Operator Name: EQT PROD CO
Well Pad ID: 148479
Farm/Lease Name: HAYWOOD 592445
License Status:
Spud Date:
Permit Date: 2014-10-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.178733
Longitude: -79.976103

For data sources see[1][2][3]

Well History

Date Event
2014-10-28 New Permit Application
2014-12-17 Performed Spud Operation
2015-04-15 New Permit Application
2015-06-19 Drilling Completion
2015-09-04 Perforation
2015-09-06 Performed Stimulation
2016-04-11 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-06 2015-09-17 7,737 7,855,220 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FFR760 Keane Group Friction reducer Oxyalkylated alcohol A Proprietary 5 0.00302933 2230.81
Hydrotrated light distillate 64742-47-8 30 0.018176 13384.8
Alkyl alcohol Proprietary 10 0.00605865 4461.61
Sand (Proppant) Keane Group Proppant Silica substrate 14808-60-7 100 10.5751 7,787,560.0
Water Keane Group Carrier/Base Fluid Water 7732-18-5 100 89.0161 65,551,800.0
Hydrochloric Acid (15%) Keane Group Acidizing Hydrochloric acid 7647-01-0 15 0.0343715 25311.3
EC6330A Keane Group Scale inhibitor Ethylene glycol 107-21-1 5 0.00118007 869.008
Sodium phosphate, tribasic 7601-54-9 5 0.00118007 869.008
MC MX 437-5 Multi-Chem Group Calcium nitrate solution Calcium nitrate 10124-37-5 60 0.056919 41915.4
AI 250 Keane Group Acid corrosion inhibitor Ethoxylated nonylphenol 68412-54-4 13 0.00006877 50.639
Isopropyl alcohol 67-63-0 40 0.000211586 155.813
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00005290 38.953
Glycol ethers 111-76-2 40 0.000211586 155.813
Propargyl alcohol 107-19-7 40 0.000211586 155.813

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-09-06 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 EQT PROD CO 0.00 0 0.00 0 0.00 0
2015 EQT PROD CO 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 2,009,883.00 330 0.00 0 0.00 0
2017 EQT PROD CO 629,180.00 320 0.00 0 0.00 0
2018 EQT PROD CO 313,683.00 343 0.00 0 0.00 0
2019 EQT PROD CO 450,241.00 352 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 EQT PROD CO Drilling Fluid Waste 765.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Drill Cuttings 209.00 Tons LANDFILL 100592
2015 EQT PROD CO Fracturing Fluid Waste 34.27 Tons LANDFILL 101571
2015 EQT PROD CO Drill Cuttings 389.00 Tons LANDFILL 100663
2015 EQT PROD CO Fracing Fluid Waste 745.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Drill Cuttings 241.00 Tons LANDFILL 100172
2016 EQT PROD CO Servicing Fluid 110.00 Tons REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 557.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Other Oil & Gas Wastes 210.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 1,390.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Produced Fluid 16,387.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 533.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Other Oil & Gas Wastes 140.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 1.82 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 EQT PROD CO Produced Fluid 1,300.45 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 72.28 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 40.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 1.53 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 EQT PROD CO Other Oil & Gas Wastes 5.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 EQT PROD CO Other Oil & Gas Wastes 2.38 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2018 EQT PROD CO Other Oil & Gas Wastes 0.95 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Other Oil & Gas Wastes 6.67 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 EQT PROD CO Produced Fluid 3.82 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Other Oil & Gas Wastes 78.47 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 241.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 27.19 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Other Oil & Gas Wastes 5.24 Bbl INJECTION DISPOSAL WELL 2D0859721
2019 EQT PROD CO Produced Fluid 155.35 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 EQT PROD CO Other Oil & Gas Wastes 40.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 10.48 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 18.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Other Oil & Gas Wastes 191.94 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 3.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 40.90 Bbl INJECTION DISPOSAL WELL 2D0859721
2019 EQT PROD CO Produced Fluid 29.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 4.57 Bbl INJECTION DISPOSAL WELL 34-105-23619
2019 EQT PROD CO Other Oil & Gas Wastes 57.14 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 EQT PROD CO Produced Fluid 1.47 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 EQT PROD CO Produced Fluid 266.11 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 609.22 Bbl INJECTION DISPOSAL WELL 34-105-23619
2019 EQT PROD CO Produced Fluid 167.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2330929 Primary Facility 2014-12-22 Drilling/Alteration No Violations Noted Himes Diversified auger rig
2342461 Primary Facility 2015-02-06 Drilling/Alteration No Violations Noted Alpha Hunter Rig #4
2344563 Primary Facility 2015-02-17 Drilling/Alteration No Violations Noted Alpha Hunter Rig #4
2383738 Primary Facility 2015-06-30 Drilling/Alteration No Violations Noted Savanna Drilling Rig #803
2395343 Primary Facility 2015-07-31 Routine/Complete Inspection No Violations Noted On 7/31/15, I inspected the Harold Haywood site as a routine inspection and made the following observations:
2471490 Primary Facility 2015-12-11 Routine/Partial Inspection No Violations Noted On 12/11/15, I performed a routine partial inspection of the Harold Haywood Site in response to observed activity on the pad and made the following observations:
2549496 Primary Facility 2016-12-06 Routine/Partial Inspection No Violations Noted On 12/6/16, I performed a routine partial inspection of the Harold Haywood in response to observed activity on site and made the following observations:

•A drilling rig was being constructed on site at the time of inspection. •A large panel had been set on the pad near the juncture of the pad and access road with a chemical container, multiple metal drums, and multiple pieces of oil covered equipment. A small amount of oil had reached the pad surface. The situation was pointed out to site personnel and was then promptly remediated including removal of all visibly impacted pad material. No violation. •A coil of hose was also found off containment dripping oily material to the pad surface and was promptly removed. No violation.

2552992 Primary Facility 2016-12-16 Follow-up Inspection No Violations Noted On December 16, 2016 I performed a follow up inspection at the Howard Haywood site in response to concerns noted in a previous inspection (ID: 2549486) of the site on 12/6/16 and made the following observations:

•On 12/6/16 multiple issues with containment and minor spills were noted to site personnel and immediately remediated. •Near the junction of the site access road and the pad a large metal plate had been placed so that it was crushing and compromising the containment around multiple pallets of chemicals marked “AES Drilling Fluids”. Multiple other empty chemical storage containers were also found without any containment. This is a violation of 58 Pa. C.S. § 3218.2(d) for failing to provide containment with at least 110% capacity on regulated substances. •A spill of more than ten gallons of antifreeze was found off of containment near the drill rig. The situation was immediately communicated to site personnel for remediation. This constitutes a violation of 25 Pa. Code § 78.57(a) and 25 Pa. Code

2586081 Primary Facility 2017-04-24 Routine/Partial Inspection No Violations Noted On 4/24/17 a RTPT inspection was conducted of the Harold Haywood site. The following was observed.

>Multiple areas along the access road bear sparse or patchy vegetation increasing risk of erosion. No violation, remediation recommended.

>A topsoil pile near the pad entrance is only partially stabilized with straw. No violation, remediation recommended.

> Drilling activity was concluded at the time of inspection and removal of drilling and completion equipment was underway.

> The AST remained on site at time of inspection.

2688458 Primary Facility 2018-01-30 Routine/Complete Inspection No Violations Noted On 1/30/18 a routine complete of the Haywood Pad was conducted, the following was observed:

>>Substantial equipment was found stored around the site including multiple lifts and vehicles as well as numerous lights, generators, and tanks. An above ground storage tank was found on site as well. Most equipment had adequate secondary containment. Some stored equipment did not, any leaked or spilled fluids would constitute a violation.

>>Wells on site appeared to be in various stages of completion with no rig on site.

2698961 Primary Facility 2017-09-05 Administrative/File Review No Violations Noted On 9/5/17 an administrative inspection related to the Harold Haywood was conducted regarding test results related to complaint ID 328174. No evidence was found in the sample results suggesting impact to the water supply by oil and gas activity.
2722535 Primary Facility 2018-03-27 Complaint Inspection No Violations Noted On 3/27/18 a complaint inspection was conducted in relation to the Harold Haywood Well Site in response to CTS ID: 332966. Sample 3401-071 was collected for chemistry and biological analysis.
2767359 Primary Facility 2018-08-15 Routine/Partial Inspection No Violations Noted On 8/15/18 a routine partial inspection of the Harold Haywood Site was conducted in response to increased activity at the pad. The following was observed:

>>The site was in drilling phase at the time of inspection. High activity was noted on the pad. A drilling rig was active on site at the time of inspection.

>>Multiple containers of contaminated equipment were found off containment resulting in minor impacts to the pad. This constitutes a violation of 25 Pa. Code § 78.54 and 25 Pa. Code § 78.57(a) in that the operator failed to control regulated materials in a manner that prevents pollution to the ground and Waters of the Commonwealth. Any equipment with the potential to cause pollution including equipment contaminated with petroleum residues should be placed and stored on containment. Runoff from improperly stored equipment will result in violations.

>>Staining found on the pad near the office trailer suspected to be petroleum based (material was hydrophobic and greasy). This constitutes a viola

2790090 Primary Facility 2018-05-01 Administrative/File Review No Violations Noted On 5/1/18 an administrative inspection related to the Haywood site was conducted to analyze results from sample 3401071 related to complaint ID 332966 collected on 3/27/18. Sample analysis found that while the water did not meet state drinking water standards no clear indicators of oil and gas impact were present.
2805687 Primary Facility 2018-11-02 Incident- Response to Accident or Event No Violations Noted On 11/2/18 a complaint inspection of the Harold Haywood well site was conducted in response an operator reported spill. The following was observed:

>>On 10/31/18 an EQT representative reported that 15 gallons of "impaired water" was spilled to the pad.

>>At the time of inspection an operator representative reported that the standing water along the bottom of the AST was found to have very high conductivity during a routine check. The impacted water was pumped out. Field testing of standing water at the time of inspection found water at the site of the initial spill remained impacted with conductivity reading at roughly 1040us. Per the representative the standing water at the time of inspection was believed to be rain water from storms after the initial spill. The impacted water at the time inspection was substantially greater than the 15 gallons initially reported and was in addition to the initial spill. This constitutes a violation of 25 Pa. Code § 78.54 and 25 Pa. Code § 78.57(a) in that the opera

2831184 Primary Facility 2019-01-22 Compliance Evaluation No Violations Noted On 1/22/19 a compliance evaluation inspection of the Harold Haywood Well Site was conducted in response to violations recorded on 11/2/18 and 12/16/16. The following was observed:

>>No apparent residual impact related to spill violations from either date were observed. Containment around the AST on site may conceal further impact. No violation.

>>Violations related to non-GPU containment were remediated around time of 12/16/16 inspection and addressed with the operator at the time.

>>GPUs on site continued to lack containment at the time of inspection including on units installed post 10/2016. Violations ongoing.

2845213 Primary Facility 2019-02-19 Routine/Complete Inspection No Violations Noted Well and pad appear to be in good condition. There are 8 flow back tanks on site and 1 large water tank.
2863152 Primary Facility 2018-09-07 Administrative/File Review No Violations Noted On 9/7/18 an administrative inspection related to the Harold Haywood Pad was conducted to analyze sample and case information pertaining to a water supply complaint (CTS ID: 332966). No evidence of impact was found.