If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28014 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.341938,"lon":-79.651143,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Penn Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: JAMES KING 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-08-04 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.341938 | |
Longitude: -79.651143 |
Date | Event |
---|---|
2009-08-04 | New Permit Application |
2009-08-18 | Performed Spud Operation |
2009-08-26 | Drilling Completion |
2009-09-02 | Perforation |
2013-05-31 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PENNECO OIL CO INC | 6071.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PENNECO OIL CO INC | 19,485.00 | 334 | 137.93 | 334 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 12,429.00 | 334 | 118.25 | 334 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 11,280.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 8,622.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 7,298.00 | 365 | 2.49 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 3,982.64 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 5,826.19 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 4,936.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 4,243.62 | 365 | 5.75 | 62 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 3,555.61 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | PENNECO OIL CO INC | Drilling | 1,140.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | PENNECO OIL CO INC | Brine | 190.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | PENNECO OIL CO INC | Produced Fluid | 442.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 85.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | PENNECO OIL CO INC | Produced Fluid | 155.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2013 | PENNECO OIL CO INC | Produced Fluid | 90 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 90.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 26.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 26 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 55 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 55.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2016 | PENNECO OIL CO INC | Produced Fluid | 116 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2016 | PENNECO OIL CO INC | Produced Fluid | 116.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2017 | PENNECO OIL CO INC | Produced Fluid | 146.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | PENNECO OIL CO INC | Produced Fluid | 75.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | PENNECO OIL CO INC | Produced Fluid | 150.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1822363 | Primary Facility | 2009-08-21 | Drilling/Alteration | No Violations Noted | E&S, PITS, EVERYTHING GOOD. DAVE HILL DRILLING IS DOING A GOOD JOB. |
1824049 | Primary Facility | 2009-08-27 | Routine/Complete Inspection | No Violations Noted | Drilling rig was pulling off-site at time of inspection. The well is not equipped for production. Silt fence has been installed correctly. The entire access road is topped with clean, durable rock. At this time there are no Erosion & Sedimentation concerns. |
1826667 | Primary Facility | 2009-08-26 | Drilling/Alteration | No Violations Noted | DAVE HILL DRILLING AHEAD. EVERYTHING LOOKS GOOD. DAVE CALLED IN ALL CEMENT JOBS |
2492925 | Primary Facility | 2016-06-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site, within earthen dike and appears to be structurally sound. No E&S issues in relation to site and/or access road. |
2655248 | Primary Facility | 2017-11-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within earthen dike and appears to be structurally sound. No E&S issues. |
For data sources see[7]