If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27991 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.278972,"lon":-79.759583,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Sewickley Township | |
Operator Name: DIVERSIFIED OIL & GAS LLC | |
Well Pad ID: 146957 | |
Farm/Lease Name: SHUGLIE 4 | |
License Status: | |
Spud Date: 2009-08-03 | |
Permit Date: 2009-07-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.278972 | |
Longitude: -79.759583 |
Date | Event |
---|---|
2009-07-21 | New Permit Application |
2009-07-31 | Performed Spud Operation |
2009-08-27 | Drilling Completion |
2010-02-25 | Newly Drilled |
2010-04-01 | Perforation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | ATLAS RESOURCES LLC | 92,732.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | ATLAS RESOURCES LLC | 35,219.00 | 281 | 0.00 | 0 | 0.00 | 0 |
2013 | ATLAS RESOURCES LLC | 30,566.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2014 | ATLAS RESOURCES LLC | 22,226.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ATLAS RESOURCES LLC | 10,137.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ATLAS RESOURCES LLC | 7,859.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2017 | ATLAS RESOURCES LLC | 6,130.00 | 183 | 0.00 | 0 | 0.00 | 0 |
2018 | DIVERSIFIED OIL & GAS LLC | 8,126.00 | 305 | 0.00 | 0 | 0.00 | 0 |
2019 | DIVERSIFIED OIL & GAS LLC | 6,402.49 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | Fracing Fluid Waste | 4,780.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010 | ATLAS RESOURCES LLC | Fracing Fluid Waste | 4,750.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | ATLAS RESOURCES LLC | Fracing Fluid Waste | 2,885.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2010 | ATLAS RESOURCES LLC | Fracing Fluid Waste | 630.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | ATLAS RESOURCES LLC | Drilling Fluid Waste | 150.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010 | ATLAS RESOURCES LLC | Drilling Fluid Waste | 885.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | ATLAS RESOURCES LLC | Fracing Fluid Waste | 3,242.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | ATLAS RESOURCES LLC | Fracing Fluid Waste | 3,353.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | ATLAS RESOURCES LLC | Produced Fluid | 1,598.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | ATLAS RESOURCES LLC | Produced Fluid | 4,070.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011 | ATLAS RESOURCES LLC | Produced Fluid | 173.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | ATLAS RESOURCES LLC | Produced Fluid | 399.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | ATLAS RESOURCES LLC | Produced Fluid | 943.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | ATLAS RESOURCES LLC | Produced Fluid | 815.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | ATLAS RESOURCES LLC | Produced Fluid | 650.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2012 | ATLAS RESOURCES LLC | Fracing Fluid Waste | 1,002.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | ATLAS RESOURCES LLC | Produced Fluid | 2,677.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | ATLAS RESOURCES LLC | Produced Fluid | 325.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | ATLAS RESOURCES LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013 | ATLAS RESOURCES LLC | Produced Fluid | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013 | ATLAS RESOURCES LLC | Produced Fluid | 3,050.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | ATLAS RESOURCES LLC | Produced Fluid | 2,563.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | ATLAS RESOURCES LLC | Produced Fluid | 731.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | ATLAS RESOURCES LLC | Produced Fluid | 345.00 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1818788 | Primary Facility | 2009-08-05 | Complaint Inspection | No Violations Noted | Marcellus Superior was cementing water casing when I arrived on loc. E&S controls are good, access road has stone the whole way, road is clear of debris, atlas put sound barrier between light plant and neighbors house to block noise. Land owner John is happy with atlas. Reserver pit is good. |
1818789 | Primary Facility | 2009-07-31 | Drilling/Alteration | No Violations Noted | marcellus no rig on site yet, E&S controls are good. pits are lined and fenced. access road has gravel the whole way to the wellsite. |
1826735 | Primary Facility | 2009-08-27 | Drilling/Alteration | No Violations Noted | MARCELLUS UDI 45 HIT TD. HAVING TROUBLE WITH CROOKED HOLE. RECORDED DRAG ON TROUBLE BIT TRIP AT DEPTH OF 7243 ST WT 136K DRAG 105K PULL WT 241K. SITE LOOKS GOOD CREW SAID NEIGHBORS HAVE KEPT THEIR DISTANCE SINCE THE INCIDENT. 300SKS WITH 0 BBL RETURN ON 16" |
1833293 | Primary Facility | 2009-09-28 | Routine/Complete Inspection | No Violations Noted | Drilling completed not in production. There are no signs of erosion and sedimentation on the access road and well site. There are two pits on site both are within freeboard requirements and liners are properly embedded. E&S plan on site and E&S controls are in place and functioning adequately. As per conversation with Atlas America Inc. the drill cuttings were solidified and encapsulated. A freshwater pit was then constructed in the same location as the waste pit. A copy of the OG-71 was reviewed to confirm the solidification of the drill cuttings. Auth. ID 806088. |
1835558 | Primary Facility | 2009-10-08 | Routine/Complete Inspection | No Violations Noted | Drilling completed not in production. There are no signs of erosion and sedimentation on the access road and well site. There are two pits on site both are within freeboard requirements and liners are properly embedded. The freshwater pits were being filled at the time of inspection. E&S plan on site and E&S controls are in place and functioning adequately. |
1835827 | Primary Facility | 2009-10-15 | Routine/Complete Inspection | No Violations Noted | Drilling completed not in production. There are no signs of erosion and sedimentation on the access road and well site. There are two pits on site both are within freeboard requirements and liners are properly embedded. No sign of the water level dropping in either pit. Raining at the time of inspection. E&S plan on site and E&S controls are in place and functioning adequately. |
1874971 | Primary Facility | 2010-04-06 | Complaint Inspection | No Violations Noted | The Department conducted an investigation in relation to a complaint. The complainant stated that high amounts of dust were being blown on to his property. The Department contacted the operator and noted that the well was in the process of being fractured. |
1875885 | Primary Facility | 2010-04-02 | Routine/Complete Inspection | No Violations Noted | rig on site, running coil tubing |
1884909 | Primary Facility | 2010-05-14 | Routine/Complete Inspection | No Violations Noted | The operator submitted a request for a six month site restoration extension on 4/7/10 due to pipeline and frac equipment scheduling difficulties. The well reached total depth on 8/27/09 and the ID sign and E&S plan was on site. All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event. The following extension has been approved, and the deadline for the site restoration is 11/27/10. The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion along with weekly inspections and inspections that follow any significant precipitation that might cause a runoff event. |
2132710 | Primary Facility | 2013-01-23 | Incident- Response to Accident or Event | No Violations Noted | On 1/22/13 Atlas called in a small 3 gallon diesel fuel spill on the the well pad. Inspected site. Spill was cleaned up with no visible staining observed. |
2395129 | Primary Facility | 2015-08-03 | Site Restoration | No Violations Noted | Inspection in response to the Operators submission of a "Well Site Restoration Report on 7/22/2015. At the time of inspection earth disturbance activities at the site authorized by the Well Permit are complete, the site has been stabilized and the Post Construction Stormwater Management BMP's have been installed. |
2736437 | Primary Facility | 2018-06-01 | Routine/Complete Inspection | No Violations Noted | Well appears to be in good working condition. |
For data sources see[7]