If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28596 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.363856,"lon":-79.299767,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 145495 | |
Farm/Lease Name: MCBROOM 1-2H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-05-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.363856 | |
Longitude: -79.299767 |
Date | Event |
---|---|
2011-05-16 | New Permit Application |
2011-05-23 | Performed Spud Operation |
2011-08-17 | Drilling Completion |
2011-10-02 | Perforation |
2014-05-12 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-10-06 | 2011-10-06 | 8,036 | 6,660,010 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00220000 | |
Water | Municipal Authority of Derry Borough | Carrier/Base Fluid | Water | 100.00 | 88.93 | |||
GBW-30 Breaker | Halliburton Energy Services | Breaker | Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00030000 | ||
Carbohydrates | 95.00 | 0.00190000 | ||||||
Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.10 | ||
LGC-36 | Halliburton Energy Services | Gel | Paraffinic Solvent | 100.00 | 0.00250000 | |||
Polysaccharide | ||||||||
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 10.92 | ||
BE-9M | Halliburton Energy Services | Biocide | ||||||
Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00110000 | |||||
Methanol | 67-56-1 | 30.00 | 0.00320000 | |||||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00200000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | 29,611.00 | 11 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 1,240,224.36 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 593,144.74 | 311 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 494,099.97 | 355 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 352,838.99 | 362 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 274,000.55 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 223,396.06 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 201,377.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 164,062.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drill Cuttings | 1,521.73 Tons | LANDFILL | 100277 |
2011 | XPR RESOURCES LLC | Fracing Fluid Waste | 1,152.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XPR RESOURCES LLC | Drill Cuttings | 814.49 Tons | LANDFILL | 100277 |
2012 | XPR RESOURCES LLC | Fracing Fluid Waste | 28,860.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XPR RESOURCES LLC | Produced Fluid | 5,597.65 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XPR RESOURCES LLC | Drilling Fluid Waste | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Drilling Fluid Waste | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2013 | XPR RESOURCES LLC | Produced Fluid | 1,420.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 446.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2013 | XPR RESOURCES LLC | Fracing Fluid Waste | 1,100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 4,870.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Drilling Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 704.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Synthetic Liner Materials | 17.75 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Produced Fluid | 528.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Fracturing Fluid Waste | 94,065.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Other Oil & Gas Wastes | 813.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 422.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 585.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2017 | XPR RESOURCES LLC | Produced Fluid | 1,155.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | XPR RESOURCES LLC | Produced Fluid | 256.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XPR RESOURCES LLC | Produced Fluid | 490.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 67.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | XPR RESOURCES LLC | Produced Fluid | 44.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 418.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1977273 | Primary Facility | 2011-05-31 | Routine/Complete Inspection | No Violations Noted | Inspection was conducted during construction of the pad. |
1985346 | Primary Facility | 2011-07-01 | Routine/Complete Inspection | No Violations Noted | Inspection was part of routine site visit. Met with company man and tool pusher. Tool pusher accompanied inspection. |
1986048 | Primary Facility | 2011-06-06 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1996476 | Primary Facility | 2011-08-02 | Routine/Complete Inspection | Pending | Inspection was in response to company man¿s report of foam in under drain leading to sediment trap. |
1998264 | Primary Facility | 2011-08-04 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2000753 | Primary Facility | 2011-07-28 | Routine/Complete Inspection | No Violations Noted | Inspection was in response to company man¿s (Anton Francois) report of oil based mud spill. |
2008858 | Primary Facility | 2011-08-30 | Routine/Complete Inspection | Pending | Site visit was part of routine inspection. |
2008861 | Primary Facility | 2011-09-19 | Routine/Complete Inspection | No Violations Noted | Inspection was follow-up from 8-30-11 site visit. |
2182388 | Primary Facility | 2013-06-06 | Drilling/Alteration | No Violations Noted | 6/6/2013 produced fluid tanks, GPU, and in production. |
2188014 | Primary Facility | 2013-07-25 | Routine/Complete Inspection | No Violations Noted | 7/25/2013 produced fluid tanks, GPU, and in production. |
2195646 | Primary Facility | 2013-08-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tank, and gas production unit appear to be in sound condition. The Department notes that the Operator will be actively drilling wells on the same pad and the drill rig was on site and placed on containment. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2200893 | Primary Facility | 2013-09-03 | Routine/Complete Inspection | No Violations Noted | See inspection # 2200890 for observations made on 9/3/2013. At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tank, and gas production unit appear to be in sound condition. The Department notes that the Operator will be actively drilling wells on the same pad and the drill rig was on site and placed on containment. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2211068 | Primary Facility | 2013-09-23 | Routine/Complete Inspection | No Violations Noted | 9/23/2013 produced fluid tanks, GPU, and in production. |
2217750 | Primary Facility | 2013-10-03 | Routine/Complete Inspection | No Violations Noted | 10/3/2013 drilling on 10H well at depth of 11,455'. inspected w/OGI P. Wyrwas. |
2219565 | Primary Facility | 2013-10-16 | Routine/Complete Inspection | No Violations Noted | 10/16/2013 drillig on the 12H @ depth of 3700’. |
2222834 | Primary Facility | 2013-11-05 | Routine/Complete Inspection | No Violations Noted | 11/5/2013 moving rig off pad. |
2237665 | Primary Facility | 2014-01-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tank, and gas production unit appear to be in sound condition. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2259072 | Primary Facility | 2014-03-26 | Routine/Complete Inspection | No Violations Noted | 3/26/2014 Produced fluids ttanks diked and GPU's |
2274302 | Primary Facility | 2014-05-20 | Drilling/Alteration | No Violations Noted | 5/20/2014 Produced fluids tanks diked and GPU’s |
2302599 | Primary Facility | 2014-08-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tank, and gas production unit appear to be in sound condition. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2347409 | Primary Facility | 2014-02-18 | Routine/Complete Inspection | No Violations Noted | 2/18/2015 Produced fluids tanks diked and GPU’s. Inspected w/OGI P. Wyrwas. |
2358850 | Primary Facility | 2015-04-07 | Site Restoration | No Violations Noted | Inspection in response to a "Well Site Restoration Report" file by the Operator on 11-3-2014. At the time of inspection all earth disturbance activities, authorized by the well permit were complete, and the site has been stabilized. Site appears to meet PCSM and BMPs have been removed. |
2440122 | Primary Facility | 2016-01-12 | Routine/Complete Inspection | No Violations Noted | Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Freshwater impoundment located on site and appears structurally sound. Site permanently stabilized with no signs of E& S issues in relation to site and/or access road. |
2474477 | Primary Facility | 2016-04-13 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production equipment-tank battery and dike look ok. |
2502330 | Primary Facility | 2016-07-18 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appear to in sound condition. Well labeled and no observation of accelerated erosion or sedimentation in relation to the well site or access road. |
2553547 | Primary Facility | 2017-01-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized with no signs of E& S issues in relation to site and/or access road. |
2554691 | Primary Facility | 2017-01-24 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2621666 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2690485 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Four brine tanks within secondary containment and appear to be structurally sound. No E&S issues.
Site id sign updated to reflect current Operator information. PPC plan and ERP appears to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violation issued (see inspection id 2690484). |
2755329 | Primary Facility | 2018-07-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Four brine tanks within secondary containment and appears structurally sound. No E&S issues. |
For data sources see[8]