complete Inspection No Violations Noted
2361142 Primary Facility 2015-04-14 Routine/Complete Inspection No Violations Noted On April 14th 2015, I inspected the Robert Smith Pad in response to an NOT request and made the following observations:
2363376 Primary Facility 2015-02-10 Routine/Partial Inspection No Violations Noted On 2/10/15 took water samples from well (tap in garage) based on analysis code 946.
2363391 Primary Facility 2015-03-12 Administrative/File Review No Violations Noted On 3/12/15 administrative review of lab results with WQS Bryon Miller did not indicate that gas well activities have impacted the water supply at this time.
2402140 Primary Facility 2015-08-14 Compliance Evaluation No Violations Noted On 8/14/15, I inspected the Robert Smith site as a compliance evaluation inspection in response to the remediation report for a spill occurring on 1/31/15 and made the following observations:
2544060 Primary Facility 2016-09-14 Incident- Response to Accident or Event No Violations Noted On 9/14/16 I performed an incident response inspection at the Robert Smith Site in response to an operator reported spill (CTS ID: 322335) and made the following observations:

•On 9/6/16 EQT Corey Giles reported a spill of 100 gallons of produced fluids to the well pad. The spill was forwarded to the WQS on 9/14/16. This constitutes a violation of 25 Pa. Code § 78.57(a) and 25 Pa. Code § 78.54 for failing to control brine and other fluids resulting in discharge to the ground and failure to prevent pollution to the Waters of the Commonwealth. •The spill was cleaned up at the time of inspection with the only observed indicator of the spill location being an area of new gravel on the pad near the production units. No violation. •Well drilling was ongoing at the time of inspection. •During general pad inspection it was noted that multiple production tanks had orange streaking running down their sides from the top of the tanks. The gravel of the pad surface near the containment displayed matching orange stai

2614149 Primary Facility 2017-05-05 Incident- Response to Accident or Event In Compliance with Policy On 5/5/17 an INCDT inspection of the R. Smith well site was conducted in response to CTS ID: 326715. The following was observed:

>> Site was undergoing fracking at time of inspection.

>>The spill in question involved roughly 10 gallons of produced water being sprayed from from an overfilled accessory tank on the pad. Affected pad materials were collected and placed in a waste box on pad for disposal. No violation, site appears to be in compliance with policy.

>>Streaking was again noted on the outside of multiple production tanks similar to streaking noted in previous inspections.

2660129 Primary Facility 2017-11-09 Routine/Complete Inspection No Violations Noted On 11/10/17 a routine complete inspection of the R. Smith well site was conducted in response to notification additional drilling on site. The following was observed:

>>A box tank was found near the impoundment with no containment. Remediation recommended, no violation.

>>A new top soil stock pile was noted on site. It was stabilized with straw at the time of inspection.

>>The soil stock pile was noted to not have any functional controls below it other than an adequate vegetated strip. Decomposed CFS should be removed, repaired, or replaced. No violation.

>>Drilling was ongoing at the site at the time of inspection.

2691645 Primary Facility 2018-02-02 Routine/Complete Inspection No Violations Noted Well has been fracked and is producing.
2705442 Primary Facility 2018-03-13 Routine/Partial Inspection No Violations Noted On 3/14/18 a routine complete inspection of the R. Smith Well Site was conducted in response to a notification of proposed construction activity on the pad. The following was observed:

>>The site was in a high activity phase at the time of inspection drilling appeared to be completed and the site was in apparent transition to post drilling activities. No drilling rig was present on site at the time of inspection.

>>Construction of a proposed AST had not begun at the time of inspection.

>>Many water trucks were present on site in association with the attached impoundment.

2737813 Primary Facility 2018-05-16 Incident- Response to Accident or Event No Violations Noted On 5/16/18 an incident inspection of the R. Smith well site was conducted in response to a spill reported by the operator on 5/14/18. The following was observed:

>>The operator reported that roughly 35 gallons of mixed rain water and produced water was spilled to the pad when a section of containment was moved without being drained first. Fluids were spread over a large area of the pad along the area in front of the production units per discussion with Mike Cromley at the time of inspection. This does constitute a violation of 25 Pa. Code § 78.54 and 25 Pa. Code § 78.57(a) in that the operator failed to control regulated materials in a manner that prevents prevents pollution to the ground or Waters of the Commonwealth however, the violation is regarded as immediately corrected.

>>Site inspection found no residual evidence of the spill. The operator reported that all visibly impacted gravel from the spill area had been removed (roughly two clamshell dumpsters).

2747158 Primary Facility 2018-06-29 Routine/Partial Inspection No Violations Noted On 6/29/18 a routine partial inspection of the R. Smith Well Site was conducted in response to concerns about runoff raised by a nearby resident. The following was observed:

>>An unstabilized soil pile near the corner of the pad with a newly improved drain. Controls below the pile were absent though the vegetation was sufficient. No violation, remediation recommended.

>>Another only partially stabilized soil pile with no controls below the pile was located along the accessory pad access road. No controls beyond vegetation were present below the soil pile. No violation, monitoring recommended.

>>An AST was present on the accessory pad.

>>The pad was active at the time of inspection with drilling preparations ongoing. A sound wall was present around the pad perimeter.

2761847 Primary Facility 2018-08-02 Routine/Complete Inspection No Violations Noted On 8/2/18 a complaint response inspection was conducted of the R Smith well site in response to reported concerns of inappropriate drainage from the pad. WQSS John Carson accompanied. The following was observed:

>>A top soil pile on the access road to the accessory pad remained lacking vegetation and with spotty temporary stabilization. The vegetative strip below remains in good condition. Remediation recommended, no violation.

>>Emptying partially filled containment is encouraged to aid in identifying any possible leaks. No violation.

>>No evidence of excessive or unpermitted runoff from the pad was found.

>>Box in containment appears to be collecting emergency blowdown. If so it should be properly marked. No violation.