If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28411 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.332028,"lon":-79.095972,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Fairfield Township | |
Operator Name: MONONA LLC | |
Well Pad ID: 149371 | |
Farm/Lease Name: STICKLE 1H | |
License Status: | |
Spud Date: 2010-10-07 | |
Permit Date: 2010-08-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.332028 | |
Longitude: -79.095972 |
Date | Event |
---|---|
2010-08-10 | New Permit Application |
2010-10-07 | Performed Spud Operation |
2010-12-24 | Drilling Completion |
2011-01-21 | Perforation |
2013-06-03 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-01-21 | 2011-01-21 | 12,740 | 6,650,000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFR-55LA &WFR-55LA (W) | Weatherford | Anionic Water-Soluble Polymer | Anionic water-soluble polymer | 0.22 | |||
Hydrochloric Acid | Weatherford | Acidizing | Hydrochloric acid | 7647-01-0 | 36.70 | 0.89 | ||
Iron Control - WIC-641L | Weatherford | Organic Acid | Citric acid | 77-92-9 | 50.00 | 0.00680000 | ||
WBK-133, Breaker | FMC Corporation | Polymerization Initiator and Gel Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 0.00760000 | |||
Inhibitor - WAI-251LC | Weatherford | Corrosion Inhibitor | 2-Butoxyethanol | 111-76-2 | 5.00 | |||
1-Decanol | 112-30-1 | 7.00 | ||||||
Ethylene glycol | 107-21-1 | 40.00 | 0.00140000 | |||||
1-Octanol | 111-87-5 | 7.00 | ||||||
Preprietary Component | 13.00 | |||||||
N,N-Dimethylformamide | 68-12-2 | 30.00 | ||||||
Isopropanol | 67-63-0 | 7.00 | ||||||
WGS-165L | Weatherford | Oxygen Scavenger | Ammonium bisulfite | 10192-30-0 | 55.00 | 0.01 | ||
BioClear 5000 | Weatherford | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 10.00 | |||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.04 | |||||
WGA-15L | Weatherford | Water Gelling Agent | Distillates, petroleum, hydrotreated light | 64742-47-8 | 70.00 | 0.09 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | BURNETT OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | BURNETT OIL CO INC | 364,761.64 | 220 | 0.00 | 0 | 0.00 | 0 |
2012 | BURNETT OIL CO INC | 447,830.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | BURNETT OIL CO INC | 296,818.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | BURNETT OIL CO INC | 246,619.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | BURNETT OIL CO INC | 204,349.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | BURNETT OIL CO INC | 135,406.00 | 308 | 0.00 | 0 | 0.00 | 0 |
2017 | BURNETT OIL CO INC | 121,287.00 | 314 | 0.00 | 0 | 0.00 | 0 |
2018 | MONONA LLC | 127,964.00 | 331 | 0.00 | 0 | 0.00 | 0 |
2019 | MONONA LLC | 92,603.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | BURNETT OIL CO INC | Produced Fluid | 5,503.81 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2011 | BURNETT OIL CO INC | Produced Fluid | 10,307.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | BURNETT OIL CO INC | Produced Fluid | 690.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | BURNETT OIL CO INC | Produced Fluid | 3,015.50 Bbl | INJECTION DISPOSAL WELL | 2D0855151 |
2012 | BURNETT OIL CO INC | Produced Fluid | 8,000.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | BURNETT OIL CO INC | Produced Fluid | 580.00 Bbl | INJECTION DISPOSAL WELL | 2D0855151 |
2013 | BURNETT OIL CO INC | Produced Fluid | 940.00 Bbl | INJECTION DISPOSAL WELL | 2D0550319 |
2013 | BURNETT OIL CO INC | Produced Fluid | 30.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | BURNETT OIL CO INC | Produced Fluid | 1,109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2013 | BURNETT OIL CO INC | Produced Fluid | 300.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | BURNETT OIL CO INC | Produced Fluid | 30.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2013 | BURNETT OIL CO INC | Produced Fluid | 405.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2013 | BURNETT OIL CO INC | Produced Fluid | 235.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | BURNETT OIL CO INC | Produced Fluid | 180.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | BURNETT OIL CO INC | Fracturing Fluid Waste | 78.03 Tons | LANDFILL | 100434 |
2013 | BURNETT OIL CO INC | Produced Fluid | 180.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | BURNETT OIL CO INC | Produced Fluid | 475.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW010 |
2013 | BURNETT OIL CO INC | Produced Fluid | 493.50 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2014 | BURNETT OIL CO INC | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | BURNETT OIL CO INC | Produced Fluid | 572.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2014 | BURNETT OIL CO INC | Produced Fluid | 985.50 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2014 | BURNETT OIL CO INC | Produced Fluid | 162.50 Bbl | INJECTION DISPOSAL WELL | 2D0855151 |
2014 | BURNETT OIL CO INC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2014 | BURNETT OIL CO INC | Produced Fluid | 172.50 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2014 | BURNETT OIL CO INC | Produced Fluid | 553.50 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2015 | BURNETT OIL CO INC | Produced Fluid | 230.00 Bbl | INJECTION DISPOSAL WELL | 34-133-23614 |
2015 | BURNETT OIL CO INC | Produced Fluid | 3,029.10 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2015 | BURNETT OIL CO INC | Produced Fluid | 225.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | BURNETT OIL CO INC | Produced Fluid | 3,029.10 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | BURNETT OIL CO INC | Produced Fluid | 278.00 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2015 | BURNETT OIL CO INC | Produced Fluid | 155.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2015 | BURNETT OIL CO INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2015 | BURNETT OIL CO INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2016 | BURNETT OIL CO INC | Produced Fluid | 3,120.98 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2016 | BURNETT OIL CO INC | Produced Fluid | 3,120.98 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2016 | BURNETT OIL CO INC | Produced Fluid | 112.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | BURNETT OIL CO INC | Produced Fluid | 2,205.02 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | BURNETT OIL CO INC | Produced Fluid | 1,355.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | MONONA LLC | Produced Fluid | 200.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | MONONA LLC | Produced Fluid | 320.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | MONONA LLC | Produced Fluid | 207.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | MONONA LLC | Produced Fluid | 1,657.53 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1923931 | Primary Facility | 2010-10-13 | Drilling/Alteration | Pending | MARCELLUS - currently @ 2488ft/E&S ok/ID&pit ok |
1926070 | Primary Facility | 2010-10-27 | Drilling/Alteration | Violation(s) Noted | Drilling/E&S ok/ID and pit ok/casing violation |
1927576 | Primary Facility | 2010-10-28 | Routine/Complete Inspection | No Violations Noted | Performed a routine inspection during drilling operation. Drill pit lined and meets minimum 2¿ freeboard, 1 upslope freshwater pit being constructed at time of inspection. Temporary E&S BMP¿s in place and functioning adequately (silt socks, supersilt fence). |
1930285 | Primary Facility | 2010-11-04 | Drilling/Alteration | No Violations Noted | E&S AND HOUSE KEEPING GOOD. SMALL RIG IS OFF LOCATION, WAITING ON THE BIG RIG |
1930304 | Primary Facility | 2010-11-01 | Drilling/Alteration | No Violations Noted | E&S AND HOUSE KEEPING GOOD. NORTHEAST MOVING OFF SMALL RIG SO THE BIG RIG CAN MOVE ON. DEPTH 5600' |
1939320 | Primary Facility | 2010-12-02 | Drilling/Alteration | No Violations Noted | SAVANNA RIG DRILLING ON STICKLE PAD FOR BURNETT OIL, DEPTH 8492. |
2006717 | Primary Facility | 2011-09-30 | Routine/Complete Inspection | No Violations Noted | PRODUCED FLUIDS TANK DIKED |
2010365 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2012709 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | No Violations Noted | : Site visit was in response to spud notification. Jason Brannan DEP Inspector was present during inspection. |
2013987 | Primary Facility | 2011-10-24 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2024182 | Primary Facility | 2011-12-06 | Routine/Complete Inspection | No Violations Noted | E& S inspection. No violations noted. |
2174382 | Primary Facility | 2013-06-12 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2176069 | Primary Facility | 2013-06-18 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2217631 | Primary Facility | 2013-10-30 | Routine/Complete Inspection | No Violations Noted | This was a routine inspection. Met on site with Danny Hopkins, Production Superintendent with Burnett. |
2332344 | Primary Facility | 2014-12-29 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks and associated production equipment appeared to be in sound condition. |
2541717 | Primary Facility | 2016-11-23 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2681019 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | In Compliance with Policy | Routine partial inspection due to snow cover. Well appears to be in production. Production Foreman Ed Moorhead on site during inspection. |
2688162 | Primary Facility | 2018-01-30 | Routine/Complete Inspection | No Violations Noted | System producing. Emergency contact present. Well tag present. |
2705595 | Primary Facility | 2018-03-14 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Land owner present during inspection. |
2722182 | Primary Facility | 2018-04-24 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Review of plugging information |
2749853 | Primary Facility | 2018-06-27 | Drilling/Alteration | No Violations Noted | Bennet contracted conserv. Setting 600 ft of cement on bridge plug set at 8100. Well 2in production No issues at site |
2750778 | Primary Facility | 2018-07-02 | Routine/Complete Inspection | No Violations Noted | Well tag and emergency contact present. Well in production. 1H in process of being plugged. |
2751266 | Primary Facility | 2018-07-12 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Plugging of well 1H. Well 2H in production
Work completed on July 11 RIH and tag TOC at 2550 feet RU cement trucks Set a cement plug from 2550 feet up to 1750 feet with 83 sks of cement TOOH WOC RIH and tag TOC at 1750 feet Set a cement plug from 1750 feet up to 7
|
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1926070 | 598869 | 10/27/2010 | 2010-10-27 | 78.83GRNDWTR - Improper casing to protect fresh groundwater | Administrative | |
1926070 | 598870 | 10/27/2010 | 2010-10-27 | 78.83COALCSG - Improper coal protective casing and cementing procedures | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
598869 | 264074 | NOV - Notice of Violation | Comply/Closed | 2011-01-12 | |||
598869 | 287442 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-08-14 | 2012-08-14 | $39,650.00 | $39,650.00 |
598870 | 264074 | NOV - Notice of Violation | Comply/Closed | 2011-01-12 | |||
598870 | 287442 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-08-14 | 2012-08-14 | $39,650.00 | $39,650.00 |
For data sources see[8]