X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28602

Well Details

Well ID: 37-129-28602
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Donegal Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 144593
Farm/Lease Name: BRADY
License Status: Plugged and Abandoned
Spud Date: 2011-08-04
Permit Date: 2011-05-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.127247
Longitude: -79.384347

For data sources see[1][2][3]

Well History

Date Event
Deviated
2011-05-24 New Permit Application
2011-06-11 Performed Spud Operation
2011-09-10 Drilling Completion
2015-12-02 Begin Plugging
2015-12-07 Finished Plugging
2019-10-23 Fully Plugged

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-06-07 2012-06-07 8,063 3,632,840

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Municipal Authority of Derry Borough Carrier/Base Fluid Water 100.00 87.48
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 12.35
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00100000
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.11
WG-36 Gelling Agent Halliburton Energy Services Gel Guar gum 9000-30-0 100.00 0.00200000
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00400000
BE-9M Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00500000
Methanol 67-56-1 30.00 0.01
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2013 XPR RESOURCES LLC 128,206.98 153 0.00 0 0.00 0
2014 XPR RESOURCES LLC 154,901.65 323 0.00 0 0.00 0
2015 XPR RESOURCES LLC 108,684.53 326 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XPR RESOURCES LLC Drill Cuttings 519.66 Tons LANDFILL 101571
2013 XPR RESOURCES LLC Produced Fluid 9,228.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XPR RESOURCES LLC Produced Fluid 6,340.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Servicing Fluid 700.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Produced Fluid 3,495.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1994399 Primary Facility 2011-06-21 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Spud had been called in and conductor had been drilled.
1994435 Primary Facility 2011-07-29 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2002896 Primary Facility 2011-08-04 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2002899 Primary Facility 2011-08-12 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2002925 Primary Facility 2011-08-26 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2004364 Primary Facility 2011-09-12 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2005146 Primary Facility 2011-09-26 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2013920 Primary Facility 2011-10-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2034693 Primary Facility 2012-01-11 Routine/Complete Inspection Violation(s) Noted Site visit was part of routine inspection.
2043006 Primary Facility 2012-02-10 Compliance Evaluation No Violations Noted Site visit was a compliance evaluation for the 1-11-12 violation.
2117327 Primary Facility 2012-11-21 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2438626 Primary Facility 2015-12-03 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Brady 1-2H well. Casing and tubing had 50 psi. Pressure was bleed off. 35 bbl. of production water was pumped into tubing. BOP was tested to 2500 psi. Renegade wireline was set to depth of 7500 feet. On December 3, 2015, WPX pumped cement plug form 7500 ft. to 2700 feet by setting 1000 ft. intervals. The plug was set by using 113 bbl. with 485 sacks of 15.2 # Class A cement (1.25 yields).
2438628 Primary Facility 2015-12-03 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Brady 1-2H well. Casing and tubing had 50 psi. Pressure was bleed off. 35 bbl. of production water was pumped into tubing. BOP was tested to 2500 psi. Renegade wireline was set to depth of 7500 feet. On December 3, 2015, WPX pumped cement plug form 7500 ft. to 2700 feet by setting 1000 ft. intervals. The plug was set by using 113 bbl. with 485 sacks of 15.2 # Class A cement (1.25 yields).
2438658 Primary Facility 2015-12-07 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX completed the process of plugging Brady 1-2H well. On December 4, 2015 WPX cleared hole to 2700 feet. Cut 5.5 inch casing to 2690 feet. Ran 2 3/8 inch tubing to 2700 feet. Pumped 54 bbls comprised of 243 sacks of 15.2 # Class A cement (1.25 yields). Plug was set at 2700 feet to 2000 feet. On December 7, 2015, WPX set final cement plug at 1950 to surface using 700sacks (153.5 bbl.) of class A 1.25 yield. .
2438789 Primary Facility 2015-12-10 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Brady 1-4H well. WPX set cement tubing at 7510 feet. C&J cementers cemented 5.5” casing from 7510 feet to 2100 feet using 122 bbl. comprised of 550 sacks of 15.2 # 1.25 Class A cement. Cement was pumped in plug intervals of 1000 feet and laying down tubing between plugs. On 12/10/15, Casing was cut at 2070 feet. C&J cement set cement plug from 2070 feet to 1780 feet using 22.5 bbl.with 100 sacks of Class A. On 12/11/15, C&J cementing set a plug from 1789 feet to surface with 140 bbl. using 630 sacks of Class A.
2526027 Primary Facility 2016-10-05 Routine/Partial Inspection No Violations Noted Well plugged. See inspection #2525926 for additional observations made during the10/5/2016 site inspection.
2530404 Primary Facility 2016-10-20 Routine/Partial Inspection No Violations Noted Well plugged. See inspection # 2530397 for additional observations made during the10/20/2016 site inspection.
2605911 Primary Facility 2017-06-20 Follow-up Inspection No Violations Noted Well plugged. No monument observed. See inspection report #2605906 for additional observations made on 6/20/2017.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2034693 629457 01/11/2012 2012-01-11 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
629457 279401 NOV - Notice of Violation Comply/Closed 2012-02-10
629457 298376 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-05-23 2013-05-23 $9,500.00 $9,500.00

For data sources see[8]

References